19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 1 AD and AD experimental areas: equipment tests and startup with beam Tommy.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Pelletron Battle – Field Report All Experimenters’ Meeting August 15, 2011 L. Prost (for A. Shemyakin)
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Improved beam line for Hall A layouts, present and proposed optics in altered region benefits of proposed layout costs of proposed layout conclusions.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
AD status in 2012, foreseen consolidations at AD ADUC 20/11/2012T. Eriksson CERN BE/OP.
Federal Aviation Administration TCA WEB PAGE CHANGES FOR 2014.
Short Range Correlation in 4 He E07 – 006 Update report presented to the Hall A User group meeting the Hall A User group meeting Igor Korover Tel Aviv.
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
SPS re-commissioning with beam K. Cornelis PS-SPS days.
Status of the AD ADUC 13/6/2012T. Eriksson CERN BE/OP.
ATC / ABOC Days 23 Jan LHC injector Chain, E.A., Facilities. MTTR, spare parts and stand-by policy for BI equipments J.Tan AB/BI on behalf of BI.
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Status and Prospects for the AD and ELENA
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
AD start-up 2014 A rough and brief summary MSWG 16/01/2015T.Eriksson BE/OP1.
Perspectives for polarized antiprotons Paolo Lenisa Università di Ferrara and INFN - Italy Perspectives for Polarized Antiprotons MENU 2013 – Rome, September.
ATC/ABOC 2007T. Eriksson CERN AB/OP AD Machine and Experimental Areas – Operation and major problems in 2006, outlook for 2007.
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Villars, 26 September Extra Low Energy Antiproton Ring (ELENA) for antiproton deceleration after the AD Pavel Belochitskii for the AD team On behalf.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
Status Report Beam Working Group 31 January 2007 Presented by L.Gatignon  Revised beam design  Requests to AB department for 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
Slide 1 Overview Introduction Stochastic Cooling History of the Antiproton machines at CERN The AD and ELENA Conclusion.
ELENA installation progress F. Butin / ELENA collaboration.
Steering committee ELENA Project Structure S. Maury, project leader C. Carli, deputy project leader Beam physics and Performance Committee (G. Tranquille,
Status of HESR 18th March Gießen Dieter Prasuhn.
ELENA installation and commissioning status
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
AD consolidation activities in LS2
Installations, modifications, consolidation in 2005:
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Renovation of the 45-year old PS magnets
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
ELENA Extra Low ENergy Antiproton Ring
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
ELENA beam commissioning
Electron Cooling in ELENA - observations and plans
Plans for future electron cooling needs PS BD/AC
Presentation transcript:

19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 1 AD and AD experimental areas: equipment tests and startup with beam Tommy Eriksson AB/OP/AD

19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 2 AD and AD experimental areas: equipment tests and startup with beam 1.Planning 2.Equipment tests 3.HW status 4.News for the 2006 run 5.Beam requirements 6.ccc 7.Conclusion

19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide Run planning Short run with only 3 months of physics. AD run extended to cover weekends hours total (2040 physics) are scheduled, to be compared with 3400 in OP/AD-LEIR section will cover either AD or LEIR operation, including LEIR commissioning. AD: ops crew = 5 specialists on-call Mon 07:00 – Mon 07:00 24h/24. Shiftwork on AD during startups and md:s.

19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 4 Shutdown work/startup planning

19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 5 Equipment tests Key dates: –24/4: search + closure of AD ring and Target Area AD Hall remains in free access unless major problems Target area in controlled access (special access procedure) Controlled access to AD ring if needed –24/4 – 14/5: HW tests + cold checkout –15/5: startup w. production beam –No critical days

19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 6 HW status: e-cooler

19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 7 HW status: e-cooler

19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 8 Electron cooler/Vacuum: Replacement of / add missing NEG:s Repair of orbit pickups Replacement of cathode Alignment Improvement of orbit correctors 2904/2917: Study completed, but no budget to go further

19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 9 Electron cooler/Vacuum Install non-magnetic support for VVS3105 Install vacuum chamber in place of K35 Repair of BIPM sect 42 Isolate 8000-line Modify VVS in ej. line

19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 10 News for 2006 ACE (AD-4) has requested 500 MeV/c pbars for cell irradiation. Approval by SPSC in Jan. 06 ?? This implies significant changes to the AD cycle: –Tests of SW during eq.tests –Use of some of the planned md-periods during the year for further tests –Final setting-up followed by physics to be done at end of 2006 run to avoid disturbing the other users; 160 hours in total requested (setup + physics). If unexpected problems, ACE can go back to 300 MeV/c operation on short notice

19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 11 News for 2006

19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 12 News for 2006 Tests of ATRAP:s new 3T solenoid in 2004 revealed that no beam can be transferred to ATHENA due to the stray field A new H dipole will be installed to compensate (DE0.DHZ87) Tests during startup

19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 13 Beam requirements 26 GeV/c beam needed as from 15/5 No use of 3.57 GeV/c protons is planned, BUT: –In case of serious problems, we might have to resort to proton operation with AD in reverse polarity; 3.5 GeV/c tst beam should be available on fairly short notice

19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 14 Operation from ccc Start-ups and md:s will continue to be carried out from the ACR As far as tools/diagnostics, no major problems can expected for ccc operation; CCC=MCR as seen from the AD The required AD modifications for efficient operation from the ccc were: –Improve stability with improved steering dipoles for pbar/e-beam alignment –Replace MWPC:s by non-destructive BPM:s in the ejection lines None of the requested modifications were carried out – many trips to/from ACR, more downtime and delays can be expected

19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 15 Conclusion Main worries for the 2006 startup: –18 months stop –Electron cooler behaviour after complete dismantling –No adaptation for ccc-operation