Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.

Slides:



Advertisements
Similar presentations
Trigger Validation Board PVSS panels tutorial 1. TVB components 2 FPGA controls :  FPGA HCAL hadron trigger  FPGA EPPI electron, photon, pi0, Global.
Advertisements

1 The ATLAS Missing E T trigger Pierre-Hugues Beauchemin University of Oxford On behalf of the ATLAS Collaboration Pierre-Hugues Beauchemin University.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Muon commissioning status and plans G.P. C. De Plano.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Slide 1 / 14 PSFEB Status Report LHCb Clermont Production Test preview of the PreShower Front-End Boards February the 1 rst, 2007.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
Trigger Tests Patrick Robbe, LAL Orsay, 8 Feb 2012.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
Laboratoire de l’Accélérateur Linéaire, Orsay, France and CERN Olivier Callot 18 March 2003 Online Data Format and Condition Database Proposed data format.
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Olivier Callot 4 July 2002 The L0 Calorimeter Trigger Basic principles Overall organization.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
27SEP2008Calo Running and Operation Monday Meeting - Xvc1 ECS Xavier Vilasis-Cardona.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
1 L0Calo ECS. 2 Introduction L0Calo consists in several boards: –In the cavern: Front-End Boards, Trigger Validation Boards and SPD Multiplicity Boards.
M.N Minard Trigger Validation Board Tests and Implantation Cyril Drancourt, Pierre-Yves David,Victor Coco, Thomas Chouvion,M.N Minard - Production status.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
ST Analysis: Introduction M. Needham EPFL. Outline Aims of the meeting Releasing code Performance Monitoring Results (IT and TT): Active fraction, noise.
TAB-To-L3(Tape) ● At the L1Cal2b sidewalk test stand we have a setup to transmit the data coming from detector to tape using the new system. ● We installed.
- LHCb calorimeter upgrade April 15th, News and ideas on DAQ architecture Frédéric Machefert LAL, Orsay.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Rainer Stamen, Norman Gee
Preparation for CERN test beam
Calorimeter Upgrade Meeting - News
Bad Runs Alberto Oliva, July 2012.
Presentation transcript:

Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008

2 Summary Full DAQ chain tested:  cosmics are seen in ECAL, HCAL, PRS and SPD Cosmics are triggered with ECAL and HCAL in coincidence ECAL/HCAL are time-aligned with Muon both in DAQ and Trigger.

3 Operations (1)‏ Data are recorded either:  from the main console  or from the CA1 calorimeter global project: this now works « fine » (ie after 1 or 2 or N days of struggle we have data on disk)‏ One try was made to take cosmics interleaved with LED in the same run. My interpretation was that it was not 100% successful but it has to be redone. Databases:  For the Selection Boards, we now use the ConfigurationDB: the configuration recipes are taken from the Database.  Then we know when we analyse the data what was the configuration applied to the boards.

4 Operations (2)‏ Databases:  The plan is to use for the Selection Boards also: the archive database, to store and retrieve later the values of key registers, such as the masks to know later what was the real configuration when we took cosmics the « condition » database, to be able to tell automatically to the monitoring software what boards are masked in order not to detect fake errors.  The same thing would also be useful (at least): For the TVB to know the masks applied For the Maraton power supplies to follow the current in each crate (maybe useful to locate problems with M24 serializers): I will provide Vincent with a list of quantities we would like in the archive database

5 Operations (3)‏ HV:  phone call to Anatoly to setup the high voltage on Calorimeters, now put it at Cosmics gain also on Inner ECAL parts to collect useful data for Yasmine's analysis.  HV is decreased by Anatoly to nominal HV (or to 0) when cosmics runs are finished. Timings:  One cosmics run has been taken with fine tunings for timing settings for HCAL, but not with ECAL yet.  ECAL fine tunings to be used at the next occasion.

6 Last Cosmics Run: HCAL (1)‏ Position of triggers in HCAL One problematic Front-End Board, removed from the Trigger: has been replaced successfully yesterday One hot channel

7 Last Cosmics Run: HCAL (2)‏ Comparison DAQ/Trigger The masked board (solved)‏ Some border effect when choosing the candidate address in the software (solved)‏ The HCAL path alone is OK !

8 Last Cosmics Run: HCAL (3)‏ Since an empty plot is not convincing... Introducing artificial bug in neighbour treatment:

9 Last Cosmics Run: HCAL (4)‏ SumEt (difference between seen and expected, all errors are due to the missing board)‏

10 Last Cosmics Run: ECAL (1)‏ 5 masked boards (see later): replaced last week Hot Cells

11 Last Cosmics Run: ECAL (2)‏ Comparison DAQ/Trigger Problems are seen only in the ½ crates with the missing boards: everything else is fine

12 Problems with EHCAL FEB 6 boards (5 ECAL + 1 HCAL) showed problems for the trigger, 4 problems were related to the M24 serializer known to have problems. We think the boards developed this problem when changes where made to the CROC configuration sequence: during ~1 day random values, varying at high frequency. 4 of the boards have been repaired and changed This may happen again... (boards will be permanently repaired beginning 2009)‏

13 Masking Channels Hot channels (or bad boards) may appear, and have to be masked. Several levels:  Mask in L0DU: mask all calorimeter  Mask in Selection Board: mask one HCAL board or one ½ ECAL crate - > has to be propagated offline  Mask in TVB: mask one full ECAL board -> has to be propagated offline  Mask in Trigger PGA of FEB: mask one cell, but if it is a neighbour cell, this must be done in different boards -> has to be propagated offline  Set Calibration constant in FE PGA to 0: one place and info is contained in CALO banks  Set PM HV to 0 ? What is the best solution ? Should we define now recipes for cosmics masking known hot cells ?

14 Trigger with SPD/PRS SPD multiplicity trigger has been tested with RAM patterns, with simple algorithm in L0DU: trigger part is working correctly, has to be time aligned with the other triggers. PRS information arrives much later than expected with respect to ECAL information (see Eric's talk): we need to delay a lot ECAL in the trigger path, and then increase the computation time of the L0Calo path (which is limited !)‏ Understanding is needed: this problem affects the TVB firmware which may to be changed, but also time alignment constraints from all other detectors have to be taken into account. But we need to complete detailed tests before knowing exactly the situation.

15 Conclusions (trigger oriented)‏ HCAL trigger alone is well tested and debugged: with last corrections, it works as expected (SumEt and EtHadron): it is the L0 trigger which will mainly be used for the first beams. ECAL addition to HCAL is under test (but will probably not be used at the beginning)‏ ECAL alone works also correctly:  Need to test validation by PRS to be in the realistic conditions

16 Plans Additional cosmics runs would be useful to check:  Precise time alignment, with timings corrections,  ECAL+HCAL addition in trigger path,  Trigger with SPD and PRS,  Time-alignment with Muon detector,... In parallel, it would be useful to prepare for beam particles conditions:  HV settings, calibration constants,  Noise trigger rates as a function of threshold,  Calibration + real triggers at the same time (we should see only one trigger, we seem to see several ones)‏