Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-08-0160-00-0000 Title: 802.21, Session #26, Jacksonville Closing Plenary Date Submitted: Jan, 2008 Presented.

Similar presentations


Presentation on theme: "1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-08-0160-00-0000 Title: 802.21, Session #26, Jacksonville Closing Plenary Date Submitted: Jan, 2008 Presented."— Presentation transcript:

1 1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-08-0160-00-0000 Title: 802.21, Session #26, Jacksonville Closing Plenary Date Submitted: Jan, 2008 Presented at IEEE 802.21 session #26 Jacksonville Authors or Source(s): Vivek Gupta Abstract: Closing Report

2 2 IEEE 802.21 presentation release statements This document has been prepared to assist the IEEE 802.21 Working Group. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.21. The contributor is familiar with IEEE patent policy, as outlined in Section 6.3 of the IEEE-SA Standards Board Operations Manual and in Understanding Patent Issues During IEEE Standards Development http://standards.ieee.org/board/pat/guide.html> Section 6.3 of the IEEE-SA Standards Board Operations Manualhttp://standards.ieee.org/guides/opman/sect6.html#6.3 http://standards.ieee.org/board/pat/guide.html

3 3 Agenda 802.21 Specification Timeline SB Comment Resolution Update Teleconference update Liaison update (802.11, 802.16, IETF) Future Locations

4 4 Revised 802.21 Timeline IEEE 802.21 ECSG formed – March 2003 IEEE 802.21 WG formed – March 2004 Requirements development – September 2004 Call for Proposals – October 2004 Harmonized Single Proposal Confirmed by the WG – May 2005 Ongoing WG Comment Resolution started – July 2005 WG Comment Resolution completed – January 2006 Start of WG Letter Ballot – March 2006 Start of IEEE 802 Sponsor Ballot –(July-07) IEEE 802 Draft Standard sent to RevCom – July 2008 Ongoing Interaction with Other Standards Organization (3GPP, 3GPP2, IETF, 802.11, 802.16, 802.3) - adoption of it depends on the timeline of work items within these groups

5 5 Plan to meet 802.21 Timeline Start of IEEE 802 Sponsor Ballot – (July 2007) For RevCom Approval in July 2008 => Draft Approval Rating > 90% (minimum), preferably >95% SB : Starts Aug-17, Ends Sept 16: Return Ratio: 78% Approval Ratio 62% Comment Resolution for SB (Sep-Nov) =>Recirculation SB-Recirc #1 (recirculation 15 days): Starts Dec-20, Ends Jan-09: Return Ratio: 83%, Approval Ratio: 83% Comment Resolution for SB #1 (Jan meeting) =>Recirculation SB-Recirc #2 (recirculation 15 days): Starts Feb 05, Ends Feb 22: Return Ratio: 84%, Approval Ratio: 88% Comment Resolution for SB #1 (Feb Ad Hoc/March) => Recirculation SB-Recirc #3 (recirculation 4 days): Starts April 24, Ends April 27: Return Ratio: 84%, Approval Ratio: 90% Comment Resolution for SB #1 (May) => Recirculation SB-Recirc #4 (recirculation 15 days): Starts May ??, Ends June ??: Return Ratio: ??%, Approval Ratio: ??% Comment Resolution for SB #1 (Teleconferences) => Recirculation

6 6 SB Recirculation-2 Voting Summary No of Members: 165 Received Votes: 140 Approve: 112 Disapprove: 15 Abstain: 13 Approval ratio = 112/(15+112) = 0.88 Return ratio = 140/165 = 0.84

7 7 SB Recirculation-3 Voting Summary No of Members: 165 Received Votes: 140 Approve: 115 Disapprove: 12 Abstain: 13 Approval ratio = 115/(12+115) = 0.90 Return ratio = 140/165 = 0.84

8 8 Timeline May 12-16: IEEE May Meeting May 22:Draft D10.1 Available May23:Recirc-4 Starts June 7:Recirc-4 Ends Weekly Teleconferences in June June 15:Draft D11.0 (if required) June 20:Recirc-5 Starts (if required) July 05:Recirc-5 Ends July 13-18:IEEE July Meeting July 18:EC Meeting => RevCom Approval

9 9 WG Teleconferences Weekly until July Meeting: Tuesday 6:00 AM PST (2 hours) Resolve SB Comments and update draft No June Ad hoc

10 10 WG Motions

11 11 Authorize 802.21 SB Recirculation-4 Motion the 802.21 WG to authorize a SB Recirculation of draft D10.1 starting in May 2008 Moved By: Junghoon Seconded By:Alice Yes:12 No:0 Abstain:2 Result:Motion Passes

12 12 Resolution of SB Recirc-4 Comments “Motion the 802.21 WG to appoint the formation of a Ballot Resolution Committee consisting of ALL attendees at the weekly WG Teleconferences between May and July IEEE meetings ( 802.21 WG voting members only) to resolve comments as part of SB-4 recirculation (if any) on P802.21/D10.1; authorize the WG Editor to revise the draft in accordance with the Ballot Resolution Committee's resolution of comments and reissue the document as P802.21/D11.0 (if required); Moved By: Subir Seconded By: James Yes:13 No:0 Abstain:1 Result: Motion Passes

13 13 Authorize 802.21 SB Recirculation-5 Motion the 802.21 WG to authorize a SB Recirculation of draft D11.0 (if needed) starting in June 2008 Moved By: Behcet Seconded By:David Yes:14 No:0 Abstain:1 Result:Motion Passes

14 14 Security SG Motion Motion the 802.21 WG to Approve the PAR and 5C as described in document 21-08-0006-08-0sec for consideration by 802 EC in July 2008 Moved By: Yoshi Seconded By:Shubranshu Yes:16 No:0 Abstain:1 Result:Motion Passes

15 15 Future Sessions

16 16 Future Sessions - 2008 Plenary: July 13 th – 18 th, 2008, Denver, Colorado Co-located with all 802 groups Interim: Sept 7 th – 12 th,2008, (Big Island, Hawaii) Meeting co-located with 802.11/15/18/19/20/22 Plenary: Nov 9 th – 14 th,2008, D allas, TX Co-located with all 802 groups

17 17 Future Sessions - 2009 Interim: Jan 18-23, 2009, Hyatt Century Plaza, Los Angeles, CA, USA Meeting co-located with 802.11/15/18/19/20/22 Plenary: March 8-13, 2009, Hyatt Regency & Fairmont Vancouver, BC, Canada Co-located with all 802 groups Interim: May 10-15, 2009, Fairmont The Queen Elizabeth, Montreal, Canada Meeting co-located with 802.11/15/18/19/20/22 Plenary: July 12-17, 2009, Hyatt Regency San Francisco, CA Co-located with all 802 groups Interim: Sept 20-25, 2009, Hilton Waikola Village, Big Island, Hawaii Meeting co-located with 802.11/15/18/19/20/22 Plenary: Nov 15-20, 2009, Hyatt Regency, Atlanta, GA Co-located with all 802 groups

18 18 Future Sessions - 2010 Interim: Jan, 2010, Location TBD Meeting co-located with 802.11/15/18/19/20/22 Plenary: March 14-19, 2010, Caribe Royale, Orlando Co-located with all 802 groups Interim: May 16-21, 2010, Location TBD Meeting co-located with 802.11/15/18/19/20/22 Plenary: July 11-16, 2010, Manchester Grand Hyatt, San Diego, CA Co-located with all 802 groups Interim: Sept 12-17, 2010, Hilton Waikola Village, Big Island, Hawaii Meeting co-located with 802.11/15/18/19/20/22 Plenary: Nov 7-12, 2010, Hyatt Regency, Dallas, Texas Co-located with all 802 groups


Download ppt "1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-08-0160-00-0000 Title: 802.21, Session #26, Jacksonville Closing Plenary Date Submitted: Jan, 2008 Presented."

Similar presentations


Ads by Google