CENTRAL FLORIDA EXPRESSWAY AUTHORITY FY 2016-2020 Five Year Work Plan December 10, 2015 Presented by: Jeanette Maldonado-Ambler, PE Atkins.

Slides:



Advertisements
Similar presentations
I-4 Ultimate with Lanes Project Central Florida 1 May 21, 2013.
Advertisements

Community Soccer Fields Parks and Recreation Division December 3, 2013.
Titusville to Edgewater Bike Loop PD&E Study
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
The Design-Build Experience. I-95 Honda Interchange $ 8 million Wateree River $ 8 million Reedy & Enoree Bridge $ 3 million SC 170 Widening $100 million.
DISTRICT 7 CONSTRUCTION PROGRAM Frederick Carroll Howard.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer.
Transportation Infrastructure Preliminary Assessment March 10, 2015.
Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working.
Economic Stimulus Information Meeting March 17, 2009 Florida Department of Transportation Florida’s Turnpike Enterprise.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.
NTTA Expansion Program ASCE January Luncheon Meeting Delivering Mobility Gerry Carrigan Assistant Executive Director of Project Delivery North Texas Tollway.
Florida Department of Transportation District One Interstate Planning for I-4 and I-75 October 30, 2012.
Lockheed Martin TLS Visitor Maps & Directions Orlando, FL
Louisiana Community & Technical College System April 2013 Jan Jackson, Sr. Vice President for Finance & Administration PROGRESS of ACT 391 Construction.
River to Sea TPO May 28, 2014 River to Sea TPO May 28, “I-4 BEYOND the ULTIMATE” PD&E REEVALUATION STUDY From west of US 27 to west of Kirkman Road.
ROADWAY LIGHTING PROGRAM Public Works Department February 10, 2015.
1 PRIORITIES: Opportunities & Potential Alignment of Agendas Fantasy of Flight | Polk County | September 15, 2008 Priorities: Central Florida | Polk County.
FLORIDA DEPARTMENT OF TRANSPORTATION
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
ACEC Joint Conference on Regional and National Economy Trends & Opportunities June 14, 2012 William C. Cuttler, P.E. Assistant District Administrator -
Indiana’s Major Moves Projects Asphalt Pavement Association of Indiana Michael B. Cline, P.E., PTOE Commissioner INDOT December 13, 2012.
PUBLIC WORKS DEPARTMENT FY Budget Worksession July 22, 2009.
State of the Agency Mike Snyder, P.E., Executive Director.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
MetroPlan Orlando Board Meeting Agenda Briefing Board of County Commissioners January 8, 2013.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
Texas Transportation Commission October 25, 2012.
MetroPlan Orlando Board Meeting Agenda Briefing Board of County Commissioners March 10, 2015.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
Parks and Recreation Division December 15, 2009 PARK LAND ACQUISITION.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
OOCEA Briefing to the Transportation Committee October 17, 2005.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Transportation Improvement Program Fiscal Year Transportation Improvement Program Fiscal Year Summary of Document and Projects Advisory.
Community Development Department JOINT PARTICIPATION AGREEMENT WITH THE FLORIDA DEPARTMENT OF TRANSPORTATION For LANDSCAPE AND IRRIGATION IMPROVEMENTS.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall John Mitnik, P.E. Engineering & Construction Bureau Chief John Mitnik, P.E. Engineering.
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
1 Mid-Bay Bridge Authority System Primary Asset is a 3.6 mile segmental bridge that spans from Destin, Florida to Niceville, Florida.
Program Manager Administrator
FDOT Annual ITS Working Group Meeting ITS Updates.
MED SR 18 Corridor Project MED PID October 13, 2015.
Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.
Orlando-Orange County Expressway Authority Update L.A. Griffin Manager of Expressway Operations March 20, 2008.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
Orange County Public Works Board of County Commissioners Presentation June 21, 2011 Board of County Commissioners Presentation June 21, 2011 Landscaping.
Interstate 15 North 8/17/2015 Update
VDOT’s Operations Program Opportunities May 20, 2016
Interstate 15 North 4/09/2015 Update
Kerr Tar Project Update – June 2016
DISTRICT 1 ADVERTISED PROJECTS
Florida Transportation Commission FY 2009
Dallas DISTRICT CURRENT/FUTURE CONSTRUCTION PROJECTS FISCAL Years
FY 2011 – FY 2015 Transportation Improvement Program (TIP)
Highway 169 Bridge Replacement & Pavement Resurfacing
Upcoming Major Projects Nevada Transportation Conference April 9, 2013
Trail Projects. Trail Projects US 1 (SR 5) From Kennedy Parkway to Dale Avenue FM No.: Work Mix: Bike Path / Trail Phase: Design / Construction.
FLORIDA DEPARTMENT OF TRANSPORTATION
September 25, 2018 District 5 SUN Trail Update
Pavement Performance Measures In Georgia
I-295/Malcolm X Avenue Interchange Improvement Project
US 1 Project “A” FM No.: Work Mix: Intersection Improvement At: Park Ave. Phase: Design Year Funded: 2020 Cost: $200,000.
Heart of Florida Loop East Section
Commissioners Presentation
Space Coast TPO State Road (S.R.) 528 Update
Presentation transcript:

CENTRAL FLORIDA EXPRESSWAY AUTHORITY FY Five Year Work Plan December 10, 2015 Presented by: Jeanette Maldonado-Ambler, PE Atkins

CENTRAL FLORIDA EXPRESSWAY AUTHORITY

FY WORK PLAN TOTALS Project Cost Summary ($000’s) Fiscal Year Category Totals 2015/ / / / /19 Existing System Improvements 28,7776,897 63,05718,867 3, ,816 System Expansion Projects 190, ,02460,380 1, ,688 Interchange Projects 39,808 81,060 63,793 87,509 76, ,230 Toll Facilities Projects41,430 1,639 12,687 23,905 16,117 95,778 ITS Projects 4, ,078 3,646 2,657 14,863 Signing and Pavement Markings , ,187 Renewal and Replacement Projects 56,441 46,687 50,005 27,568 32, ,805 Landscape Projects 1,000 5,000 SUB TOTALS 363,463137, , , ,7841,262,331 Non-System Projects Third Party Contributions 30, GRAND TOTALS 333,213137, , , ,7841,232,081

CENTRAL FLORIDA EXPRESSWAY AUTHORITY FY WORK PLAN FUNDING DISTRIBUTION

CENTRAL FLORIDA EXPRESSWAY AUTHORITY

MAJOR PROJECTS TO BE ADVERTISED FOR PROFESSIONAL SERVICES SR 408 Resurfacing from West SR 50 to I-4 – anticipated in 2016

CENTRAL FLORIDA EXPRESSWAY AUTHORITY MAJOR PROJECTS TO BE ADVERTISED FOR CONSTRUCTION Wekiva Parkway Sections 2A and 2C – 2C (from Lake County Line to SR 46) in Jan 2016 – 2A (from CR 437 to Mt Plymouth Road) in Feb 2016 SR 417 / SR 528 Ramp Improvements – bid plans SR 528 / Innovation Way Interchange – pre-bid plans SR 408 Widening from Good Homes Road to East of Hiawassee – working towards 90% design plans

CENTRAL FLORIDA EXPRESSWAY AUTHORITY MAJOR PROJECTS TO BE ADVERTISED FOR CONSTRUCTION (continued) SR 408 Widening from SR 417 to Alafaya Trail – early stages of design SR 528 Econ River Bridge – early stages of design SR 429 Resurfacing from Seidel Road to CR 535 – early stages design

CENTRAL FLORIDA EXPRESSWAY AUTHORITY

CENTRAL FLORIDA EXPRESSWAY AUTHORITY

CENTRAL FLORIDA EXPRESSWAY AUTHORITY