L'Ambiance Plaza Collapse Bridgeport, Connecticut April 23, 1987

Similar presentations


Presentation on theme: "L'Ambiance Plaza Collapse Bridgeport, Connecticut April 23, 1987"— Presentation transcript:

1 L'Ambiance Plaza Collapse Bridgeport, Connecticut April 23, 1987
Group 15 Stephen Conlon Brian Dowling Kevin Brandon Remi Monteiro

2 Introduction L'Ambiance Plaza was planned to be a sixteen-story building with thirteen apartment levels topping three parking levels. It consisted of two rectangular towers (The East Tower and The West Tower), 63 ft by 112 ft each, connected by an elevator.

3 Floor Plan

4 Construction Seven-inch thick post tensioned, concrete slabs and steel columns comprised its structural frame. The lift-slab method of construction was utilized in the construction of this building. The floor post tensioned slabs for all sixteen levels were constructed on the ground, one on top of the other. Then packages of two or three slabs were lifted into temporary position by a hydraulic lifting apparatus and held into place by steel wedges. Once the slabs were positioned correctly, they were permanently attached to the steel columns. Structural drawings specified that during construction the shear walls, which provided lateral resistance for the building, should be within 3 floors of the lifted slabs.

5 Collapse At the time of collapse, the building was a little more than halfway completed. The shear walls were about five levels below the lifted slabs. The workmen were tack welding wedges under the ninth, tenth, and eleventh floor package to temporarily hold them into position when they heard a loud metallic sound followed by rumbling. The entire structure collapsed, first the west tower and then the east tower in 5 seconds. 28 construction workers died in the collapse. An unusually prompt legal settlement prematurely ended all investigations of the collapse. Consequently, the exact cause of the collapse has never been established.

6 Why it collapsed? The building had a number of deficiencies; any one of which could have triggered the collapse. Each one of these following theories can explain where the first failure took place. Theory 1: The slabs’ lifting assembly failure caused the collapse. Theory 2: The instability of the wedges holding the twelfth floor and roof package caused the collapse. Theory 3: The improper design of the posttensioning tendons caused the collapse. Theory 4: Questionable weld details and substandard welds could have caused the collapse. Theory 5: The sensitivity of L’Ambiance Plaza to lateral displacement caused its collapse

7 Conclusion A two-judge panel mediated a universal settlement between 100 parties closing the L’Ambiance Plaza case. Twenty or more separate parties were found guilty of "widespread negligence, carelessness, sloppy practices, and complacency." Those injured and the families of those killed in the collapse received $30 million. Another $7.6 million was set aside to pay for all of the claims and counter claims between the designers and contractors of L’Ambiance Plaza.

8 Conclusion While buildings constructed by the lift-slab method are stable once they are completed, if great care is not taken during construction they can be dangerous. The following measures can be taken to insure lateral stability and safety during construction. During all stages of construction, temporary lateral bracing should be provided. Concrete punching shear and connections redundancies should be provided in the structure Cribbing (temporary posts which support the concrete slab until it is completely attached to the column) should be used. Sway bracing (cables which keep the stack of floors from shifting sideways) should be used. This was required, but not used in L’Ambiance Plaza. These measures could have saved the life of 28 construction workers.


Download ppt "L'Ambiance Plaza Collapse Bridgeport, Connecticut April 23, 1987"