CONCERTO; Milton Keynes Sustainable Residential Quarter Jon Muncaster (English Partnerships) cRRescendo City Coordinator Concerto is co-funded by the European.

Similar presentations


Presentation on theme: "CONCERTO; Milton Keynes Sustainable Residential Quarter Jon Muncaster (English Partnerships) cRRescendo City Coordinator Concerto is co-funded by the European."— Presentation transcript:

1 CONCERTO; Milton Keynes Sustainable Residential Quarter Jon Muncaster (English Partnerships) cRRescendo City Coordinator Concerto is co-funded by the European Commission cRRescendo is a project of the concerto initiative co-funded by the European Commission under the Sixth Framework Programme

2 cRRescendo; Milton Keynes Partners English Partnerships Milton Keynes Council Environmental Change Institute, Oxford University Milton Keynes Energy Agency / NEF Arup Associate Community - Northampton

3 cRRescendo; Milton Keynes Location

4 cRRescendo; Milton Keynes Site Aerial: 3D

5 cRRescendo; Milton Keynes Proposed Project Features EC CLASSIFICATIONS 1.RUE (Rational Use of Energy) 2.RES (Renewable Energy Systems) 3.Poly-generation SAVINGS (in bid):C0 2 46% Energy 38%

6 cRRescendo; Milton Keynes Proposed Project Features 1. RUE (Rational Use of Energy) Eco building construction - Super insulation - High thermal mass - Air tight construction - Triple glazing, special glass, sun spaces Water efficiency Heat recovery and ventilation systems Combined Heat and Power

7 cRRescendo; Milton Keynes Proposed Project Features 2. RES (Renewable Energy Systems) PV - 20% roof area Ground source heat pumps (GSHP) Phase 2 CHP; biomass plant and boilers (planned) Wind (micro-generation) possible

8 cRRescendo; Milton Keynes Proposed Project Features 3. Poly-generation Combined Heat and Power - Phase 1: Gas fired community heating/cooling - Phase 2: Biomass (planned) Private Wire / Island Mode RES (Renewable Energy Systems) Intelligent Management Systems (IMS)

9 cRRescendo; Milton Keynes Current Position CHP Phase 1; complete, commissioned. CHP; service contracts to developments. CHP Phase 2; (incl. Biomass); under negotiation. B4 Phase 1; (650 homes); developer selected, planning application October B4 Phase ; 1 site preparation complete. First School; design stage advanced, planning application October Research, Training and Dissemination; activities started. Overall; technical and programme review

10 cRRescendo; Milton Keynes Construction Progress CHP Phase 1

11 cRRescendo; Milton Keynes Concerto Site B4 Ph. 1 & School

12 cRRescendo; Milton Keynes B4 Phase 1 Proposal

13

14 cRRescendo; Milton Keynes B4 Phase 1 Energy Proposals TypeTarget Kg CO 2 /m2/an Design Kg CO 2 /m2/an Improvement % Studio % 2 - Person % 4 - Person % 5 - Person % 6 - Person %

15 cRRescendo; Milton Keynes First School

16 cRRescendo; Milton Keynes Cooperation Across The 4 Cities RESEARCH TRAINING DISSEMINATION Study Trip to Netherlands July 2007

17 English Partnerships The National Regeneration Agency Concerto is co-funded by the European Commission cRRescendo is a project of the concerto initiative co-funded by the European Commission under the Sixth Framework Programme