Presentation is loading. Please wait.

Presentation is loading. Please wait.

Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Similar presentations


Presentation on theme: "Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:"— Presentation transcript:

1 Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by: Dr. C. Visvanathan Environmental Engineering Division Asian Institute of Technology Bangkok, Thailand Funded by: Carl Duisberg Gesellschaft (CDG) South East Asia Program Office Bangkok, Thailand Next

2 Visu PCW Training Crew Next

3 Visu CDG-SEAPO/EEP – AIT Training Workshop on IPPC 1- 4 May, 1995 Next

4 Visu Project Case Work Approach PCW Training Clips Integrated Waste Management A peek from the conference hall Trainers

5 Visu Multidisciplinary Participants 25 graduate students from various fields of study (AIT); –Environmental Engineering ( 5 students) –Energy Technology ( 5 students) –School of Management ( 5 students) –Industrial Engineering ( 5 students) –Human Settlement Division ( 5 students) Next

6 Visu Student Selection Criteria Different academic background (to represent an industry) Different Nationality Gender Balance Interview by the Funding Agency (CDG) Next

7 Visu Role of Trainer Serves more as; –Facilitator –Technical advisor –Catalyst of learning Rather than; –Lecturers –Story-tellers –Instructors Next

8 Visu Group 1Group 2Group 3Group 4 Presentations Brain Storming Trainer Evaluation & Consultancy Restructuring Q & A Trainer Evaluation & Consultancy Q & A Group 1Group 2Group 3Group 4 Baseline information Problem Statement Solution PCW Approach Back

9 Visu Integrated Waste Management Education Through Project Case Work Approach Rapid Industrialization Limited assimilative capacity of the receiving body Industrial Pollution Cradle–to–Grave Responsibility Introduction Next

10 Visu Integrated Approach Traditional Approach > EOP Waste Treatment Even, Pollution Prevention/ CP > No Total Elimination Integrated Approach: EOP + CP > Appropriate Solution In need of Integrated Approach Next

11 Visu Training of Integrated Approach Multidisciplinary approach Multidisciplinary inputs Real life situation/ should revolve near real life situation Working under pressure to solve a problem Working under a team: Handling Idea Generators/ Killer/ Implementers Next

12 Visu Case Study Management committee of Super Shine Thai Ltd. Faces an unrelenting threat from Pollution Control Department (PCD). Their industrial license will be cancelled within two months unless its wastewater meets Industrial Wastewater Discharge (IWD) discharge standards, i.e. ‘Electroplating shop has to be closed down within a period of two months’. Management committee in panic situation and calls for their senior staff consisting of;  Chief Executive Officer, Plant Manager, Environmental Manager, Chief Engineer, Veteran Electroplater, Utility and Energy Manager –They were given three days to solve the problem: This is the background of the presented PCW training Next

13 Visu List of Games Plant layout Game –The group with the best layout in terms of improved production efficiency and reduced environmental impact will be the winner. Degreasing Solvent Selection Game –The group with the best washing efficiency and the best washing efficiency will be the winner. Rinsing Game –The group carrying out the best quality rinsing with the least cost will be the winner. Next

14 Visu Sample of PCW Training Schedule (Day 2) Morning: Video on Electroplating Process Assessing Plant information (Collect available data and inspect site, Establish Priorities and problem area) Group Work Material Balance and Identifying IPPC Options (Material balance methodology, Generate options, Screen options, Balancing Pollution Prevention and Pollution Control) Video: Competitive edge Group Work Afternoon: Interim Presentation by each group on Material Balance Exercise Pollution Control and Material Recovery Technologies Video: Money Down the Drain Group work + Software Demonstration: Waste Reduction Advisory System by USEPA Management Issues in IPPC- Time and Motion Studies, Line Balancing Techniques etc. Group Work Post Dinner Session: Pollution Prevention Game 2 – Oily Washers Game Menu

15 Visu Problem statement and baseline information Q & A session after presentation Demonstration of electroplating mechanism PCW Training Clips Teamwork ‘ Different Strategy’ Back to AIT Final Presentations Lighter moments Intermediate Presentations Midnight Strategic Planning Prize distribution Menu

16 Visu Demonstrating the Electroplating Process Various Processes Involved Environmental Hazards Waste Minimization Options Common Problems Involved Dr. C. Visvanathan PCW Clips

17 Visu Teamwork Highly Educative and Enjoyable Group 1 Group 2 Learning by Doing ‘Different Strategy’ Click & Watch Next

18 Visu Learning by Doing ‘Different Strategy’ Pressure of time Near to real life scenario Group 3 Group 4 Click & Watch PCW Clips

19 Visu Baseline information about: Present scenarios Pollutions Preventions Cleaner Production EOP waste treatment PCW Clips

20 Visu Training of trainers Dr. C. Visvanathan Environmental Engineering Division Asian Institute of Technology Bangkok, Thailand Prof. P. Modak Indian Institute of Technology Mumbai, India Lead Trainers: Watch Menu

21 Visu Q & A Session After Presentation PCW Clips

22 Visu Final Presentations Click & Watch Next

23 Visu PCW Clips Final Presentations Click & Watch

24 Visu Midnight Strategic Planning PCW Clips

25 Visu Trainer: Prof. P. Modak Back

26 Visu A Peek From Conference Hall Menu PCW Training wishes an Idyllic and Serene Environment

27 Visu Lighter Moments PCW Clips

28 Visu Intermediate Presentations Next Click & Watch

29 Visu Intermediate Presentations PCW Clips Click & Watch

30 Visu Prize Distribution PCW Clips

31 Visu Training of Trainers Back One Dimensional Learning Universities to Three Dimensional Learning of PCW

32 Visu Trainer: Dr. C. Visvanathan Back

33 Visu Photo Session PCW Clips


Download ppt "Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:"

Similar presentations


Ads by Google