Presentation is loading. Please wait.

Presentation is loading. Please wait.

April19th, 2002TF-NGN, Southampton1 ASTON project TF-NGN, Southampton April 19 th, 2002 Victor Reijs

Similar presentations


Presentation on theme: "April19th, 2002TF-NGN, Southampton1 ASTON project TF-NGN, Southampton April 19 th, 2002 Victor Reijs"— Presentation transcript:

1 April19th, 2002TF-NGN, Southampton1 ASTON project TF-NGN, Southampton April 19 th, 2002 Victor Reijs victor.reijs@heanet.ie

2 April19th, 2002TF-NGN, Southampton2 Introduction ASTON a step towards optical networking Born on July 30 th, 2001 FLAG Telecom/TERENA Preparation meetings December 6 th, 2001 February 12 th, 2002 Project proposal: April 2 nd, 2002

3 April19th, 2002TF-NGN, Southampton3 Activities Bandwidth on Demand... Network Management... Transport at 40 Gbit/s and beyond... 10 Gbit/s Ethernet connectivity over long distances… Next step project proposal… Proposed topology...

4 April19th, 2002TF-NGN, Southampton4 Proposed topology

5 April19th, 2002TF-NGN, Southampton5 Bandwidth on demand Real-time channel provisioning G-MPLS and/or if feasible O-BGP FLAG provides point2point SDH/SONET links Multi-provider testbed CESNET, FLAG Telecom, NetherLight, PSNC EXC will be used Multiple domain Closely linked with Network Management

6 April19th, 2002TF-NGN, Southampton6 Network Management Configuration management –Provisioning of soft permanent channels –Provisioning of (hard) permanent channels Fault management Performance management QoS monitoring and SLS auditing Closely linked with Bandwidth on Demand

7 April19th, 2002TF-NGN, Southampton7 Transport at 40 Gbit/s and beyond Assess technological challenges Establish contact with connectivity/equipment providers Create and operate a laboratory test Possibly create/operate a WAN testbed (like at PSNC)

8 April19th, 2002TF-NGN, Southampton8 10 Gbit/s Ethernet over long distances Get experience with dedicated dark fiber (40 km) Development methods of deployment in NREN Implement/test a long distance (600 km) connection between FLAG Telecom and CESNET Test 10 GE transit through FLAG Telecom

9 April19th, 2002TF-NGN, Southampton9 Follow-up project proposal Inventory of other projects Evaluating results/technologies/services for 2003/2004 Define activities in follow-up project Gather commitments Write/present project proposal

10 April19th, 2002TF-NGN, Southampton10 Present status Wait for commitment of FLAG Telecom Investigating new/other providers Start-up two activities within TF-NGN: –transport at 40 Gbit/s –10 Gbit/s ethernet Find organization(s) to support/rewrite BoD/NM and start brainstorming Commitments of NREN’s/equipment providers New proposal towards TTC on May 24 th, 2002

11 April19th, 2002TF-NGN, Southampton11


Download ppt "April19th, 2002TF-NGN, Southampton1 ASTON project TF-NGN, Southampton April 19 th, 2002 Victor Reijs"

Similar presentations


Ads by Google