Status report on the development of a TPC readout system based on the SALTRO-16 chip and some thoughts about the next step Leif Jönsson AIDA Meeting Vienna.

Slides:



Advertisements
Similar presentations
Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
Advertisements

Front-end electronics for the LPTPC  Connectors  Cables  Alice readout electronics  New developments  New ideas  Open questions Leif Jönsson Phys.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
N-XYTER Hybrid Developments Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Status and outlook of the Medipix3 TSV project
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
AIDA FEE64 production report June 2011 LYCCA tests and MBS Production of FEE64 Preparation for October test. 13th June
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
W. EbensteinDOE Review Duke UniversitySeptember 1999 TRT Barrel Cooling: Electronics  Motivation: u Overheating of electronics causes premature failure.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Current TPC electronics P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 18, 2014.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Module Development Plan I believe that we are ready to proceed to a program to demonstrate a PS module based on “2.5 D” interconnections. This is based.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
Status of NA62 straw electronics Webs Covers Services Readout.
1 10 th October 2007Luciano Musa Considerations on readout plane IC Area (die size) 1-2 mm 2 /channel Shaping amplifier 0.2 mm 2 ADC0.6 mm 2 (estimate)
TPC electronics for ILD P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 24, 2013.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
TPC electronics Status, Plans, Needs Marcus Larwill April
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Electronics for CEDAR Cristina Lazzeroni, Marian Krivda, Richard Staley, Xen Serghi, Karim Massri University of Birmingham, UK 3/5/
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
AIDA 3rd Annual Meeting1 First test of MCM prototype board 1 G. De Lentdecker 2 L. Jönsson 2 U. Mjornmark 1 Y. Yang 3 F. Zhang 1 Université Libre de Bruxelles.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Development of the readout electronics a status report Leif Jönsson Collaboration meeting Santander
Development of the readout electronics in Lund for the ILD TPC Vincent Hedberg, Leif Jönsson, Anders Oskarsson, Björn Lundberg, Ulf Mjörnmark, Lennart.
The SALTRO16 system. From ALTRO to SALTRO16 A decrease in size by a factor mm 32.5 mm FEC MCM 8.9 mm 25 mm 170 mm Pad Module 19 cm 17 cm 32.5 mm.
n-XYTER Hybrid Developments
Status of the TPC readout electronics
Markus Friedl (HEPHY Vienna)
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
The future readout system based on SALTRO16
SUMMARY OF THE ORSAY LD-TPC ELECTRONICS MEETING
Design of a Multi Chip Module
Large Area Endplate Prototype for the LC TPC
T1 Electronic status Conclusions Electronics Cards:
TPC electronics for ILD
Status of the EUDET Prototype
SALTRO16 activities in Lund
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

Status report on the development of a TPC readout system based on the SALTRO-16 chip and some thoughts about the next step Leif Jönsson AIDA Meeting Vienna

LowVoltage boards attached to one pad module MultiChipModules on a pad module The Large Prototype TPC Scalable Readout Unit (SRU) Detector Control System – Master module Detector Control System – 5to1 slave module Overview of the SALTRO16 readout system

From ALTRO to SALTRO16 A decrease in size by a factor 40 of the front end electronics 190 mm 32.5 mm FEC MCM 8.9 mm 25 mm 170 mm 19 cm 17 cm 32.5 mm 25 mm 8.9 mm 12 mm FEC with 8 ALTRO MCM with 8 SALTRO on carrier boards Carrier Board Carrier Board PCB CPLD Pad Module Side views of an MCM

Status of the Carrier Board Carrier Board with SALTRO chip mounted Bottom side of the Carrier Board with tin balls  A test sample of three Carrier Boards with bonded SALTRO-chips are ready  There has been some problems with the application of the epoxy layer  A new molding fixture had to be fabricated and new material with smaller surface tension had to be found

Test set-up for testing SALTRO16-chips on Carrier Boards  Some modification of the CERN test board was necessary to fit our system  The test set-up is assembeled and the communication to the CERN test board has been established with packaged SALTRO16 chips. Lund test socket board CERN test board Test socket

The final MCM-board Top side Bottom side  The MCM-board will be redesigned in HDI-technology (High Density Interconnect)  The number of layers can be reduced (from 20 layers to 10 ?).  This is a useful exercise for the design of the final front end electronics.  The Panasonic connectors, which link the MCM-board to the padplane have arrived.  The Samtec connectors on the top side of the board have also been delivered.  We plan to produce a mock-up system to make sure that the mounting of the Carrier Boards and the connectors does not create problems. 25 mm 32.5 mm

Complication with connectors The problem with the male connectors on the upper side of the MCM-board is that the female partner can not be mounted on a vertical LV-board. This has forced us to introduce an adaptor board and a pair of additional connectors, which are suited for such mounting. The MCM-board plus the adaptor board can be regarded as a unit, which will not be separated. The mock-up system will also be used to test that everything fits together

The MCM-development board (stand alone board)  Three MCM-development boards have been prepared (Lund, Brussels and Wuhan Univ.) and sent to Brussels for mounting of SALTRO-chips.  The purpose is to develop firmware for communication between the SALTRO-chip and the CPLD (Yifan Yang), and the SRU (Fan Zang), respectively.  SALTRO-chip in CQFP208 packaging.  The first tests in Brussels were succesful - The firmware for the CPLD was installed and communication between SALTRO and CPLD was established. - Communication with the SRU could also be established  Readout via ALICE DDL worked but data was corrupt due to the firmware, which has to be modified  We have decided to use ethernet connection for readout and control 20.6 cm 14.5 cm CPLD SALTRO

LV-prototype board and the final LV-board  The Low Voltage Prototype Board is used to test the concept of the final LV-board.  It will also supply the test set-up with voltage and provide some configuration.  The board is ready and has been succesfully tested together with the test set-up.  For the final LV-board the concept is ready. We are waiting for the positioning of the cooling pipes and the final design of the mechanical support. LV-prototype board 10 cm 16 cm

The Detector ControlSystem ~700 parameters from the LV- and MCM-boards has to be monitored per module DOOCS will be used  The two boards have been successfully tested  Will be used for tests of SALTRO-chips mounted on Carrier Boards

Summary of the status and future work  The test set-up for testing SALTRO-chip mounted on Carrier Boards is assembled.  Three Carrier Boards with bonded chips have been produced although the application of the epoxy layer is still missing. When the top side is completely ready, tin balls are going to be applied on the bottom side.  The functionality of the test set-up will be tested using an unmounted Carrier Board.  The next step is to test the three mounted Carrier Boards to investigate the performance of the Carrier+SALTRO.  If ok bonding of the remaining SALTRO-chip and testing. If not ok another iteration of the Carrier Board design.  Production of a mock-up system with dummy Carrier-, MCM- and adaptor boards to verify the soldering procedure and check that the various parts fit together.  The design of the final MCM-board will be completed and the PCB ordered.  As soon as the mechanical support structure and the layout of the cooling pipes is fixed the design of the LV-board can be finished.  Modification of the firmware for the CPLD and the SRU and further tests of the communication.  Development of an Ethernet based DAQ-system and common DAQ integration.  Tests of a complete readout chain. Several activities going on in parallel

What have we learned so far ?  The SALTRO-chip is not an ideal solution but required many cumbersome compromises in the PCB-design -too many connectors to interconnect the various subsystems -too many voltage levels  bulky voltage supply -too many functions set external (gain, shaping time, decay time etc.) -bulky cooling system  Further, the new chip has to have a higher channel density

What can be done better in the future ? Chip design: - the new chip should have ≥ 64 channels - lower power consumption with fewer voltage levels - integrate functions that are now provided externally - should have a fast serial bus PCB design = Pad plane design: - design pad plane in HDI technology (higher routing density both for signals and voltage supply). - this technology offers the possibility to create cavities in the PCB where electronic och mechanical components can be mounted and thus embedded into the PCB so that essentially the full surface is available for surface mounting of chips. - this technology may also offer a solutionto integrate cooling into the PCB (development project together with PCB manufacturer) - chips mounted on small carrier board in 3D technology, where the carrier boards are bump bonded onto the pad plane These two development projects should not proceed separately but there should be continous interaction to arrive at an optimal solution

The principle of HDI-design (High Density Interconnect)

Estimated fraction of work remaining: 40% The project has significanlty expanded since the AIDA-application. Fraction of AIDA money spent: 100% Usage of DESY test beam infrastructure:June 2011 Sept 2012 Dec 2012 March 2013 June 2013 Nov 2013