P. Muraca v0.4 Data Comm DCL Trials end to end system test.

Slides:



Advertisements
Similar presentations
© 2010 The MITRE Corporation. All rights reserved. AERONAUTICAL COMMUNICATIONS PANEL (ACP) THIRTEENTH MEETING OF THE WORKING GROUP I Bangkok, Thailand.
Advertisements

ACARS & VDL Mode AVICOM Japan
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
Rob Mead PETAL-II Trials Manager Eurocontrol, DIS/ATD
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
24/25 September 2002ATN2002 (London)1 Delivering CNS/ATM Services to the Aircraft Presented by Forrest Colliver A discussion of the FANS/ATN accommodation.
AOC/FOC Interface for Data Comm Production System
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
ATN/VDL Mode 2 Implementation Status
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
Federal Aviation Administration Data Communications Implementation Team (DCIT) Trials Activities/DTAP Update Schedule Timelines Matt Maki.
Federal Aviation Administration Data Communications Program Data Comm Trials and Production Requirements: High Level Impact Presented To: DCIT #23 Plenary.
ATN Subnetwork Implementation:
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.
Harris.com Michael Earl Systems Engineering, Trials and OPR Trials Status and OPR Update.
Data Link Communications
Data Communications Implementation Team (DCIT)
Document Tracking and the Related Process Andria Roney Rob Mead Andy Fry Andrew Onken.
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig & Pete Muraca.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
DCIT / Media Management Session FAA DataComm – OTA FANS Validation Airbus FANS comm media management 17 Nov 2011Airbus FANS comm media management Presented.
EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup.
Federal Aviation Administration Test Planning for AOC/FOC Interface for Data Comm Production System To: DCIT 29 From: Data Comm Production Sub-Team Date:
EWR DCL Trial Update Capt Gregg Kastman MD-11 Flt Trng Sup.
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #27 Plenary From: Matt Maki / DCL Trials Lead.
GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.
| 1 harris.com Matt Maki DCL Trials Lead DCL Trials Decommissioning Plan 29 Sep 2015.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 08/22/12.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 2/1/13.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status Updates To:DCIT21 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #9 Meeting 09/21/2011 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #22 Plenary 03/14/2013 To: DCIT By: Gregg Anderson.
P. Muraca v0.2 Data Comm DCL Trials end to end system test.
10 Dec 15 COMMUNICATIONS PANEL (CP) WORKING GROUP I (WG-I) Montreal, QC Canada January 2016 AEEC IPS Update (Prepared by Luc Emberger, Greg Saccone)
Federal Aviation Administration Test Planning for AOC/FOC Interface for Data Comm Production System To: DCIT 26 From: Data Comm Production Sub-Team Date:
WORKING GROUP I (WG-I) AEEC IPS Update
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
International Civil Aviation Organization
EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup
Presented by Thales Avionics ATN 2003 London, UK September 2003
The Air Ground Datalink Server (AGDS)
ATN/VDL Mode 2 Implementation Status
Data Communications Program
Data Communications Implementation Team (DCIT)
HP Printer Tech Support Phone Number
Brother Support Helpline Number
Canon Printer Support.
Hp Printer Support Phone Number
Canon Printer Support Helpline Number
ATN Subnetwork Implementation:
FAA Data Communications Program System Engineering
HP Printer Phone Number • The lines are open 24/7 and executives are always there to help you and solve your problems. HP printer customer service number to get the best solution to the issue. For more information please visit on
HP Printer Support Phone Number Dial HP is one of the most reliable brand names, which is known for offering some of the best electronic products, including photocopier, scanner, camcorders and printers. The lines are open 24/7 and execut
We are independent provider of technical support services. All the trademarks, names and logos on this site are the properties of their respective owners and are shown for reference purposes only. We disclaims any association or ownership of such third pa
We are provide best Services in Hp Printer Tech Support in USA with our best technical Support Provider toll free – call for getting best support in HP Printer with best price. Hp Printer Toll free number
Presentation transcript:

P. Muraca v0.4 Data Comm DCL Trials end to end system test

HADDS HID HOST ERAM HADDS HID HOST ERAM NESG ED-8 ACY Airline HOST DEMARC TEST ED-8 ACY FNTB DEMARC FTI OPS IP HADDS HID HOST ERAM DTAP MOUSE KYBRD MONITOR OS FDP DCL AFN HMI FANS 1/A+ STACK ,3 ARINC SITA IP TEST TOWER TDLS DCL Trials Architecture Airline HOST ARTCC 2 3 2,3 HADDS CSP & API DATA RECORD DEMARC

HADDS HID HOST ERAM NESG ED-8 ACY Airline HOST DEMARC DTAP MOUSE KYBRD MONITOR FDP DCL AFN HMI FANS 1/A+ STACK ARINC SITA Tech Center Trials Lab System Test - DCL TRIALS ARCHITECTURE Airline HOST HADDS CSP & API DATA RECORD DEMARC PC-RCU HADDS AVIONICS TDLS legacy gui Sim, playback Fans 1/A+ FNTB Subnetworks Airlines Rs 429 Tech Center Project Aircraft – N47 Strip Printer do258a do258a IP do258a IP do258a IP

Lab and Field Test Phases 1.Test Phase 1 2.Test Phase 2 3.Test Phase 3 4.Test Phase 4 5.Test Phase 5

HADDS HID HOST ERAM NESG ED-8 ACY DEMARC DTAP MOUSE KYBRD MONITOR FDP DCL AFN HMI FANS 1/A+ STACK ARINC SITA Tech Center Trials Lab Test Phase 1 – Lab Environment HADDS CSP & API DATA RECORD DEMARC PC-RCU HADDS AVIONICS Toolset TDLS legacy gui Sim, playback Fans 1/A+ FNTB Subnetworks Rs 429 Tech Center (N47) ACARS / Satcom ACY Tech Center (N47) ACARS / Satcom ACY Tech Center Project Aircraft – N47 Strip Printer do258a IP do258a IP do258a IP GROUND Toolset Fans 1/A+