Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0208-00-0000 Title: 802.21, Session #20, Montreal Closing Plenary Date Submitted: May, 2007 Presented.

Similar presentations


Presentation on theme: "1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0208-00-0000 Title: 802.21, Session #20, Montreal Closing Plenary Date Submitted: May, 2007 Presented."— Presentation transcript:

1 1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0208-00-0000 Title: 802.21, Session #20, Montreal Closing Plenary Date Submitted: May, 2007 Presented at IEEE 802.21 session #20 Montreal Authors or Source(s): Vivek Gupta Abstract: Closing Plenary

2 2 IEEE 802.21 presentation release statements This document has been prepared to assist the IEEE 802.21 Working Group. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.21. The contributor is familiar with IEEE patent policy, as outlined in Section 6.3 of the IEEE-SA Standards Board Operations Manual and in Understanding Patent Issues During IEEE Standards Development http://standards.ieee.org/board/pat/guide.html> Section 6.3 of the IEEE-SA Standards Board Operations Manualhttp://standards.ieee.org/guides/opman/sect6.html#6.3 http://standards.ieee.org/board/pat/guide.html

3 3 Agenda 802.21 Specification Timeline Comment Resolution Update Liaison update (802.11, 802.16, IETF) Ballot Resolution meeting Ad hoc teleconference update Future Locations

4 4 Revised 802.21 Timeline (Sep 2006) IEEE 802.21 ECSG formed – March 2003 IEEE 802.21 WG formed – March 2004 Requirements development – September 2004 Call for Proposals – October 2004 Harmonized Single Proposal Confirmed by the WG – May 2005 Ongoing WG Comment Resolution started – July 2005 WG Comment Resolution completed – January 2006 Start of WG Letter Ballot – March 2006 Start of IEEE 802 Sponsor Ballot – September 2006 (March 2007) IEEE 802 Draft Standard Approved – 2 nd Half 2007 Ongoing Interaction with Other Standards Organization (3GPP, 3GPP2, IETF, 802.11, 802.16, 802.3) - adoption of it depends on the timeline of work items within these groups

5 5 Revised 802.21 Timeline (Jan 2007) IEEE 802.21 ECSG formed – March 2003 IEEE 802.21 WG formed – March 2004 Requirements development – September 2004 Call for Proposals – October 2004 Harmonized Single Proposal Confirmed by the WG – May 2005 Ongoing WG Comment Resolution started – July 2005 WG Comment Resolution completed – January 2006 Start of WG Letter Ballot – March 2006 Start of IEEE 802 Sponsor Ballot – Sept 2006 (March 2007) (July-07) IEEE 802 Draft Standard Approved – 2 nd Half 2007 ??? Ongoing Interaction with Other Standards Organization (3GPP, 3GPP2, IETF, 802.11, 802.16, 802.3) - adoption of it depends on the timeline of work items within these groups

6 6 Plan to meet 802.21 Timeline Start of IEEE 802 Sponsor Ballot – (July 2007) For EC Approval in July 2007 => Draft Approval Rating > 90% (minimum), preferably >95% => No new Disapprove voters, Few/None new comments from Disapprove voters LB #1: Starts March 31, Ends April 30: Return Ratio: 81% Approval Ratio 26% Comment Resolution for LB #1 (May, June ad hoc, Sep) =>Recirculation LB #1a (recirculation): Starts Oct 06, Ends Oct 23: Return Ratio: 85%, Approval Ratio: 30% Comment Resolution for LB #1a (Ad Hoc in Oct, Nov meeting) =>Recirculation LB #1b (recirculation): Starts Dec 10, Ends Jan 03: Return Ratio: 86%, Approval Ratio: 46% Comment Resolution for LB #1b (Jan meeting) => Recirculation LB #1c (recirculation): Starts Feb 04, Ends Feb 19: Return Ratio: 86%, Approval Ratio: 66% Comment Resolution for LB #1c (Ad hoc in Feb, March meeting…) LB #1d (recirculation): Starts Apr 13, Ends Apr 27: Return Ratio: 86%, Approval Ratio: 75% Comment Resolution for LB #1d (May meeting, Ad hoc in June:…) => recirculation LB #1e (recirculation): Starts, Ends ??: Issues for LB #1e (July meeting) => Go to Sponsor Ballot

7 7 June 2007 Ad hoc Meeting Motion the 802.21 WG to hold an ad hoc meeting if required in June 2007 Moved By: Marc Seconded By:Subir Yes: 9 No: 1 Abstain:5 Result: Motion Passes From March 2007, Orlando

8 8 June Meeting Update Possible Venues: ETRI, Korea:11 London-Southampton, UK (jointly with TGu):8 Santa Clara, California:4 Dates: Week of June 11 th (June 13-15)7 Week of June 18 th (coincides with WMF) 4 Week of June 25 th (3GPP):5 June Meeting: ETRI Korea, June 13-15

9 9 LB-1d Comment Resolution Progress SectionStart #End #Resolved #Total Comments 1-4124 5256642 66714882 7149440250292 8441560120 Annex561581021 Total: 581 Comments Includes Editorials (Total: 166) Resolved: ~560 comments (~25 Technical comments remain)

10 10 Recirculation Ballot Scope According to the IEEE SA, comments can be valid for three reasons: 1) Comments on changed text 2) Comments on text affected by changed text 3) Comments on text referred to by outstanding unresolved comments

11 11 Teleconferences June 05, 9 PM EST: June 19, 9 PM EST: July 03, 9 PM EST:

12 12 Motions

13 13 Interim Draft D 5.1 Motion the 802.21 WG to direct the WG Editor to produce an interim 802.21 draft based on all comments resolved as described in Commentary file 21-07-0171-04- 0000_LB1d_Master_File.usr) and post it to the 802.21 web site Moved By: Juan Carlos Seconded By: Srini Yes:15 No:0 Abstain:0 Result: Motion Passes

14 14 Resolution of LB-1d Comments “Motion the 802.21 WG to appoint the formation of a Ballot Resolution Committee consisting of ALL attendees at the June meeting( 802.21 WG voting members only) to resolve any remaining comments as part of LB-1d recirculation on P802.21/D5; authorize the WG Editor to revise the draft in accordance with the Ballot Resolution Committee's resolution of comments on the WG LB-1d and reissue the document as P802.21/D5.2; conduct a 10 day email ballot on changes in draft D5.2 and if approved reissue it as draft D6.0; Moved By: Subir Seconded By: Qiaobing Yes:13 No:0 Abstain:5 Result: Motion Passes

15 15 Authorize 802.21 LB-1 Recirculation “Motion the 802.21 WG to authorize a WG Letter Ballot recirculation on draft P802.21/D6.0 under the condition that the 10 day email ballot on D5.2 succeeds" Moved By: Marc Seconded By:Srini Yes:17 No: 0 Abstain: 0 Result: Motion Passes

16 16 Liaison Response to 3GPP Motion the 802.21 WG to authorize sending the response letter 21-07-0190-03-0000-Liaison-Response-to- 3GPP-from-802-21 to 3GPP Moved By: Juan Carlos Seconded By:Scott Yes:10 No:0 Abstain:0 Result: Motion Passes

17 17 Liaison Response to 802.11 Motion the 802.21 WG to authorize sending the response letter 21-07-0210-01-0000-Liaison-Response-to- 802.11u-from-802-21 to 802.11 Moved By: Marc Seconded By:Scott Yes:5 No:0 Abstain:1 Result: Motion Passes

18 18 Liaison Response to IETF-MIPSHOP Motion the 802.21 WG to authorize sending the letter 21-07-0203-02-0000-Liaison-to-IETF-Mipshop to IETF- Mipshop Moved By: Scott Seconded By:Ajay Yes:12 No: 0 Abstain: 1 Result: Motion passes

19 19 Future Sessions

20 20 Future Sessions - 2007 Plenary: July 15 th – 20 th,2007, San Francisco Co-located with all 802 groups Interim: Sept 16 th – 21 st,2007, Hawaii, Big Island Meeting co-located with 802.11/15/18/19/20/22 Plenary: Nov 11 th – 16 th,2007, Atlanta Co-located with all 802 groups

21 21 Future Sessions - 2008 Interim: Jan 13 th – 18 th, 2008 (Taipei) Meeting co-located with all 802 groups Plenary: March 16 th – 21st,2008, Orlando, Florida Co-located with all 802 groups Interim: May 11 th – 16 th, 2008 (Jacksonville) Meeting co-located with 802.11/15/18/19/20/22 Plenary: July 13 th – 18 th,2008, Denver, Colorado Co-located with all 802 groups Interim: Sept 7 th – 12 th,2008, (Salt Lake/Minneapolis ??) Meeting co-located with 802.11/15/18/19/20/22 Plenary: Nov 9 th – 14 th,2008, D allas, TX Co-located with all 802 groups


Download ppt "1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-07-0208-00-0000 Title: 802.21, Session #20, Montreal Closing Plenary Date Submitted: May, 2007 Presented."

Similar presentations


Ads by Google