EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.

Slides:



Advertisements
Similar presentations
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Advertisements

1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Active Safety Systems + EHN1: Draft EN/EL proposal for replacement of Nano PLC 1.Current situation 2.Requirements definition 3.Current solutions (Atlas/CMS)
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
09 July EHN1 civil engineering project status (JUNE) Summary: Updating of the activities carried out on-site (Done) in JUNE List activities on going.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Building 867 Project TE/MPE workshop status and schedule Presented by Tony Fowler, TE-ABT on behalf of the Project Team 28/09/2010Building 867 Project:
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
NA YETS: schedule week by week S. Evrard.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015.
CENF CIVIL ENGINEERING : - DESIGN TENDER AND ESTIMATED COSTS John Osborne GS/SE 19 July 2013.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
Extraction and beamline progress B.Goddard TE/ABT.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
EHN1 – EN/EL Planning Lighting _ Containment_ Cabling J. Devine G. Gross 11/02/16.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
EHN1 – EN/EL Progress update J. Devine 25/02/16. Integration – Jura Substation Position updated to avoid clash with door. Meeting next week for Civil.
Proposal for rerouting of buried electrical networks and optical fibres at Point 1 LS2 Committee meeting S. Bertolasi on behalf on EN/EL WP17.2 HL-LHC.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
The Next Generation of a Gamma Irradiation Facility GIF++
SPS Personnel Protection System Renovation Project
Linac4-PSB 160 MeV connection readiness review
Safety in the Neutrino Platform Hall
EHN1 Extension planning
San Luis Potosi – New plant April 24th 2015
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
LIU – EVM status and next steps
Budget specification EHN1 Extension: Infrastructure (WG2)
CE Status: Activities executed until 03/08 and ongoing
YETS & LS2 Reminder G. Girardot 20 juin 2017.
EHN1: CE Integration process updating
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
prepared by R.A.Barlow 30/056/2016
EN-HE SPS works during EYETS
Teleconference ACS – FREIA 31st October 2017
SPS Planning for the EYETS Meeting 8 (07/12/2016)
A very first look at siting issues
RWTCS Steering Commitee
Status with crucial LSS5 kicker transmission line cables
East Hall under construction
BE-ICS work for SPS Safety Systems
Key Issues CPOC Update February 2011 Second Avenue Subway TBM Drive #1
Far Experimental Hall Hutches Civil Construction
Radiological and Environmental Monitoring System (REMS)
East Hall under construction
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16

Integration – Jura Substation Argon extraction blocks door opening for EL switchboards in current position. Re-location of substation to zone in existing building being studied – liberates space for other users. Integration images – Jerome Chatron

Site progress Earthing installation ongoing, following civil engineering

Lighting Temporary lighting will be installed when access is available – date TBC Hired via EMTE contract for duration TBC. Permanent lighting requires gantry crane for efficient installation, therefore cannot be advanced.

Planning - Containment Quotation ready – need CB to launch works Technical gallery – available for early start once waterproof, date TBC General containment constraints for early start: Access to hall for equipment (2 cherry pickers + 1 manitou)? Delivery of containment into hall – without finished road? 4-5 weeks work, with junctions to existing building to follow (2 weeks, second phase?) Possible without gantry crane – if these questions resolved. Beamline containment: Requires installation of shielding and magnets Duration 1-2 weeks per line (H2/H4) Predecessor to DC cabling + Instrumentation. Containment not constrained by EYETS.

Planning - Cabling Analysis of DIC’s received so far in progress How to install cables for equipment which follows in the installation schedule? Beam line sensors, BI Magnets – all DC cabling

Planning - Cabling DIR’s URGENTLY Required Analysis of DICs so far (80-90% complete) DC for H4 – ? < tracing in March/April, no installation before- planning to be checked. DC for H2 – ? Total for DC – 4 weeks minimum, to be confirmed Magnets must be installed first Containment required before installation Control cables – To be confirmed Second campaign contents – ODH, GAS, Fire detection missing DICs – due to risk assessment. End date for campaign one – 9 th December (start of EYETS 12 th Dec) Start date for campaign two – 1 st April 2017 (end of EYETS)