Collaboration Mtg April 14, 2000 DO Timeline 2000 2001 J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup 1/2.

Slides:



Advertisements
Similar presentations
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
Advertisements

Status of Eric Kajfasz CPPM/Fermilab GDR-Susy, Lyon - 26 novembre 2001.
All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Commissioning Status & Plans Jae Yu All DØ Meeting Dec. 1, 2000 What have we been doing? What is.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
APS Meeting April 5-8, 2003 at Philadelphia Chunhui Luo 1 Chunhui Luo Inclusive J/ψ Production at DØ.
Workshop on Quarkonium, November 8-10, 2002 at CERN Heriberto Castilla DØ at Run IIa as the new B-Physics/charmonium player Heriberto Castilla Cinvestav-IPN.
Jiawen Zhang, IHEP, 2008, April 10, frascati Status of BEPCII/BESIII and Physics preparation Jiawen Zhang 2008/4/7—10 , PHIPSI08, Frascati.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Collaboration Mtg Cotober 11, 2000 Installation Status Opening Remarks Overview, logistics Recent events, status Outlook, concerns Conclusions Jon Kotcher.
NIU Trigger Workshop CTT Commissioning Trigger Workshop October 22, 1999 WBS & Presented by Fred Borcherding for the D0 Electronics Group.
Dec 7, 1999D0 Dir Review Inst/Com DØ Silicon Hookup and Commissioning p Goals and timeline p Overview of Silicon Read out p “Stand alone” commissioning.
Director’s Review Dec 1999 Tracker Integration and Installation W. E. Cooper 6 December 1999.
A Graphics Sampler for the D  Detector G. Alverson, K. Bos, T. Burnett, F. Canelli, D. Coppage, L. Duflot, Y. Gershtein, N. Graf, S. Hagopian, P. Hamel,
10-25 years of DØ FranceE. Kajfasz1 -France RunII RunIITracking Hard/Soft-ware with.
22 June 2000 D  NIU Workshop S. Doulas From Detector to Ntuples: Muons Steven Doulas Northeastern University Boston, MA D0 Muon Upgrade Group.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
DAQ Software Gordon Watts UW, Seattle December 8, 1999 Director’s Review Introduction to the System Goals for Installation & Commissioning Software Tasks.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
D0 Collab Mtg Feb 7, 2001 D0 Detector: Status for Run 2 Wistful reminiscences Near term: Roll in, detector status, next few weeks Latest from Beams Division.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Fermilab PMG Jan 20, 2000 Reconsideration of the Installation at D0  Overview  Major constraints  Basics of old, new schemes  Some details on each.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
PMG Meeting February 2000 A Split Central Silicon Tracker W. E. Cooper on Behalf of the D0 Silicon Group 3 February 2000.
Luca Spogli Università Roma Tre & INFN Roma Tre
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
PSD upgrade - schedule/resources: electronics and cooling system F. Guber INR, Moscow NA61/SHINE upgrade workshop, CERN 3– 5 March, 2014.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
India in DØ Naba K Mondal Tata Institute, Mumbai.
Detector Decommissioning Related Activities at DØ George Ginther Fermilab and University of Rochester 23 January 2012.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
Aurelio Juste (Fermilab) Rencontres de Moriond, March OUTLINE Tevatron Run 2 The upgraded DØ Detector Status Performance First Physics Results Outlook.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
D. Lincoln Run II MTG May 12, Y2K What will it take to get data out of the CFT?* Don Lincoln CFT Commissioning Czar Fermilab Run II Meeting May 12, Y2K.
Levan BabukhadiaICHEP02 – 31 st International Conference on High Energy Physics, Amsterdam, 24 – 31 July, 2002 CHEP02 – 31 st International Conference.
DoE Review June 6-7, 2000 Installation and Commissioning of the D0 Detector Overview since last review Organization Current status Installation sequence,
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
Director’s Review Dec 1999 DO Timeline Old Version J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
D0 PMG 4/19/01 Completed Reportable Milestones MilestoneBaselineActualVar. H Half-Wedge Fabrication 20% Complete 10/15/99 0 w 3 Chip Ladder Fabrication.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
CLAS12 Commissioning with Cosmincs
Kevin Burkett Harvard University June 12, 2001
CLAS12 First Experiment Workshop Report
Preparation of the CLAS12 First Experiment Status and Time-Line
Tracker Software Status
PHYS 3446 – Lecture #18 Monday ,April 9, 2012 Dr. Brandt Calorimeter
Calorimeter Upgrade The Tevatron and Dzero Upgrades
Plans for the 2004 CSC Beam Test
Presentation transcript:

Collaboration Mtg April 14, 2000 DO Timeline J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup 1/2 VLPCs installed 1st CFT crate operational Waveguide production All VLPCs installed SMT install/ hookup Forward  MDT & pixel planes install/survey (A&B) Forward  MDT & pixel planes install/survey (C) CC cosmics ECN cosmics Assemble/install/ align EMC End toroids installed Hookup ECS Cosmic Ray Commissioning Phase I: Central muon, DAQ, RECO, trigger, silicon front-end Phase II: Fiber tracker, trigger, preshowers, VLPCs, CTT, forward muon Phase III: Full Cosmic Ray Run (add TRIG, SMT, CAL) Install/checkout CAL BLS Run II begins: Mar 1, 2001 Roll in Remove shield wall No LHe No LAr Beam- ready Platform moves Install final CFT electronics

Collaboration Mtg April 14, 2000 D0 Commissioning Timeline Commissioning/Integration Goals J F M A M J J A S O N D J F M D Run II begins: Mar 1, 2001 Roll in No LHe LAr Beam- ready #1 #3 #2 DAQ/online system running in user mode Integration Goal #1: dual muon crates, initial muon triggering/filtering, ship data to farm, run reconstruction, online event display Begin full central muon system, integrate Level 2 muon trigger at DAB test stand Silicon front-end installed/commissioned Forward muon C-layer MDTs/pixels installed/commissioned #6 #5 Forward muon A&B layer MDTs/pixels installed/commissioned Integration Goal #2: Initial triggering on L1 CFT/CPS, begin linking tracks in CFT/CPS/CMuon, begin Level 2 trigger integration Half of CFT, CPS hooked up, checked out #4 #9 #10 #11 Integration Goal #4: Full detector in steady- state Cosmic Ray Commissioning SMT, CAL fully added to commissioning chain, exercise full triggering with all major systems Integration Goal #3: Add Central Calorimeter to commissioning stream, most major systems being commissioned #8 #7

Collaboration Mtg April 14, 2000 Current Detector Configuration December, 1999  South calorimeter on sidewalk  Run 1 Central Tracking removed  End toroids on sidewalk, Run 1 detectors (PDTs) removed  Central iron in open position to allow access  Solenoid, Central Preshower installed in central bore  Shield wall up  Hi-Bay clear for staging, other work in Assembly Hall

Collaboration Mtg April 14, 2000 Current Detector Configuration December, 1999  End irons prepared for mounting A- and B-layer detectors (MDTs, pixels) on faces  Most of Central Muon PDTs, A- , cosmic cap installed  Commissioning Level 1 trigger, muon system, online, silicon front-end, solenoid

Collaboration Mtg April 14, 2000 Current Detector Configuration Phase I  A-layer MDTs, Pixels being mounted, surveyed onto faces of end irons  C-layer truss and shielding has arrived in Hi-Bay, being dressed  Remainder of detector remains open for access

Collaboration Mtg April 14, 2000 Current Detector Configuration  Commissioning continues, using Central Muon as prototype system: u Multi-crate readout of full central muon system u Event monitoring, crate control, steady DAQ running, filtering u Exercise reconstruction, online event display (on cosmic ray muons)

Collaboration Mtg April 14, 2000 Forward Muon B-Layer Installation May-June, 2000  A-layer planes installed  B-layer MDTs, Pixels being mounted, surveyed onto faces of end irons  C-layer trusses and shielding continue to be dressed in Hi-Bay

Collaboration Mtg April 14, 2000 Forward Muon B-Layer Installation May-June, 2000  End irons moved toward center of Assembly Pit to allow access for B-layer installation/surveying  Commissioning continues

Collaboration Mtg April 14, 2000 Install Fiber Tracker in Solenoid June, 2000  Fiber Tracker being installed in central bore  A- and B-layer detectors installed on end irons  B-layers Pixels open to allow access for hookup/commissioning  Commission Fiber Tracker (and Silicon) as they arrive

Collaboration Mtg April 14, 2000 Install Fiber Tracker in Solenoid May, 2000  Fiber Tracker + Cart/I-Beam system lowered into gap between South End Calorimeter and Central Calorimeter  Rolled into solenoid bore along I-Beam Fiber Tracker Cart System

Collaboration Mtg April 14, 2000 Move Platform West, Pick Up End Irons November 3-15, 2000  Silicon and Fiber Tracker both installed  South End Calorimeter back in place on platform  Platform moves west to pick up two end irons, now loaded with A- and B-layer detectors  C-layer MDTs and Pixels installed and surveyed onto trusses in Hi-Bay, ready to move down to sidewalk

Collaboration Mtg April 14, 2000 Move Platform West, Pick Up End Irons November 3-15, 2000  Detector buttoned up during move: central iron, calorimeters closed  A- and B-layer detector planes shut  No commissioning during this period (detector disconnected from services)  Movable Counting House moves with detector during pick up

Collaboration Mtg April 14, 2000 Platform Returns to East Position Beginning Phase II  Detector returns to east position with end irons installed  Central irons, calorimeters in open position  Ready for trusses to be brought down to sidewalk  Commissioning resumes: u gradual integration of all detectors for Cosmic Ray Commissioning: Silicon, Fiber Tracker, Calorimeters, Central and Forward Muons, Trigger

Collaboration Mtg April 14, 2000 North EMC Truss Moves to North Sidewalk November 20-28, 1999  North C-layer truss, with MDTs and Pixels mounted, moves to north sidewalk  End irons, calorimeters closed to allow clearance to shield wall  Central irons open  EMCs, shielding re-assembled on sidewalk to prepare for rolling in

Collaboration Mtg April 14, 2000 EMCs Installed in Collision Hall December 11, January 11, 2001  Shield wall is broken down, moved to now free space in Hi-Bay  North and South C-layer trusses/shields, having been assembled on sidewalk, rolled into Collision Hall - surveyed into place  Detector will be rolled into place to meet trusses

Collaboration Mtg April 14, 2000 EMCs Installed in Collision Hall  Full Cosmic Ray Commissioning of all systems continues during most of this period  End irons, calorimeters can be opened for access

Collaboration Mtg April 14, 2000 Detector Rolled in and Hooked Up February 6, 2001  Full detector rolled in to final closed position: hooked up, ready for beam  Shield wall back up  Movable Counting House travels with detector, cable bridge down  Commissioning with cosmic rays will continue until beam is delivered (March 1, 2001)

Collaboration Mtg April 14, 2000 Access to Detector in Collision Hall Closed Position - Data-TakingOpen Position - Detector Access Shielding retracted South calorimeter open North B-layer pixels open South end iron open North end iron closed

Collaboration Mtg April 14, 2000 Detector Rolled In, Hooked Up Phase III  Detector installed in compact space  Access to internal tracking detectors, end muon detector planes must be carefully coordinated

Collaboration Mtg April 14, 2000 South EMC Truss Moves to South Sidewalk November 29- December 5, 1999  South C-layer truss moves to south sidewalk  EMCs, shielding re-assembled on sidewalk to prepare for rolling in

Collaboration Mtg April 14, 2000 South EMC Truss Moves to South Sidewalk November 29- December 5, 1999  South C-layer truss moves to south sidewalk in two pieces, reassembled  Preparing to take down shield wall for roll in

Collaboration Mtg April 14, 2000 The DØ Upgrade Tracking System Charged Particle Momentum Resolution  p T /p T ~ p T = 10 GeV/c

Collaboration Mtg April 14, 2000 Management of D0 detector upgrade for Run II Project Managers (PM) P.M.Tuts, H.Weerts Run II Detector Board (R2DB) PM, APM, spokespersons Project Engineers R.Hance, K.Krempetz Project Office W.Freeman, S.Landrud Calorimeter P.M.Tuts Electronics P.M.Tuts ICD A.White Solenoid H.E.Fisk BD Service Mods. H.E.Fisk J.Theilacker BD Mods. A.Stefanik Refrigeration R.Rucinski Cryo & Power R.Hance K.Krempetz SC solenoid H.E.Fisk Online S.Fuess P.Slattery Control Monitoring F.Bartlett Equipment S.Fuess Level 1&2 P.Laurens DAQ Monitor T.Yasuda Level 3 G.Watts Event Monitor J.Yu BD interface M.Begel Data Logging S.Snyder Calibration I.Bertram Run Control S.Snyder Trigger G.Blazey Level 1 G.Blazey P.Grannis Level 2 J.Linnemann Level 0 R.Partridge Framework M.Abolins Level 3 D.Cutts Muon D.Denisov T.Diehl Central muon T.Diehl Forward muon D.Denisov Electronics B.Baldin APM Tracking H.Montgomery Silicon M.Demarteau R.Lipton (W.Reay) Fiber tracker A.Bross M.Wayne Central Preshower J.Qian Forward Preshower J.Kotcher Tracking Electronics M.Johnson APM Installation & Commissioning J.Kotcher Installation R.Hance K.Krempetz Tracking Integration & Installation W.Cooper Commissioning TBA

Collaboration Mtg April 14, 2000