1 Turkey Hydrology Working Group program Mission 2: Model preparation and setup Wil N.M. van der Krogt 12 – 13 November 2014 Denizli The Netherlands The River Basin Explorer project

2 River Basin Explorer Scheme of processes and workflows in the River Basin Explorer Link between RIBASIM and WFD Explorer ExportImport Cases Water balance Concentrations, EQR, Scores Hydrology Workgroup

3 Why balance: the Water Balancing Act 1 januari 2008 Demand Population growth Increased irrigation Increased hydro-power Environmental awareness Supply Quantity (scarcity, upstream developments) Quality Degradation (morphology ) Cost of Options Buyuk Menderes RIBASIM: tool for balancing water supply and demand IWRM Measures

4 Sub-catchments Water supply Surface water Groundwater Aquifers Ayeryawaddy River basin (Myanmar)

5 1 januari 2008 Water demand

6 1 januari 2008

7 Infrastructure

8 1 januari 2008 Introduction R I B A S I M Oum Er Rbia river basin (Morocco)

9 1 januari 2008 Entry of node and link characteristics using spreadsheet based model data input forms Introduction R I B A S I M

10 1 januari 2008 20131950 demand year 203020132050 DMI demand Introduction R I B A S I M

11 Hydrology Work Group What has been done: September: Kick-off of the project, opening ceremony Short introduction on river basin simulation model RIBASIM Start of data collection based on general data shopping list October: Collection of data based on general data shopping list like maps Start setup of the model 1 januari 2008

12 Objective of mission The preparation of the following deliverables: RIBASIM node-link network schematization for Buyuk Menderes River basin (version 1) Entered network schematization in RIBASIM Detailed list of required data: model data, time series data and other data Overview of the already available data List of identified missing data and who will collect them Hydrology Work Group

13 Wed 12 Nov Presentation: River basin schematization Design a RIBASIM node-link network schematization of the Buyuk Menderes River basin based on knowledge of the WG participants, available maps and basin experts Thu 13 Nov Redesign the RIBASIM node-link network schematization of the Buyuk Menderes River basin based on available maps and knowledge of the WG participants and basin experts Enter the network schematization into RIBASIM Presentation: RIBASIM input data List in detail the required model data, time series data and other data for the Buyuk Menderes network schematization Determine the present available data, Identify the still missing data and who will collect them Hydrology Work Group

14 Questions ? Buyuk Menderes RIBASIM

15 1 januari 2008 Model data base for base year 2013 RIBASIM7 / Delwaq Water demand, -allocation and quality Historical hydrological data 1950 - 2013 Result files Results Socio- economic scenarios Measure and strategy data files Measure and strategy data files Measure and strategy data Agriculture sector scenarios Climate change data files Climate change data files Change of hydrological data Climate change scenarios Interventions, management actions Agriculture sector data Agriculture sector data Waste load data Land-use and population data 2010 - 2050 Land-use and population data 2010 - 2050 Crop plan data Land-use and population data 2010 - 2050 Land-use and population data 2010 - 2050 Land-use and population data 2015 - 2050 Water quality scenarios