1 Work Zone Safety and Mobility Transportation Management Plans Jason Gutting, P.E. Michigan Department of Transportation

2 TMP Process Work Zone Safety and Mobility Policy Work Zone Safety and Mobility Policy Developed by cross sectional team Developed by cross sectional team Planners, Traffic and Safety, Development, Communications, etc. Planners, Traffic and Safety, Development, Communications, etc. Effective September 1, 2007 Effective September 1, 2007 Guidance Document Guidance Document Applies to all MDOT work zones (construction, maintenance, permits/utilities) Applies to all MDOT work zones (construction, maintenance, permits/utilities) Work Zone Safety and Mobility Manual Work Zone Safety and Mobility Manual Roles, responsibilities, strategies, etc. Roles, responsibilities, strategies, etc. TMP process created while preparing the manual TMP process created while preparing the manual

3 TMP Contents Transportation Management Plans (TMP) Transportation Management Plans (TMP) Required on all projects Required on all projects Temporary Traffic Control Plan (TTCP) Temporary Traffic Control Plan (TTCP) Transportation Operations Plan (TOP) Transportation Operations Plan (TOP) Public Information Plan (PIP) Public Information Plan (PIP) Significant Project Significant Project TTCP, TOP and PIP Required TTCP, TOP and PIP Required Non-Significant Project Non-Significant Project TTCP Required TTCP Required TOP and PIP Recommended TOP and PIP Recommended

4 TMP Development TMP development begins in the project planning and scoping phase TMP development begins in the project planning and scoping phase Involves planning and design staff Involves planning and design staff Incorporates big picture issues Incorporates big picture issues Further details as project progresses Further details as project progresses Allows more accurate programming and budgets Allows more accurate programming and budgets Maintaining traffic schemes (Temporary structure for maintaining traffic, crossovers, etc.) Maintaining traffic schemes (Temporary structure for maintaining traffic, crossovers, etc.) Temporary ITS applications Temporary ITS applications Coordination with corridor and network projects Coordination with corridor and network projects

5 TMP Development Project Design Phase Project Design Phase Details flushed out Details flushed out Primary TMP development occurs during this stage in parallel with plan completion Primary TMP development occurs during this stage in parallel with plan completion Project delivery staff are engaged for better coordination and constructability reviews Project delivery staff are engaged for better coordination and constructability reviews Pay items are incorporated into the project plans and specifications Pay items are incorporated into the project plans and specifications Special provisions are documented for project specific and/or unique issues Special provisions are documented for project specific and/or unique issues

6 TMP Development Statewide Peer Review Team (SPRT) Statewide Peer Review Team (SPRT) Mobility analysis and thresholds Mobility analysis and thresholds Travel Time Travel Time Level of Service Level of Service Volume to Capacity Ratio Volume to Capacity Ratio Project Rating system Project Rating system Review Form Review Form Red, Yellow, Green Red, Yellow, Green Executive level engagement Executive level engagement Benefits Benefits Check and balance for mobility issues Check and balance for mobility issues Feedback from other areas Feedback from other areas Statewide Work Zone Administrator provides consistency Statewide Work Zone Administrator provides consistency Staff have been very receptive of this review Staff have been very receptive of this review

7 TMP Implementation Responsibility of project delivery staff Responsibility of project delivery staff Strategy implementation Strategy implementation Changes, variations, etc. provided to development staff Changes, variations, etc. provided to development staff

8 TMP Implementation Performance Performance Performance monitoring Performance monitoring Worksite trailers Worksite trailers Travel time Travel time Queues Queues Cameras / Detectors Cameras / Detectors Crashes Crashes How much did accidents decrease because of mitigation measures and comparable projects How much did accidents decrease because of mitigation measures and comparable projects Did accident severity decrease Did accident severity decrease Measurements versus expectations Measurements versus expectations How did actual measured delay compare with expected delay (travel time, queues) How did actual measured delay compare with expected delay (travel time, queues) Project documentation Project documentation

9 TMP Lessons Learned A TMP template was created to assist project development staff with TMP submittals A TMP template was created to assist project development staff with TMP submittals Uniformity Uniformity Critical Focus Area Critical Focus Area TMP reviews are now conducted as needed versus at pre-determined dates TMP reviews are now conducted as needed versus at pre-determined dates Less Time Crunch Less Time Crunch Better Quality Better Quality Better Use of Staff Resources Better Use of Staff Resources Faster Response for Project Offices Faster Response for Project Offices

10 TMP Lessons Learned Public involvement in the TMP development is critical Public involvement in the TMP development is critical Crash Analysis Crash Analysis Accurate Traffic Data Accurate Traffic Data

11 Work Zone Safety and Mobility Manual MDOT’s Work Zone Safety and Mobility Manual can be found at the following link. TMP information can be found in Chapter 4 MDOT’s Work Zone Safety and Mobility Manual can be found at the following link. TMP information can be found in Chapter 4 http://www.michigan.gov/documents/mdot/MDOT_WorkZoneSafetyAnd MobilityManual_233891_7.pdf http://www.michigan.gov/documents/mdot/MDOT_WorkZoneSafetyAnd MobilityManual_233891_7.pdf http://www.michigan.gov/documents/mdot/MDOT_WorkZoneSafetyAnd MobilityManual_233891_7.pdf http://www.michigan.gov/documents/mdot/MDOT_WorkZoneSafetyAnd MobilityManual_233891_7.pdf MDOT’s Work Zone Safety and Mobility Policy is not available on-line but the document can be electronically provided if requested MDOT’s Work Zone Safety and Mobility Policy is not available on-line but the document can be electronically provided if requested Contact Jason Gutting, P.E., Systems Operations and Management Engineer, guttingj@michigan.gov, 517-636-0463 Contact Jason Gutting, P.E., Systems Operations and Management Engineer, guttingj@michigan.gov, 517-636-0463guttingj@michigan.gov


Download ppt "Work Zone Safety and Mobility Transportation Management Plans Jason Gutting, P.E. Michigan Department of Transportation."