Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response Branch.

Similar presentations


Presentation on theme: "Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response Branch."— Presentation transcript:

1 Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response Branch

2 Rapid Maritime Response NRT6 NRT1 NRT2 NRT5 Galveston TX Panama City FL Jacksonville FL USCG RDC New London CT NOS Navigation Response Teams MIST 1 and AUV Silver Spring MD Bay Hydro II Solomons MD MIST 2 DRC – Mobile AL NRT4 San Francisco CA NRT3 – Temporarily offline Newport OR

3 Office of Coast Survey

4 Basic Stats Metrics MTS Ports surveyed – 11/13 Survey Project Instructions Issued – 17 Survey Projects Submitted – 12 Response Surveys Conducted – 12 DTONs submitted – 23? Days of Operations - 268

5 Office of Coast Survey NRT1 – Northern/Eastern GOM Region J910-NRT1-13 Panama City, FL –H12357 13 SNM - Completed –H12358 9 SNM – 82% –H12376 3 SNM – 15% Decommissioned TSWIG – Recommissioned old NRT4 boat. CARIS/HSTP on Edgetech 4125 integration Received new office trailer PS Froelich and ERT Mueller visits

6 Office of Coast Survey NRT2 – SE Atlantic Region S-G902-NRT2-13 St Augustine, FL –F00629 3 SNM - Submitted S-G901-NRT2-13 St Johns River, FL –H12407 3 SNM – Submitted –H12408 3 SNM – Submitted S-H918-NRT2-13 Ft Pierce, FL response –F00634 1 SNM – Submitted S-G929-NRT2-13 Mathews Bridge (Jax, FL) –D00188 1 SNM – Submitted S-H902-NRT2-14 Miami –F00640 – 1 SNM – Submitted * PS Herzog and PS Argento visits

7 Office of Coast Survey NRT3 – Pacific NW Region Warm lay-up status for 2013 season due to staffing and budget challenges Vessel located on MOC-P facility Office trailer to be relocated to DRC, Mobile, AL. Vehicles to be dispersed to other NRTs to replace ageing vehicles (F350 will stay w/ boat) May staff up as early as Q4 2014, but FY15 more likely

8 Office of Coast Survey NRT4 – Great Lakes/Western Gulf K414-NRT4-13 – Galveston Bay, TX –H12388 10 SNM – Complete –H12391 2 SNM – Complete Responded to Sunken Barge, MS River over 4 th of July Weekend Integrated POS/MV Ver5 2 Personnel new to the team in 2013

9 Office of Coast Survey NRT5 – NE Region (USCG RDC- New London CT) S-B903-NRT5-13 – New London CT –D00177 1 SNM - Completed S-B906-NRT5-13 – Liberty/Ellis Islands –F00630 1 SNM - Submitted S-B917-NRT5-13 – Sandy Hook/USCG ANT NY –D00178 1 SNM – Complete –D00179 1 SNM – Complete –D00180 1 SNM – Complete –D00181 1 SNM - Complete B370-NRT5-13 – E Long Island Sound –H12508 8 SNM – Complete F00598, F00619, F00620, F00623 prior backlog nearing completion

10 Office of Coast Survey NRT6 L430-NRT6-13 San Francisco –H12227 12 SNM – 15% S-L919-NRT6-13 Fernstream –D00182 1SNM - Submitted S-L922-NRT6-13 San Francisco Anchorage 9 –D00183 1 SNM - Submitted S-L926-NRT6-13 Mare Island, San Fran –D00186 1SNM - Submitted S-L927-NRT6-13 San Fran Pier 1 –F00635 1 SNM – Submitted S-L925_NRT6-14 Carquinez Strait –Recon led to a LNM broadcast and subsequent full survey request MBES TPU failed – using NRT3’s

11 Office of Coast Survey R/V Bay Hydro II E349-BH2-13 Central Chesapeake Bay –H12305 19 SNM – squared off at about 40% E924-BH2-13 Southern Chesapeake Bay –D00187 11 SNM – Complete –BathyRadar ground truth survey and CBBT tunnel inspection Kongsberg EM2040 Integration and Testing Novatel GPS testing MAST Other HSTP related testing PS Powdrell visit

12 Office of Coast Survey NRB Chief NC O-4/5 NRB Ops Manager ZP4 Hydrographer in Charge NRT1 ZP3 ZP2 ZT2/3 Hydrographer in Charge NRT2 ZP3 ZT3 ZT2/3 Hydrographer in Charge NRT3 ZP3 ZT3 Hydrographer in Charge NRT4 ZP3 ZP2 ERT Contractor Hydrographer in Charge NRT5 NC O-2 ZT3 ZT/23 Hydrographer in Charge NRT6 ZP3 ZP2 ZT2/3 Hydrographer in Charge BHII NC O-2 ZT3 ERT Contractor NRB Project Manager ZP4 NRB Technical Advisor ZP3 NSD Special Projects NC O-3 ERT Contractor Current vacancies awaiting OCS realignment ZT-4 will convert to ZP-3 when ZT-4 retires Hiring Cert received - positions not affected by OCS realignment NRB Staffing Plan

13 Office of Coast Survey NRB Vessel Recapitalization Plan USCG 25’ RB-S #25426 from GSAXcess Contract with CDI Marine for engineering support and modification design $500K for new vessel construction –April 4 procurement deadline –Market research and SOW ongoing –Committed to 1 new vessel in FY 14 (Goal = 2)

14 Office of Coast Survey NRT Mobile Asset Status Tracker Utilizing 4G LTE wireless broadband Desired sensor data tx ashore in real-time ESRI GeoEvent Processor –Automate metrics tracking (geofencing) –Dynamic floatplan with automated alerts –Common Operating Picture through ESRI Dashboard Capability for Raw survey data transmit ashore for Near-time processing


Download ppt "Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response Branch."