Presentation is loading. Please wait.

Presentation is loading. Please wait.

Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #9 Meeting 09/21/2011 To: DCIT By: Gregg Anderson.

Similar presentations


Presentation on theme: "Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #9 Meeting 09/21/2011 To: DCIT By: Gregg Anderson."— Presentation transcript:

1 Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #9 Meeting 09/21/2011 To: DCIT By: Gregg Anderson

2 Federal Aviation Administration Agenda Welcome – Gregg Anderson Introductions & Roll Call – Jerry Smith DCIT Minutes & Action Items Review – Jonathan Rappaport DCL Trials Review – Craig Morris Decision Lens results – Gregg Anderson DCL end-to-end scenario review – Rob Mead Ground test facility – Gregg Anderson DCIT Working Group Reports – Andy Fry, Jerry Smith Cockpit Demo – John Gonda Open Discussion – Gregg Anderson

3 Federal Aviation Administration Data Communications Implementation Team (DCIT) Welcome – Gregg Anderson

4 Federal Aviation Administration Data Communications Implementation Team (DCIT) Intro & Roll Call – Jerry Smith

5 Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #8 Minutes and Action Item Review – Jonathan Rappaport

6 Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials Review – Craig Morris

7 Federal Aviation Administration DTAP Status Data Comm Trials Automation Platform (DTAP) acquisition in process: -Modifies COTS to provide DCL over FANS -Minimizes platform/software development to the extent possible -S/W development and automation platform to meet safety and operational requirements Planned acquisition in two steps -Engineering to be awarded shortly -Development and fielding to be awarded after engineering complete -Acceptance testing in summer 2012 -Supports FY12 trial IOC and all planned trial sites -Fully coordinated with DCIS contract activity

8 Federal Aviation Administration

9 Federal Aviation Administration Data Communications Implementation Team (DCIT) Decision Lens Results – Gregg Anderson

10 Federal Aviation Administration Site Selection – Decision Lens Status Decision Lens panel vote complete: -Training / Agreement on criteria held 9/14 -Actual conduct of voting on 9/15 -Trials sites order in attached Next Steps: -Trials team to confirm final site availability with FAA Service Area and facility management officials -Final order/selection coordination with airlines and FAA Management planned -Final Selected facility/operator for Site #1 outreach planned for MOU development during 11/11

11 Federal Aviation Administration Lens – Vote #1 UAL/COA IAD Preference Weighting

12 Federal Aviation Administration Lens – Vote #2 (Final) UAL/COA IAD Preference Removed

13 Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL End-to-End Scenario Review – Rob Mead

14 Federal Aviation Administration Data Communications Implementation Team (DCIT) Ground Test Facility– Gregg Anderson

15 Federal Aviation Administration Would a ground test facility be economically beneficial A Ground test facility could provide the following benefits: A representative ground test facility in accordance with AC 20-140A, necessary for regulatory validation compliance. An avionics engineering development test tool for interoperability/functionality. A representative ATC Data Comm end system that would potentially minimize regulatory oversight by allowing a ground-to-ground connection between avionics and ATSU. This may afford a reduction in aircraft cert office imposed lab, ground and flight testing in support of type design and flight standards inspector operational approvals. Ability to create an FAA monitoring and reporting system allowing for early identification of deficiency reports that may impact our ground and airborne standards (i.e. SC214/WG78).

16 Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT Working Group Results – Andy Fry, Jerry Smith

17 Federal Aviation Administration Data Communications Implementation Team (DCIT) Cockpit Demo – John Gonda

18 Federal Aviation Administration Data Communications Implementation Team (DCIT) Open Discussion – Gregg Anderson

19 Federal Aviation Administration Letter of Commitment Submissions OrganizationRepresentative/s AirbusCondis, Jerome Pascal, Joly ARINCOnken, Andrew Harrell, Eric Woods, Mo BoeingMead, Rob Harris CorporationCollings, Chris Lockheed MartinLane, Kathryn Mettus, Paul Mullen, Andy SITAKearns, Kathleen UPSKevin Swiatek


Download ppt "Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #9 Meeting 09/21/2011 To: DCIT By: Gregg Anderson."

Similar presentations


Ads by Google