BCP-Mumbai Mega Flood BCP-Mumbai Mega Flood Presented by NSDL
2
MUMBAI
4
Mumbai’s Destiny on July 26, 2005 Geographical Nature Of Mumbai Geographical Nature Of Mumbai Date with Destiny Date with Destiny
5
Shocking Memories of July 26, 2005
6
Cause for Rainfall on July 26, 2005 Highest Ever Rainfall Highest Ever Rainfall Cloudburst Cloudburst Maximum during last century Maximum during last century
7
Lifeline of Mumbai
8
Business Impact of July 26, 2005 Banking Transactions Banking Transactions ATM Network of several banks stopped functionning ATM Network of several banks stopped functionning Failure of the connectivity with their central systems located in Mumbai Failure of the connectivity with their central systems located in Mumbai
10
Stock Exchanges Bombay Stock Exchange National Stock Exchange Sensex touched all time high on July 27, 2005 Sensex touched all time high on July 27, 2005
11
NSDL & RAINS NSDL & Disaster NSDL & Disaster No stoppage because of floods No stoppage because of floods Continuous connectivity with the business partners all over India Continuous connectivity with the business partners all over India
12
NSDL Mission Statement - BCP Capability to restore operations on failure of any system/sub-system at NSDL/Participants/Network Capability to restore operations on failure of any system/sub-system at NSDL/Participants/Network Without loss of critical investor data within a reasonable time to ensure securities settlement Without loss of critical investor data within a reasonable time to ensure securities settlement
13
BCP & Disaster Recovery Near Site (Dual Logging) Near Site (Dual Logging) Fully operational Disaster Recovery Site Fully operational Disaster Recovery Site Online Data volumes replicated to DRS Online Data volumes replicated to DRS
14
BCP & Disaster Recovery Fireproof Back-up storage facility in all data centers Fireproof Back-up storage facility in all data centers BCP (Copy of Documents / Source codes etc.) BCP (Copy of Documents / Source codes etc.) Dual UPS with Battery Back-up, DG Set for Power failure Dual UPS with Battery Back-up, DG Set for Power failure
15
BCP & Disaster Recovery Fire / Smoke Detection and automatic protection Fire / Smoke Detection and automatic protection Redundancy for Air Conditioners Redundancy for Air Conditioners Readiness drills (Intra-day Shifting successful) Readiness drills (Intra-day Shifting successful)
16
Recovery on path
17
Recovery/BCP Common man on the roads to help Common man on the roads to help Government providing all the necessary support Government providing all the necessary support Mumbai Municipal Corporation officials on their toes through out the disaster Mumbai Municipal Corporation officials on their toes through out the disaster
18
Recovery/BCP Power supply, Rail transport, Airports started normal operations on the very next day Power supply, Rail transport, Airports started normal operations on the very next day Life back to normal within 24 hrs Life back to normal within 24 hrs Business as usual in the financial capital of India Business as usual in the financial capital of India
19
Recovery/BCP Inspite of huge individual losses Mumbai started buzzing within 48 hours of the disaster Inspite of huge individual losses Mumbai started buzzing within 48 hours of the disaster Financial Markets back on the track Financial Markets back on the track NSDL providing continuous support to all the business partners across Mumbai NSDL providing continuous support to all the business partners across Mumbai
20
Life Back to Normal
21
Thank You Disasters will come and go as we don’t have the ability to stop them but with our never say die attitude we shall overcome all the obstacles