3rd BERCEN Exchange Programme for the Environmental Enforcement Agencies and Inspectorates, October 19-22, 2004 Prague, Czech Republic Achievements in.

Slides:



Advertisements
Similar presentations
Implementation of waste management plans in Serbia 2013 workshop on Waste Policy Implementation May 2013 Copenhagen.
Advertisements

Industrial Pollution Control and Risk Management: IPPC Neil Emmott Environment Directorate-General 7 April 2006.
Law approximation and implementation in Hungary Ministry for Environment Department of Integrated Pollution Control Nicosia, May 2001 Andrea Nám, desk.
BULGARIAN COMPETENT AUTHORITIES IN THE FIELD OF IPPC Kalin Iliev Ministry of Environment and Water Bulgaria.
SERBIA AND MONTENEGRO Tanja Popovicki Department for International Co-operation Ministry for the Protection of Natural Resources and Environment of the.
Public Procurement Agency Public Procurement System in Bosnia and Herzegovina.
Komitet/Potkomitet BiH Steering Committee and Sub-Committee of Bosnia and Herzegovina Kyoto Implementation- Opportunities for Bosnia and Herzegovina The.
LEGAL AND INSTITUTIONAL FRAMEWORK OF WATER RESOURCES MANAGEMENT Semra Fejzibegović, Bc.Sc. In Mech.Eng. Hydro-Engineering Institute Sarajevo, Bosnia and.
ECENA 4 th Exchange Programme Cluj Napoca, October, 2005 National Updates in the Transposition and Implementation of IPPC directive Ministry of Environment.
REGIONAL WORKSHOP "AGRICULTURAL NUTRIENT POLLUTION CONTROL IN BLACK SEA DANUBE PARTNERSHIP COUNTRIES" Ministry of the Agriculture and Water Management.
Local Self Government in environmental management Jadranka Ivanova Head of EU Department Ministry of Environment.
Integrated Control of Industrial and Chemical Substances in Cyprus Integrated Control of Industrial and Chemical Substances in Cyprus Final Conference.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
BAT as a main tool for minimisation of the negative impact of industrial activities Aivi Sissa Tallinn – Estonia 27 – 28 March 2008.
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
Croatian Report on new Environmental Protection Law Josipa Blažević-Perušić, B.Sc. Arch. State Secretary Anita Pokrovac-Patekar, B.Sc. Pharm. Senior Environmental.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
EU ACCESSION PROCESS ECENA Plenary Meeting Zagreb January 2006 Carmen Falkenberg Ambrosio - European Commission.
GEF IN TAJIKISTAN Dr. Neimatullo SAFAROV CBD and CPB National Focal Point Republic of Tajikistan.
ECENA Exchange Programme First Plenary Meeting January, 2006 Zagreb, Croatia Update on strengthening the implementation and enforcement of EU environmental.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
Third BERCEN Plenary Meeting December 16-17, 2004 Brussels, Belgium Key Achievements in Environmental Enforcement and Compliance in the Republic of Montenegro.
AIR QUALITY MINISTRY OF SCIENCE AND ENVIRONMENTAL PROTECTION REPUBLIC OF SERBIA Dusanka Stanojevic Directorate for.
1 Permitting of industrial facilities in Croatia.
Consultant: CMDC Joint Venture Reflections on draft Recommendations for Revision to Administrative Regulations: By Norman Sheridan, Legal & Institutional.
ECENA First Plenary Meeting January, 2006 Zagreb, Republic of Croatia Forthcoming obligation related to implementation and enforcement of EU legislation.
Ministry of Energy, Development and Environmental Protection of the Republic of Serbia Development of the Ecoregister, a national metaregister for environmental.
Kavala Workshop 1-2 June 2006 Legal protection of Transitional Waters [in the Cadses area]: A comparative analysis Dr. Petros Patronos / Dr. Liliana Maslarova.
The Process of Development of IPPC Legislation Robert Sarlamanov MA, IPPC Expert Ministry of Environment and Physical Planning, Bercen Exchange Programme,
Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic.
Lisbo n, Novem b er Bosnia and Herzegovina Ministry of Civil Affairs Sector for Health COMMUNITY AGENCIES: PARTNERS IN ACCESSION The point.
First ECENA Plenary Meeting Zagreb, January 2006 Item 19 B&H’s obligations in the field of environmental priorities within the European partnership.
SEVESO II transposition and implementation – possible approaches and lessons learned from MS/NMS SEVESO II transposition and implementation – possible.
BOSNIA AND HERZEGOVINA COUNTRY REPORTING SYSTEM Presenters: Ms. Mira Grgic Mr.Ozren Laganin.
Dzidra Hadonina Ministry of the Environment of the Republic of Latvia Kiev, Ukraine, November 22-24, 2004 Legal Framework for Cooperation in the River.
Financial assistance to environment - outside the EU Brussels, 28 th May 2009 World Bank event Joanna Fiedler European Commission DG Environment.
PPSD in specific sectors in Bulgaria - Regional Plans for Development National Programme for Ports Development (2006 – 2015) Vania Grigorova, Jacquelina.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
Stabilisation & Association Process: the EU Policy for South East Europe Brussels December 2004.
First ECENA Plenary Meeting January 2006, Zagreb Croatia Serbia-Update on strengthening the implementation and enforcement of EU environmental legislation.
Report on reforms in environmental policy and reconstruction Republic of Serbia, Serbia and Montenegro 8 th REReP Task Force meeting September 23, 2005.
SEA in the Czech Republic Prague, 24 September 2008.
Twinning project ENEA – ENforcing Environmental Acquis Skopje, 19 th of November, 2015.
1 Third BERCEN Plenary Meeting Brussels, December 2004 Agenda item 13 Key achievements in environmental enforcement and compliance - discussion on.
How to start with the implementation of IPPC Directive Czech Republic Czech Environmetal Inspectorate.
Third BERCEN Plenary Meeting December , Brussels Belgium The key achievements in environmental enforcement and compliance REPUBLIC OF SERBIA.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
Consultant: CMDC Joint Venture Czech experience - Use of BREFs and national BAT notes, role of IPPC Agency, Czech TWG Multi-Country Workshop June 8th,
Achievements in IPPC Directive Implementation: problems and constraints Albania Ministry of Environment 3 rd BERCEN Exchange Programme for the Environmental.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
New approach in EU Accession Negotiations: Rule of Law Brussels, May 2013 Sandra Pernar Government of the Republic of Croatia Office for Cooperation.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 32 – Financial control Bilateral screening:
Report on reforms in environmental policy and reconstruction Bosnia and Herzegovina 8th REReP Task Force meeting September 23, 2005 Brussels, Belgium.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 The IPPC Directive Introduction to the philosophy Rob Kramers.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
Strategic Environmental Assessment for the Operative Programmes Anita Gulam Ana Kovačević Ministry of Environmental and Nature Protection, Republic of.
Federal Ministry for the Environment, Nature Conservation and Nuclear Safety, Germany Environment Agency (UBA), Germany Federal Agency for Nature Conservation.
Introduction to the philosophy
Seminar ”Environmental law clinic“ Banjaluka,
INTEGRATED PERMITTING PROCEDURE IN THE CZECH REPUBLIC
PRESENTATION OF MONTENEGRO
REReP regional meeting on “Energy and climate” in South Eastern Europe
Relationship between World Bank and Romanian EA requirements
BERCEN Plenary Meeting Budapest, September 9, 2002 Agenda item 4
IPA 2008 – support to environment Brussels, 28th November PEIP Regional Meeting Joanna Fiedler European Commission DG Environment.
Presentation transcript:

3rd BERCEN Exchange Programme for the Environmental Enforcement Agencies and Inspectorates, October 19-22, 2004 Prague, Czech Republic Achievements in IPPC Directive Implementation: problems and constraints Country presentation of Bosnia and Herzegovina By: Ozren Laganin Ministry of Physical Planning, Civil Engineering and Ecology of Republic of Srpska Trg Srpskih Junaka 4, Banja Luka Tel , Fax: ,

Country’s Flag: Land area= 51,209 km 2 Population (Census, 1991) = 4,377, 033 /85,5 inh. per km 2 Country’s Human Development Index (HDI) in 2001 was 0,777; indicating its medium-scale development (UNDP, 2002) BOSNIA AND HERZEGOVINA

PHYSICAL CHARACTERISTICS Country is positioned in SEE region, Balkan Peninsula, bordering to the N, W, and SW to Croatia (932 km ), and to the east to Serbia and Montenegro (606 km). 13 km long coastline along the Adriatic Sea around the town of Neum Territorially, country is comprised of two entities: Republic of Srpska (64 municipa- lities), Federation B&H (10 cantons ), and District of Brcko (BD)

DEVELOPMENT OF ENVIRONMENTAL LEGISLATIONAND ADMINISTRATIVE STRUCTURE Asymmetrical country’s institutional structure (cantons and municipalities), and increase in the number of government institutions, have caused growing consumption in the public sector, accounting to well beyond the level that can be sustained in the medium term Environmental issues are crosscutting different departments, and therefore, there are competences and synergies with departments other than environment and physical planning (i.e. mining, industry, transport). Even though NEAP and PRSP have given the strategic framework, there is no policy describing the intended role for the administration concerned

The Law on Environmental Protection New Law on Environmental Protection adopted in both entities The law prepared in accordance with the most important EU directives in this field, including: - IPPC Directive on Integrated Pollution Prevention and Control; - Seveso II Directive on prevention of Larger Accidents; - EIA Directive on Environmental Impact Assessment of Large Industrial and Infrastructure Projects. The new Law on environmental protection provide a framework for environmental protection, and it will be required to develop by-laws necessary to make integrated pollution prevention and control operative and effective.

Environmental permitting Control of activities or installations by: Specific obligations and requirements for these activities or installations Requirement of an environmental permit Documentation in a Register of Installations and of Pollution Monitoring Regular inspection Remedial measures against pollution

The application for an environmental permit has to include: the name and address of the operator/investor The site of the installation, and description of: 1. the plants and installations, and its activities (plan, technical description of the process etc.); 2.the raw and auxiliary materials, other substances and energy used in or generated by the plants and installations; 3. the sources of the emissions from the plants and installations; 4. the conditions of the site of the installation; 5.the nature and quantity of foreseeable emissions from the installation into each medium (air, water, soil) as well as identification of significant effects on the environment (impacts); 6. the proposed measures, technology and other techniques for preventing, or, where this is not possible, reducing emissions from the installation; 7. measures for the prevention and recovery of waste generated by the installation; 8.further measures to comply with the basic obligations of the operator, especially the measures after closure of the installation; 9.measures planned to monitor emissions into the environment and/or their impacts, 10. planned alternatives: 11. the copy of the application for acquisition of other permits which will be granted together with the environmental permit and 12. non-technical summary

CONTENT OF ENVIRONMENTAL PERMIT Issuance of the Environmental Permit –Content: The environmental permit must contain the following: - emission limit values for pollutants; - requirements for protection of air, soil, water, flora and fauna; - measures concerning the management of waste generated by the plants and installations; - measures for minimization of long-distance or transboundary pollution; -self-monitoring system, specifying measurement methodology and frequency, and - measures relating to conditions other than normal operating conditions. Emission limit values, equivalent parameters or technical measures are based on best available techniques taking into account the technical characteristics of the installation, its geographical location and the local conditions.

Environmental permitting Existing installations Installations defined in implementing regulation of this Law for which an environmental permit has been issued before the coming into force of this Law have to have an environmental permit by 2008, at latest. The Entity Ministries have to set deadlines for the application for an environmental permit for specific types of existing installations and to adopt specific Rulebooks - Adjustment Plans

Environmental permitting Reconsideration and updating of permits Environmental permit is valid for five years Competent Ministry has to reconsider and update the environmental permit where: - the pollution caused by the installation is of such significance that the existing conditions and emission limit values; - substantial changes in the best available techniques make it possible to reduce emissions significantly without imposing excessive costs or - o perational safety of the process or activity requires other techniques to be used.

Environmental Permitting Public participation in decisions on environmental permit The public concerned shall be informed, immediately after the administrative procedure started: - The proposed activity and the application on which a decision will be taken; - The nature of possible decisions or the draft decision; - The public authority responsible for making the decision; - The envisaged procedure, including, if available, information on : a) The opportunities for the public to participate; b) The time and venue of any envisaged public hearing; c) An indication of the public authority from which relevant information can be obtained and where the relevant information has been deposited for examination by the public; d) An indication of the relevant public authority or any other official body to which comments or questions can be submitted and of the deadline for comments or questions; e) An indication of what environmental information relevant to the proposed activity is available, f) The fact that the activity is subject to a entity or transboundary environmental impact assessment procedure, and - Draft of environmental decision or permit.

MAJOR TA PROJECTS RELATED TO THE EIA AND IPPC PHARE (2000) Draft environmental framework laws were drafted for both entities comprising an overall “umbrella” “Framework Law for Environmental Protection” and separate laws for water protection, waste management, air protection, and for nature protection THE WB FUNDED NEAP PROJECT With World Bank support, a National Environmental Action Plan (NEAP) was prepared during It provides a clear impression of the needs, and did contribute to awareness raising METAP The World Bank METAP project has funded two projects to develop EIA documents and a methodology, while providing training. These documents are widely based on EU best practice. As a result, there have been important work done related to the introduction of EIA, in the sense of preparation of legal framework and methodology, and training

… CARDS 2002 “Institutional Strengthening in Environmental Management”, which includes a volet on EIA “Development of a National Environmental Monitoring System”, “Support for Improved Waste Management”, and “Support to Water Institutional Strengthening II” CARDS 2003 Waste Recycling Pilot Project Water Quality and Quantity Monitoring TA to the development of an Environment Fund Environment Field Inspections

… Previous, ongoing, and planned TA for environmental institution building legislation includes: Legislation and institution building for river basin management under the EU’s project “Water Institutional Strengthening in Bosnia and Herzegovina” Phases I Legal consultancies to be conducted/coordinated by the Regional Environmental Center (REC), supported by the EC in the framework of the Regional Environmental Reconstruction Programme (REReP) World Bank assisted projects for the “Urgent Strengthening of Environmental Institutions in Bosnia and Herzegovina” which included the preparation of EIA documents and training Legislative work supported by the World Bank and others as a follow-up to the National Environmental Action Plan (NEAP) World Bank solid waste management programme Several initiatives funded by the EC LIFE Third Countries budget

KEY RISKS AND ASSUMPTIONS Understaffing problem within the ministries Willingness of authorities to cooperate and to support the EIA- related activities Currently low level of environmental management Weak enforcement of environmental legislation; Division of competencies between authorities; Misunderstandings between authorities and industry; Integration EU requirements and directives ;

ONGOING ACTIVITIES LEGISLATIVE FRAMEWORK WORK ON DRAFTING OF EIA RULEBOOK AND OTHER BY-LAWS, IN ACCORDANCE TO THE CARDS PROJECTS (Support for Capacity Building for Environmental Management in Bosnia and Herzegovina, Support of improved Waste Management, and Support for Institutional strengthening in B&H) OTHER ACTIVITIES adoption of the RECOMMENDATIONS FOR MINIMUM OF JOIN CRITERIA FOR ENVIRONMENTAL INSPECTION IN BOSNIA AND HERZEGOVINA, on January 29 th 2004 in Sarajevo, firstly accepted by the Environmental Steering Committee in Banja Luka on December 22 nd 2003

FOLLOWING ACTIVITIES DEVELOPMENT OF BAT/BREF GUIDELINES ESTABLISHMENT OF THE IPPC OFFICES AT DIFFERENT LEVELS AND THE COORDINATION PATTERNS CREATION OF THE CENTRAL BAT DATABASE AND DATA MANAGEMENT MANNUALS IMPROVED PUBLIC PARTICIPATION through consultation and information accessibility facilitation …

THANK YOU FOR ATTENTION!!!!!