__________________________________ Marjana Sijanec Zavrl Building and Civil Engineering Institute ZRMK COST C23 COST C23, WG1 meeting Porto, January 12-13,

Slides:



Advertisements
Similar presentations
University of Minho School of Engineering Territory, Environment and Construction Centre (C-TAC) Uma Escola a Reinventar o Futuro – Semana da Escola de.
Advertisements

Produced by Empa IEA ECBCS Annex 50 Prefab Retrofit of Buildings Folie 1 Prefabricated Systems for Low Energy / High Comfort Building Renewal Project Presentation.
Passive house. Definition A Passive house is a buildings with good comfort conditions during winter and summer, without traditional space heating systems.
Low Cost, High Innovation Efficiency in the Built Environment Brandon Fletcher, CFA Co-Founder Green Analytics.
eQuest Quick Energy Simulation Tool
Sustainable Construction
A Comparison of Measure Avoided Cost Calculations using Utility TOU Load Shapes and DEER Hourly Measure Savings 14 March 2006.
By: R.M. Chitranshi. ECBC With the background of high energy saving potential and its benefits bridging the gap between demand and supply, reducing environmental.
Pathway to Net-Zero Energy Commercial Buildings Gregory B. Stark, P.E. National Renewable Energy Laboratory UNL Net-Zero Energy Workshop.
Timber Research Centre Michael Anderson– Mohamed Farid Pablo Prallong – Lewis Macleod Ross Turbet & Group A 26/04/20054 th Presentation.
Summary of Heat Loss Calculations Assessing overall heating requirements for building (E) Component U-ValueAreaHeat Loss Rate (W o C -1 ) Walls U walls.
Overview of Property Assessed Clean Energy (PACE) Program San Antonio Office of Environmental Policy December 16, 2009.
Standardization in the Green Buildings field Overall energy performance of buildings Dick (H.A.L.) van Dijk, Senior Scientist at Netherlands Organisation.
APPROACH TO ENERGY CONSCIOUS RETROFIT OF SLOVENIAN BUILDING STOCK Marjana ŠIJANEC ZAVRL ZRMK, Technological Building and Civil Engineering Institute, Ljubljana,
Aalto PRO Aalto University Continuing Education Värikoodi tähän päälle Ana Rodriguez-Gabriel, ENEF ENEF project: objectives, partners, milestones.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
AWARD FOR THE BEST ENERGY EFFECTIVE PROJECT 2008 in Slovenia Optimal use of renewable energy sources for heating and cooling of our office building Optimal.
Too Expensive ! Too much pollution ! Investments proposals in order to reduce our energy consumption.
Launch of Sustainable Energy Ireland Awards 2007 Musgrave Group Head Office Construction Project Winner: Best Renewable Energy Project 2006 Heritage Hotel,
Energy Conserving Alternatives HVAC 15a CNST 305 Environmental Systems 1 Dr. Berryman.
Presentation SOLANOVA, January 2003 Department of Building Energetics and Service Systems Department of Energetics and Energy Systems Budapest University.
NAS - Enerbuild Research-Energy-Environment. Main fields of the partners Energy conscious retrofit of existing buildings, Energy efficient new buildings,
Low Carbon Action Group results. The nature of our business means a large amount of energy needs to be used, but we are looking to compensate that with.
Introduction to Integrated Design of Low-Energy Buildings Professor Svend Svendsen Department of Civil Engineering Technical University of Denmark
CAPABILITY OF INCREASING ENERGY EFFICIENCY IN EU HOUSING Nataliya Anisimova Czech Technical University in Prague
Towards Net Zero Energy Buildings: Dynamic Simulation of office Building in Three Climate Zones of Europe Nusrat Jung 1,2, Jari Shemeikka 1, Risto Lahdelma.
EIE EffCoBuild WP3 Energy saving potentials in building sector and virtual “power saving plant” Slovenia Survey on energy consumption in community Jesenice.
PECULIARITIES ON VILNIUS MULTISTORIED HOUSING REFURBISHMENT FROM THE ENERGY EFFICIENCY ASPECT Prof. S.Raslanas, A.Gulbinas, L. Tupenaite Vilnius Gediminas.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
Passive House Seminar for Professionals from the Building Sector
Bottom-up Measurement and Verification of Energy Efficiency Improvements: National & Regional Examples Monitoring of Energy Audits in Finland Bottom-up.
Energy Efficiency – The hidden resource that gives new life to old buildings Hans Nilsson FourFact AB eceee IEA DSM-Programme 1.
New Mexico State University EFFICIENT RESIDENTIAL ENERYGY Fahzy Cooperative Extension Service ______ County.
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
Albert Young – University of Glasgow Allan Crooks – Carbon Trust Case Studies.
Energy efficiency in buildings Monga Mehlwana Tuesday, 05 October 2010.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
NOVO ETS IMPROVING YOUR ORGANIZATIONS’ ENVIRONMENTAL, HEALTH AND SAFETY PERFORMANCE ENERGY MANAGEMENT IN THE CONTEXT OF GREEN PRODUCTIVITY.
BUILD UP Skills Slovenia IEE Skills4SB.SI - Building Skills for Sustainable Building in Slovenia Slides created on:Nov. 15, 2013 Contract N°: IEE/11/BWI/519/SI ,
Riga Technical University Institute of Heat, Gas and Water technology OFFICE BUILDING NIGHT COOLING POTENTIAL IN BALTIC REGION RENARS MILLERS, ALEKSANDRS.
Energy conservation strategies Buildings energy consumption depends on building envelop, efficiency of HVAC and lighting systems, amount of required fresh.
Feasibility Study as a Basis for Investment Financing Arto Nuorkivi ESCOBALT Project Manager, Finland Kaunas, Dec. 14, 2005.
Group 4B: Bergold, Kajander, Leppä, Niemeläinen, Pesonen.
Energy Consumption Calculations Group 4a. Contents 1.Introduction 2.Methods 3.Tools 4.Country specific variations a.Finland b.Other Nordic countries c.Italy.
1 Case study: Sofia District Heating Dr. Venkata R. Putti Team Leader, Carbon Finance Assist The World Bank Minsk / Belarus, March 2007.
16469 Low Energy Building Design Conflict and Interaction in Environmental Engineering Design.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Development of a new Building Energy Model in TEB Bruno Bueno Supervisor: Grégoire Pigeon.
 Welcome & introduction  Health & safety  Mobile ‘phones  Agenda.
PECO Smart Ideas for Your Business Greater Philadelphia Association of Energy Engineers Mike O’Leary, PECO April 20, 2016.
CROATIAN EXPERIENCE IN OPERATING AN ENERGY EFFICIENCY FUND under the regime of the EED Article 7 Vesna Bukarica, Ph.D. Head of Energy Efficiency Sector.
Lighting facts.  Lighting can be a big energy consumer in offices and production areas and experience shows that energy savings may be achieved - often.
Sustainable Architecture in Korea The Present Situation and Policy ACGSA REPORT 31 October, 2012 Korea Institute of Registered Architects (KIRA)
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
© INTECHNICA Energy efficiency assessment Systematic Approach to Green Production Energy Efficiency Assessment Supported by: The sole responsibility.
Dušan Petráš ENERGY AUDITING AND CERTIFICATION OF BUILDINGS IN SLOVAK REPUBLIC Slovak University of Technology in Bratislava, Faculty of Civil Engineering,
Assistant Professor Antti Peltokorpi
OPTIMUM DESIGN OF A HOUSE AND ITS HVAC SYSTEMS USING SIMULATION
Announcement: The Course Test is Net week ! On Wednesday, October 12 It starts at 1 pm sharp.
NeZeR Design Competition Sweden Maria Ahlm, IVL Swedish Environmental Research Institute Sara Magnusson, student, winner of 1st price Alexander Skogfeldt,
Fort Stanwix National Monument Energy Audit Contract
Building Environmental Systems
Specifics of multi-apartment building deep complex retrofitting
EPC CONCEPTS and BUSINESS CASES
CESB 2016 Praha Wednesday, by Marek Petrik VELUX Austria
Lecture Objectives: Discuss Final Project
MEASUREMENT OF ATTIC TEMPERATURE IN RESIDENTIAL BUILDING
BEEP Integrated Design Process for Energy Efficient Buildings
Assessment of the Energy Savings Potential of Daylight Utilization and its Impact on a Building Energy Performance Hermano Bernardo Vienna, 2010.
Jerzy KWIATKOWSKI, Jerzy SOWA, Andrzej WISZNIEWSKI
Presentation transcript:

__________________________________ Marjana Sijanec Zavrl Building and Civil Engineering Institute ZRMK COST C23 COST C23, WG1 meeting Porto, January 12-13, 2006 WG1 case study 1 - Slovenia LCC & Integrated Planning Approach in Design Process of Mercator Retail Trade Shop Refurbishment

slide 2 Scope of the case study In traditional practice the reburbishment scenario is based mostly on investment costs Running costs, maintenance, repair and other life cycle costs are neglected Investor should be informed (in figures) about LCC costs before decision making at the design stage 1 - The scope of the case study is to show the benefits of planning the building refurbishment based on LCC (Life Cycle Costs) assessment    Life cycle costs of building - NPV

slide 3 Scope of the case study 2 - The scope was also to motivate the building owners (once they are aware of the most economical refurbishment scenario) to do integrated planning of refurbishment Integrated planning (IP) of refurbishment means that also a whole list of building quality aspects that can not be directly evaluated in money was taken into account, like thermal comfort, reduction of CO 2 emissions The case study is about the process – how to approach to planning of refurbishment To illustrate LCC & IP in planning of refurbishment in practice the approach was used at refurbishment of Mercator retail trade shop: Aim - to propose cost effective and environmentally friendly energy restoration scenario

slide 4 Partner Institution short description of the partner institution, e.g. Poslovni sistem Mercator d. d. / Mercator j.s.c. The biggest alimentary retail trade company in Slovenia (with 41% of market share in Slovenia) Mercator owns mainly commercial buildings: alimentary shopping centres (22 in 5 years in Slovenia and abroad), office building, M-hotel + conference centre, 1000 alimentary shops (5-40 years old, m2), 20 – 30 refurbished yearly 138 franchising shops ! – (smaller buildings all over Slovenia) The company owns their commercial buildings Company vision: energy efficient buildings, quality of indoor environment, care for the environment, CO 2 emissions reduction, business cost reduction

slide 5 1. Activities Medium size shop “Mercator na Gmajni” Preliminary discussions, agreement  (Feb. - Apr. 2004) Introductory meeting with Mercator project team  Jul  (final selection of building) Data collection  from Aug  (existing situation, refurbishment plans, energy consumption)

slide 6 1. Before General data  610 m 2  Shop, storage rooms  Built in 60-ties, in Ljubljana (3300 DD) Core Mercator project team  Department for investments  Mercator Optima architects  Head clerk

slide 7 1. Before Building envelope…  Sept Concerte frame structure Walls –  Brick U wall =1,2 W/m 2 K… Windows –  Double glazing U win = 2.4 W/m 2 K  Shop-window single gl. U win = 5.0 W/m 2 K

slide 8 Inventory of HVAC devices Refrigeration technology ! Electrical lighting  Sept Before ! Not in the hands of investment dept., but a task of technology dept. And therefore not involved in the analyses

slide 9 1. Activities Monitoring of temperature and RH… …

slide Activities

slide Tools Idea – to use commercially available tool for LCC in building refurbishment IDA-tool in use for energy calculations… LC-Profit used for LCC analysis (spreadsheet by STATSBYGG, Norway)

slide 12 LCC tools

slide Energy calculations - scenarios Definition of the model Preliminary list of measures  Implementation of energy efficient (EE) glazing / windows  Wall insulation, roof insulation …  Shading – passive cooling  EE refrigeration techniques ** (decision made separately, on the performance and reliability criteria)  Ventilation with recuperation Refurbishment scenarios - selected for energy and LCC-calculation  Scenario 0 (existing situation, no investment, only maintenance and operation costs as usual)  Scenario I (12 cm TI for envelope)  Scenario II (new windows U st =1,1W/m 2 K)  Scenario III (scenario I + scenario II)  Scenario IV (new windows U st =0,9W/m 2 K)  Scenario V (scenario I + scenario IV)  Scenario VI (scenario II + some roof insul.) Additional analyses for support of IP  Scenario VII – summer shading, natural ventilation during night time (better thermal comfort without cooling devices)…

slide 14 Simulation of thermal response & energy flows (IDA ICE tool)

slide 15 Energy use for heating Scenario 0 (existing situation, no investment, only maintenance and operation costs as usual) Scenario I (12 cm TI for envelope) Scenario II (new windows Ust=1,1W/m2K) Scenario III (scenario I + scenario II) Scenario IV (new windows Ust=0,9W/m2K) Scenario V (scenario I + scenario IV) Scenario VI (scenario II + some roof insul.) 0% -18% - 22% -33% -23% -35% -25% ENERGY SAVINGS - HEATING TI envelope 12 cm, windows 0,9 W/m2K

slide 16 Energy use for heating Electricity consumption Yearly use of heat and electricity – comparison of scenarios

slide 17 Refurbishment scenario I - VI OPERATIONAL COSTS PER YEAR Scenario 0 (existing situation, no investment, only maintenance and operation costs as usual) Scenario I (12 cm TI for envelope) Scenario II (new windows Ust=1,1W/m2K) Scenario III (scenario I + scenario II) Scenario IV (new windows Ust=0,9W/m2K) Scenario V (scenario I + scenario IV) Scenario VI (scenario II + some roof insul.) TI envelope 12 cm, windows 0,9 W/m2K

slide 18 LCC analysis – LC-Profit* Norwegian program for NPV of annual costs for:  Management  Operational costs  Maintenance and repair  Investment in building  Investment in HVAC  Investment in electricity Assumptions  Discount rate  Life time of a building Division of costs:  Owner, tenant *STATSBYGG Factors Alternativ ELECTRIC AL HVAC Constructio n Maintenanc e Operation Manageme nt Calculations Assumption s Front page

slide 19 Scenario II (new windows U g = 1,1 W/m2K) Building lifetime – 30, 40, 50, 60 years

slide 20 LCC – NPV for scenarios I - VI Investment costs, management, operating, maintenance costs NPV INVESTMENT + FUTURE COSTS IN SERVICE LIFE OF BUILDING Scenario 0 (existing situation, no investment, only maintenance and operation costs as usual) Scenario I (12 cm TI for envelope) Scenario II (new windows Ust=1,1W/m2K) Scenario III (scenario I + scenario II) Scenario IV (new windows Ust=0,9W/m2K) Scenario V (scenario I + scenario IV) Scenario VI (scenario II + some roof insul.) Windows U= 1,1 W/m 2 K

slide Outcomes The lowest CO 2 emissions alternative  based on energy simulation (Scenario III, V) The cheapest alternative  based on LCC the least cost alternative (Scenario II) Alternative carried out in the refurbishment :  based on LCC&IP - new windows (display window - from single gl. in Al frame to Ug=1.1W/m2K), roof insulation (partly), new refrigeration technique, bigger shop area (coffee bar omitted), renewed electrical lightning (Scenario VI) Refurbishment scenarios - selected for energy and LCC-calculation Scenario 0 (existing situation, no investment, only maintenance and operation costs as usual) Scenario I (12 cm TI for envelope) Scenario II (new windows Ug=1,1W/m2K) Scenario III (scenario I + scenario II) Scenario IV (new windows Ug=0,9W/m2K) Scenario V (scenario I + scenario IV) Scenario VI (new windows Ug=1,1W/m2K, roof insulation partly)

slide 22 Conclusions LCC assessment pointed out scenario II (exchange of windows Ug=1,1 W/m 2 K) to be the option with lowest NPV Scenario II lowest NPV 33 kWh/m 2 year of energy savings, 22% less energy used for heating compared to existing case, estimated heating savings EUR/year reduction of CO 2 emissions kg CO 2 /year Integrated planning showed the importance of better thermal comfort, roof insulation was added and new refrigerators – scenario VI Scenario VI implemented Additional 5% of energy savings and CO 2 emissions Existing situation energy use for heating : electricity use = 1 : 3 PREDSTAVITEV Zemeljski plin je najkakovostnejše fosilno gorivo, saj ob zgorevanju nastajata predvsem vodna para in ogljikov dioksid, drugih škodljivih produktov pa skoraj ni. Preskrba z zemeljskim plinom je zanesljiva, saj ga dobivamo iz dveh različnih območij. Z ene strani k nam priteka iz Rusije in z druge strani iz Alžirije. Vrhnika je nekako na sredini pritoka z obeh strani. Stroški ogrevanja z zemeljskim plinom so nižji, saj je cena vedno konkurenčna napram drugim energentom. Nekaj osnovnih podatkov o zemeljskem plinu: Specifična teža zemeljskega plina je 0,6788 kg/m3 in je precej manjša od specifične teže zraka, ki ima 1,293 kg/m3 v enakih pogojih. To pomeni, da se v zraku hitro dviga in se v zaprtih prostorih zadržuje pod stropom. Zemeljski plin je brez barve in skoraj brez vonja. Zaradi lažjega odkrivanja morebitnega uhajanja mu dodajamo deodorant, ki z značilnim vonjem omogoča hitro zaznavanje prisotnosti zemeljskega plina. Sestava zemeljskega plina: metan 98,2 vol.% etan 0,6 vol.% drugi ogljikovodiki 0,2 vol.% dušik 0,9 vol.% Povprečna energijska vrednost zemeljskega plina je: - spodnja kurilna vrednost 9,473 kWh/Sm3 - zgornja kurilna vrednost 10,5817 kWh/Sm3 Napotke in navodila, kako ukrepati v slučaju uhajanja zemeljskega plina in okvare vašega plinskega trošila, lahko najdete v knjižici Plin pri vas doma.Plin pri vas doma 33 kWh * 610 m2 * 1.9kg/sm3 / 10 za Sm2 = 6,27 kg CO2/m2 * 610 m2 = kg CO2 prihranka na celo stavbo pri scenariu 2

slide 23 BUT - Conclusions 2 Refurbishment was finally not focused on the envelope only, but also on improvement of functionality of the shop:  Increased shopping area  Authomatic door  Significant number of new refrigeratiors  Heat needed for refrigerators does not remain in the shop but it is used for hot water preparation. Therefore actual electricity use after refurbishment in 2005 is slightly higher comparing the existing situation 2003 Refrigerators became an important source of chill in the shop area, additional heating had to be provided. Energy use for heating has therefore increased in spite of transmission heat losses reduction.

slide 24 After, 2005 Implemented measures: Wall- ventilated metal covering, no TI Roof partly insulated (storage area) windows  EE windows double glazed U glazing = 1,1 W/m 2 K Functional changes :  shopping area bigger,  more refrigerators,  recovered heat form refrigerators used for hot water)

slide 25 After, 2005

slide 26 Use of gas and electricity before 2003 and after refurbishment 2005

slide 27 Lessons learnt  Life Cycle Cost analysis is important for building owners in retail trade sector,  Energy savings & CO2 emissions reductions could be higher (scenario III, V)  IP stimulates focusing on other building quality issues  better (thermal, visual…) comfort and quality of the service attract the customers  total energy and electricity costs increased  BUT the turnover was doubled after the refurbishment !  Future view on LCC and IP in refurbishment – well accepted, but necessary to overcome the barriers like: lack of LCC tools, lack of databases, lack of staff, tight schedules for refurbishment…  The core of the case study is rather the use of LCC and IP method in refurbishment process than actually implemented technologies and achieved savings!

slide 28 More information: Mercator Case study is a part of SAVE project LCC-REFURB – “Integrated Planning for Building Refurbishment” , co-financed by EC and Slovenian ministry MOP

slide 29 Hvala za pozornost! E-pošta: