Presentation is loading. Please wait.

Presentation is loading. Please wait.

1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)

Similar presentations


Presentation on theme: "1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)"— Presentation transcript:

1 1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL) Stave Meeting, Oxford, UK, Feb 2012 1

2 New Co-Cure Experiments at LBNL 0-90-0 is a better configuration for mechanical performance but curvature issue is more acute (tight bend across cable) Have studied co-cure on a curved template, sized to compensate for bend, worked well on a stavelet cable In the process of co-curing two full cables in this way in order to laminate a full stave Pre-co-cure metrology complete Cable co-cured flat Cure inside 9.5 inch pipe result 2

3 Facing challenges for stave cutting facings Twisted/bowed facing. We were not able to hold down on our vacuum fixture for cutting (but our vacuum fixture was poor. Remaking it might work) Kapton side is flat across CF-to-kapton transition Targets proved useful when we cut the facings 3 Different thickness on CF-only side due to kapton cable

4 4 Tear in Facing and Zoomed Look at Ridge

5 5 Approximate measurement locations Pre-Cut Facing Thickness Measurements Serial Power Ground return clearly seen on CF side of facing as a raised ridge, but not so much seen in thickness data Note: All measurements in microns

6 6 New Cut Facing Width Previous specification on facings for old 1.3 meter stave was 120 mm minimum, and 120.25 mm maximum, and we achieved this. For this stave we specificed 120.5 mm minimum, 121 mm maximum due to difficulty in achieving this we the co-cured facings We had also anticipated such a change in tolerance when we redesigned the bracket and the angle of its contact points

7 7 Cutting the facings In the end we clamped down the facings and used a straight-edge and razor The edge is not so nice but acceptable In the future would still prefer rotary fine tooth saw and vacuum chuck, but we ran out of time to make this work

8 8 Cut Facing Widths Note: facings from LBNL were numbered 1 and 3, not 1 and two Facing widths (in mm) One facing was in tolerance, one slightly over. But this was ok because we still have plenty of clearance from jig supports (as well as bracket supports)

9 9 Note that our support design has cf tubes centers spaced 119 mm, If aluminum was more narrow the gluing would be on facing slope

10 10 Gluing the CF Tubes Side Rails To keep facing flat this step and all the following glue steps we had to use lead weights to keep the bowed facing flat. Bow was mostly in transverse direction

11 11 Post- Gluing the CF Tubes Side Rails—Transverse Bow

12 12 Gluing the Foam-Pipe Assembly

13 13 Pre-Gluing the Honeycomb Post-Gluing the Honeycomb

14 14 Post-Gluing the Honeycomb—Kapton Side

15 15 Post Final Facing Attachment Stave became flatter (measurements to follow) 2 nd Facing to CF pipes glue attachment was not ideal. Will fix, but will need to improve process in the future

16 16 Stave Component Weights Co-cured 1.2 m Stave Weights Co-cured Facing Component Weights [g] Previous 1.3 meter stave weights, no kapton bus Used lighter ss pipes in co-cured stave. If directly comparing, main mass improvement is 40 grams in carbon fiber facings

17 17 4 Point Support Stave Profile, Side 1 and 3

18 18 4 Point Support Stave Profile, Side 3

19 19 4 Point Support Stave Profile, Side 3 (Flattened in Software)

20 20 Co-Cure Stave Thickness Measurements

21 21 Final Thoughts on Assembly with Co-cured Facings Possibly would prefer extended transverse bus for constant thickness Metallization may be used to indicate cut line Twist creates some problems, mostly for holding facing flat during cutting and grinding We might prefer a wider bus (see bottom) to create a uniform facing thickness We did not really address alignment issues (top facing to bottom, for example). However, all of these problems seem manageable and most glue steps were no more difficult than with flat facings and only required more weight (lead bricks) to keep things flat


Download ppt "1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)"

Similar presentations


Ads by Google