Download presentation
Presentation is loading. Please wait.
Published byKelley McDowell Modified over 9 years ago
1
1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-06-0746-00-0000 Title: 802.21, Melbourne Closing Plenary Date Submitted: September, 2006 Presented at IEEE 802.21 session #16 Melbourne Authors or Source(s): Vivek Gupta Abstract: Closing Plenary
2
2 IEEE 802.21 presentation release statements This document has been prepared to assist the IEEE 802.21 Working Group. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.21. The contributor is familiar with IEEE patent policy, as outlined in Section 6.3 of the IEEE-SA Standards Board Operations Manual and in Understanding Patent Issues During IEEE Standards Development http://standards.ieee.org/board/pat/guide.html> Section 6.3 of the IEEE-SA Standards Board Operations Manualhttp://standards.ieee.org/guides/opman/sect6.html#6.3 http://standards.ieee.org/board/pat/guide.html
3
3 Agenda 802.21 Specification Timeline Comment Resolution Update Liaison update (802.11, IETF) Ad hoc teleconference update Future Locations
4
4 802.21 Timeline (From: DCN: 21-05-0430-00-0000 Title: 802.21 Expected Development Timeline Date Submitted: Nov 14, 2005) IEEE 802.21 ECSG formed – March 2003 IEEE 802.21 WG formed – March 2004 Requirements development – September 2004 Call for Proposals – October 2004 Harmonized Single Proposal Confirmed by the WG – May 2005 Ongoing WG Comment Resolution started – July 2005 WG Comment Resolution completed – January 2006 Start of WG Letter Ballot – March 2006 Start of IEEE 802 Sponsor Ballot – September 2006 IEEE 802 Draft Standard Approved – March 2007 Ongoing Interaction with Other Standards Organization (3GPP, 3GPP2, IETF, 802.11, 802.16, 802.3) - adoption of it depends on the timeline of work items within these groups
5
5 Revised 802.21 Timeline (Sep 2006) IEEE 802.21 ECSG formed – March 2003 IEEE 802.21 WG formed – March 2004 Requirements development – September 2004 Call for Proposals – October 2004 Harmonized Single Proposal Confirmed by the WG – May 2005 Ongoing WG Comment Resolution started – July 2005 WG Comment Resolution completed – January 2006 Start of WG Letter Ballot – March 2006 Start of IEEE 802 Sponsor Ballot – September 2006 (March 2007) IEEE 802 Draft Standard Approved – 2 nd Half 2007 Ongoing Interaction with Other Standards Organization (3GPP, 3GPP2, IETF, 802.11, 802.16, 802.3) - adoption of it depends on the timeline of work items within these groups
6
6 Plan to meet 802.21 Timeline Start of IEEE 802 Sponsor Ballot – (March 2007) For EC Approval in March 2007 => Updated draft available in March 2007 => Draft Approval Rating > 90% (minimum), preferably >95% LB #1: Starts March 31, Ends April 30: Return Ratio: 81% Approval Ratio 26% Comment Resolution for LB #1a (May, June ad hoc, Sep) =>Recirculation LB #1a (recirculation): Starts Sep ??, Ends Oct ??: Return Ratio: ??%, Approval Ratio: ??% Comment Resolution for LB #1a (Ad Hoc in Oct, Nov meeting) =>Recirc LB #1b (recirculation): Starts Nov ??, Ends Dec ??: Return Ratio: ??%, Approval Ratio: ??% Comment Resolution for LB #1b (Jan meeting) => Recirculation LB #1c (recirculation): Starts Jan ??, Ends Feb ??: Return Ratio: ??%, Approval Ratio: ??% Comment Resolution for LB #1c (Ad hoc in Feb,March meeting…) Updated draft produced in March meeting itself before EC meeting on Friday….with 95+% Approval rating… Maybe go for another Recirc LB #d in Feb to meet Approval rating…
7
7 Comment Resolution Progress SectionStart Comment # End Comment # Resolved until Comment # Remaining Comments 1-4190090 (Done) 59125091-23020 (Done) 6251483251-41370 (Done) 7484677484-537140 (Done) 8679915679-715200 (Done) Total Handled 152 Deferred/Rejected/Unresolved comments More than 25 submitted contributions were discussed All 1323 comments resolved
8
8 October Ad hoc Meeting Motion the 802.21 WG to hold an ad hoc meeting if required in October 2006 Moved By: David Hunter Seconded By:Scott Henderson Yes: 8 No: 4 Abstain:8 Motion Passes
9
9 Ad Hoc In October September Meeting : Sep 17 – Sep 21 Updated draft: September 29 15 day LB Recirculation: Starts Sep 30, ends: Oct 20 Reply Comments due: Oct 25 Ad hoc: week of Oct 29 (Oct 30-Nov-1) Nov meeting Nov 13-17
10
10 October Ad hoc Meeting Locations Dates: Week of Oct 29; Nov 2,3,4: Locations: [1]: Windsor, Ontario: 6 [2]: New Jersey 11 [3]: Mountain View/San-Diego, California 11 [4]: Portland, Oregon 5 Nov 2,3,4 – California-SD:8 October ad hoc: Oct 31, Nov 1,2 – New Jersey: :11
11
11 Teleconferences Sep 28: LB #1a Discussion Every two weeks on Tuesdays: Starting, Tuesday October 10 until Nov meeting Sep 28, Oct 10, Oct 24, Nov 7 Time: 9-12 AM EDT
12
12 Motions
13
13 Updated Draft D 2.0 Motion the 802.21 WG to direct the WG Editor to produce an updated 802.21 draft based on all comments resolved as part of LB-1 (as described in Commentary file 21-06- 0647-14-0000_LB1_Master_File.usr) and post it to the 802.21 web site Moved By: Xiaoyu Seconded By: Reijo Yes:22 No:0 Abstain:0 Result: Motion Passes
14
14 Authorize 802.21 LB-1 Recirculation Motion the 802.21 WG to authorize a LB recirculation vote on updated draft D2.0 (entire draft open to comment) Moved By: Subir Das Seconded By:Ajay Yes:21 No:0 Abstain:0 Result: Motion Passes
15
15 Future Sessions
16
16 Future Sessions Plenary: Nov 12 th – 17 th, Hyatt Regency Dallas, TX, USA. Co-located with all 802 groups
17
17 Future Sessions - 2007 Interim: Jan 14 th – 19 th, 2007 London, UK. Meeting co-located with all 802 groups Plenary: March 11 th – 16 th,2007, Orlando Florida Co-located with all 802 groups Interim: May 13 th – 18 th, 2007 Montreal, Canada Meeting co-located with 802.11/15/18/19/20/22 Plenary: July 15 th – 20 th,2007, San Francisco Co-located with all 802 groups Interim: Sept 16 th – 21 st,2007, Hawaii, Big Island Meeting co-located with 802.11/15/18/19/20/22 Plenary: Nov 11 th – 16 th,2007, Atlanta Co-located with all 802 groups
18
18 Future Locations - 2008 Interim: Jan, 2008 TBD Meeting co-located with all 802 groups Plenary: March 16 th – 21st,2008, New Orleans Co-located with all 802 groups Interim: May, 2008 TBD Meeting co-located with 802.11/15/18/19/20/22 Plenary: July 13 th – 18 th,2008, Denver, Colorado Meeting Co-located with all 802 groups Interim: Sept,2008, TBD Meeting co-located with 802.11/15/18/19/20/22 Plenary: Nov 9 th – 14 th,2008, D allas, TX Meeting Co-located with all 802 groups
Similar presentations
© 2025 SlidePlayer.com Inc.
All rights reserved.