1 Eco Sustainable Solutions Limited Piddlehinton AD Facility

2 AD Process – “The Concrete Cow”

3 Piddlehinton AD Facility Regulatory Framework Bespoke Permit – EPR/FP3692SU – 12/2010 Planning Permission – 1/D/2008/0989 – 6/2010 ABPR Validation – 11/445/0041/ABP/CMP – 4/2012

4 Piddlehinton AD Facility Site Civils 1 Site Cleared Made Ground Removed Site Fully Lined

5 Piddlehinton AD Facility Site Civils 2 Reception / Compound Area Digester and Tank Bases

6 Piddlehinton AD Facility AD Plant 1 Digester Construction Tank Construction

7 Piddlehinton AD Facility AD Plant 2 Site Pipe Work Site Control System

8 Piddlehinton AD Facility AD Plant 3 Site CHP Unit & Flare Stack Gas Conditioning

9 Piddlehinton AD Facility AD Plant 4 Pasteurisation Plant End Storage Tank

10 Piddlehinton AD Facility Reception Barn 1 Reception Barn Water System

11 Piddlehinton AD Facility Reception Barn 2 Biofilter system Clearance Should be Sufficient...

12 Piddlehinton AD Facility Plant Process 1 Waste Discharge Waste Processing & Blending

13 Piddlehinton AD Facility Plant Process 2 Digestion Power Generation

14 Piddlehinton AD Facility Plant Process 3 Pasteurisation Storage and Discharge Field Injection

15 Piddlehinton AD Facility Issues So Far... Construction Contracts Health & Safety Management Ground Conditions Budget Over Runs Weather Grid Connection German / English Translations