Extends A WARM WELCOME. Pumping 780 Million Litres of Water per Day to Bangalore City through Cauvery Water Supply Scheme Stage-I, II, III and IV PRESENT.

Similar presentations


Presentation on theme: "Extends A WARM WELCOME. Pumping 780 Million Litres of Water per Day to Bangalore City through Cauvery Water Supply Scheme Stage-I, II, III and IV PRESENT."— Presentation transcript:

1 Extends A WARM WELCOME

2 Pumping 780 Million Litres of Water per Day to Bangalore City through Cauvery Water Supply Scheme Stage-I, II, III and IV PRESENT SCENARIO

3 Handling 410 Million Litres of sewage and treating them in 5 sewage treatment plants located in different parts of the City.

4

5

6

7 Customer friendly initiatives Electronics Clearing System introduced; Informative Website in position; Interactive Voice Response System in position; Monthly Water Adalats in each Sub- Division effectively working; Customer Charter launched; Many transparent measures introduced for the benefit of customers;

8 Sl.NoSlabs ( in litres)Amount in Rs. Minimum90.00 10-150006.00 215001-250008.00 325001-5000012.00 450001-7500030.00 575001-10000036.00 6100000 & above36.00 DOMESTIC TARIFF STRUCTURE

9 NON-DOMESTIC TARIFF STRUCTURE Sl.NoSlabs (in litres)Amount in Rs. Minimum360.00 10-1000036.00 210001-2000039.00 320001-4000044.00 440001-6000051.00 560001-10000057.00 6100001 & above60.00 INDUSTRIES TARIFF STRUCTURE Sl.NoCategoryAmount in Rs. 1 INDUSTRIES 60.00/K.L.

10 CURRENT PROJECTS ON HAND Commissioning of seven sewage treatment plants under Cauvery Water Supply Scheme Stage-IV, Phase-I, adding an additional capacity of 245 MLD. Projected to be completed by December 2003

11 CURRENT PROJECTS ON HAND Comprehensive networking of all BWSSB offices in Bangalore through LAN WAN. Proposed to be completed by first week of Feb. 003.

12 CURRENT PROJECTS ON HAND Two tertiary treatment plants – Vrishabhavathi Valley (60 MLD) and Yelahanka (10 MLD) to be commissioned during Feb. 2003

13 CURRENT PROJECTS ON HAND National River Conservation Plan works with an estimated cost of Rs. 47 crores under implementation

14 CURRENT PROJECTS ON HAND Newly added areas being networked with water supply and UGD facilities at an estimated cost of Rs. 143 crores.

15 CURRENT PROJECTS ON HAND An ambitious project for reducing Unaccounted For Water (UFW) and bringing it down to less than 15 % under implementation. Proposed to be completed by December 2003.

16 AusAID Master Plan Project 1.Planning for Water Supply, Sewerage & Environmental Sanitation. 2.Services Upgrading and Extension for the Urban Poor and Vulnerable Communities. 3.Institutional Capacity Building and Strengthening. 4.Water Supply and Sewerage Pilot Projects. Four Components

17 Water supply requirements(MLD) B.W.S.S.B. Service Area 2000200520102025 65587311472010

18 Capital cost estimates for Water Supply rehabilitation (2001-25) (In Rs. Crores) 2001- 05 2006- 10 2011- 15 2016- 20 2021- 25 Total Water Treatment Plants 26.0515.1020.554.5511.0077.25 Major Pipelines31.9353.2563.8547.6860.70257.41 GLRs &OHTs14.015.4811.790.348.3339.85 Pumping Stations 10.075.8010.0629.1711.9776.07 Minor Pipelines43.6039.1836.9535.30 190.90 TOTAL125.66118.81152.10117.04127.30640.91

19 Summary of Capital Costs Stage 1 (In Rs. Crores) Stage 2 (In Rs. Crores) Leakage & UFW242.70- Water supply rehabilitation & Extension 139.70370.30 Major sewer rehabilitation 190.40195.80 Minor sewer rehabilitation 227.70227.30 TOTAL800.50793.40

20 Customer friendly initiatives to be launched during the first half of 2003 Spot billing system 24-hour KIOSKS Web enabled access to customer history Web enabled interactive redressal system