Project Specific Safe Work Plan Team Engagement Starts HERE!

Similar presentations


Presentation on theme: "Project Specific Safe Work Plan Team Engagement Starts HERE!"— Presentation transcript:

1 Project Specific Safe Work Plan Team Engagement Starts HERE!

2  What is It?  Why do you need one?  When do you need one?  How do you develop a Project Specific SWP?  How do you effectively Implement it?  How do you know it is being effective?

3  Scope of Work  Location  Main Elements  References

4  Objective  Scope of Work (Project Overall and Team Member Specifics)  Emergency Procedures  Training Requirements  Hazard Identification and Mitigation  Pro-Active Team Member Engagement  Incident Management  Recognition Plan

5  Company HSE Policy Statement  Overall HSE Vision Statement  Project Specific Objectives  Motto’s, Credo’s, etc.

6  Brief Overall Statement  Specific Activities

7  Main Project Site  Alternative Sites  Construction Site  Vendor Sites  Etc.

8  Basic (All Team Members)  Site Specific  Task Specific  PPE Specific

9  Method to Report Hazard Concerns  Safety Walk-Arounds  Job Safety Analysis  PPE Required  Basic  Special  How to Obtain

10  Safety Meetings  Safety Walk-Arounds (Hazard Hunts)  Ergonomic Assessments Ergonomic Assessment  Behavior Based Safety Observati0ns  Personal Safety Performance Contracts Personal Safety Performance Contracts

11  What will be done?  Who will be contacted?  Where will the injured be taken?  Who will conduct the investigation?  How will the results be communicated?

12  Milestone  Performance  Individual  Internal Teams

13  Internal Documents or Procedures  Other Documents or Procedures  OSHA Standards  ANSI Standards  NFPA Standards  Etc.

14  Training on the SWP for all team members  Tracking on all the Required Training and Participation  Scheduling and Managing All Activities  Safety Meetings  Training  Ergonomic Assessments, Hazard Hunts, etc.  Performing all YOUR required actions

15  Properly Allocated Resources  Project Management Support  Leading by Example  Providing Timely Feedback to Team Members  Make the Safety Program Fun and Engaging  All Hands Safety Meetings with Outside Speakers  Competition with Safety Observations  Others (Whatever Works!)

16  Survey the Team  Get Feedback from Project Management  Review team member Participation  Meet with PM to review your findings  Update or modify the SWP as needed

17  What a SWP is  Why we need a SWP  When we need a SWP  How to develop a Project Specific SWP  How to successfully Implement a SWP  How to check the effectiveness of the SWP