1 FOUNDATION ELECTRIC POLES
PRESENTATION

2 Pole Foundation:- Foundation:
Foundation is required to support structure for transmission tower, lighting poles, and transformer erection etc in the field of electrical engineering.

3 For foundation of single wooden, concrete or steel pole, the pit is excavated to a required depth. Precast concrete poles or steel poles are inserted in the pit. Concrete mixture is poured layer by layer and is rammed every time. Mixture ratio is normally 1:2:4 of cement: san: stone.

4 Depth for foundation is generally 1/6 Th of the length of pole.
Typical depth of foundation pits are as follows:                                Pole size (meter):            12        15         18 Depth of foundation: 1.5     1.7          1.8        1.8          2 Depth for foundation is generally 1/6 Th of the length of pole.

5 Location of poles: Poles are located at least 1.5meter away from fire hydrant, underground cable trench, and 5meter away from road boarder and railway

6 Height of the pole in distribution system-
10M, 12M, 14M Span of the pole: Residential area: 30 to 50m Rural areas        : 50 to 60m

7 Foundation for 9 meter street pole :-
a)  Lean concrete ratio-1:3:6 (cement: sand: stone) Volume:  0.7X 0.7X0.15 = M3 Cement required per M3= 220kg Cement for above volume= kg

8 b)   Pedestal PCC at ratio 1:2:4
Outer dia =0.540M Inner dia= 0.15M Height = 1.5M Volume = π/4 x (D2-d2) x H              = π/4 x ( ) x 1.5              = 0.321M3 Cement required for ratio =320kg per M3 For M3 volume cement required = 320 x = kg

9 c)  Copping ratio 1:2:4 Outer dia =0.30M Inner dia= 0.14M Height = 0.3M Volume = 0.021M M3)               = 0.017M3 Total cement consumption per pole =a+b+c = = kg

10 Earth pit chamber: Plaster 1:4 cement =5.47kg/M3 Brick masonry 2x0.6x0.45x0.115=0.062M3                        2x0.3x0.45x0.115=0.031M3                                                                                    0.093M3 Cement consumption: 0.093x95=8.835kgs Plaster 4x0.3x0.45 = 0.54M3             4x0.6x0.1 = 0.24M3             2x0.3x0.15 = 0.09M3                                                                  1.05x5.47 = 5.749kg Total cement consumption   For one earth pit chamber = 14.58kg

11 FOUNDATION OF FEEDER PILLAR & TELEPHONE DB
1. Lean concrete: 1:3:6 Cement 0.11x 220kg/M3 2. Brick work = 2x1.0x0.5x0.075= 0.075M3                         2x0.5 x0.35x0.6= 0.21M3                              0.9 x0.5x0.3 = 0.135 Total                                          =0.42M3 Cement = 0.42x95kg/M3 (1:4 mortar)                  =39.9 kg 3. Plaster 12 mm thick 0.9 x0.3x2 = 0.54M2     Total  = 0.84M2 Cement: =0.84x547kg/100M2                 =4.6kg 4. Neat coat for area of 0.84M2 Total cement for one foundation = 70kg

12 Foundation of post top fixture
a)      Lean concrete ratio-1:3:6 (cement: sand: stone) Volume:  0.7X 0.7X0.15 = M3 Cement required per M3= 220kg Cement for above volume= kg b)      Pedestal PCC at ratio 1:2:4 0.5x0.5x0.1 = 0.25M3x320 =80kg Height = 1.5M Cement required for ratio =320kg per M3 c)      Copping ratio 1:2:4  0.3x0.3x0.045x320=14.40kg Total cement consumption per pole =a+b+c = = kg

13 THANK YOU THE END