KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Innovative recycled plastic based panels for building field WP3: PRODUCT DESIGN AND VALIDATION ACA.

Similar presentations


Presentation on theme: "KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Innovative recycled plastic based panels for building field WP3: PRODUCT DESIGN AND VALIDATION ACA."— Presentation transcript:

1 KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Innovative recycled plastic based panels for building field WP3: PRODUCT DESIGN AND VALIDATION ACA

2 KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick WP3: Product design and validation Work Package Description 1.Vertical solutions (ventilated façades, self-standing walls) The main objective of the WP3 is the design of different solutions and applications of the panels as environmentally friendly construction components. ACTIVITIES 2. Horizontal solutions (raised floors)

3 KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick TASKS 3.1. Design of vertical solutions 3.2. Validation of vertical solutions WP3: Product design and validation Work package no:3Start date:MONTH 12End date:MONTH 36 Work package title PRODUCT DESIGN AND VALIDATION Partner Number123456 Partner Shortname CETMATREPANDORAMOTULABACCIONAACA Task Participation Technical support 3.1 3.2 3.1 3.3 3.2 3.4 3.3 3.4 3.5 Work Package Description TRE ACCIONA 3.3. Design of horizontal solutions 3.4. Validation of horizontal solutions 3.5. Technical-commercial schedules

4 KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick WP3: Product design and validation Task 3.1 “Design of vertical solutions” Task 3.3 “Design of horizontal solutions” Tasks Description Defining the optimal size of the panels for different applications Optimization of panel properties T 2.2 Product Design T 3.1, T 3.3 Production of panels T 3.2, T 3.4 Validation T 3.2, T 3.4 TRE ACCIONA WP2WP3 (TRE) TRE ACCIONA MOTULAB

5 KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Tasks Description WP3: Product design and validation Task 3.2 “Validation of vertical solutions” Task 3.4 “Validation of horizontal solutions” Testing the mechanical and thermal/fire properties of full scale elements Mechanical Properties Thermal and Fire properties Validation T 3.2, T 3.4 Manufacture and Test of full scale Elements for different solutions TRE ACCIONA WP3 WP6 Dissemination Activities (ACA)

6 KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick WP3: Product design and validation Tasks Description Task 3.5 “Technical-commercial schedules” Description of applications, technical data, environmental and economic aspects, etc. Test results T 3.2, T 3.4 Technical-commercial Schedules T 3.5 ACCIONA WP3 (TRE, ACCIONA) Environmental Compatibility analysis WP4 (CETMA, TRE, MOTULAB)

7 KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Steps: Design 1.Design of the panels: optimal dimensions for different applications. Production 2.Production of the panels. Manufacture 3.Manufacture of full scale elements. Validation 4.Validation: testing the mechanical and thermal/fire properties, depending on the application. Evaluation 5.Evaluation of the results. Analysis of the advantages and disadvantages of the different designs to select the best option for each application. Description 6.Description of technical-commercial schedules for each product. WP3: Product design and validation Methodology

8 KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick WP3 Product design and validation TASK 2011201220132014 IIIIVIIIIIIIVIIIIIIIVIII TASK 3.1 D 3.1 TASK 3.2 D 3.2.1 D 3.2.2 TASK 3.3 D 3.3 TASK 3.4 D 3.4.1 D 3.4.2 TASK 3.5D 3.5 Planning DELIVERABLEDELIVERABLE NAME DELIVERY DATE PARTNERS INVOLVED D 3.1Design of vertical solutionsMonth 18TRE D 3.2.1 D 3.2.2 Validation of vertical solutions Full scale example of vertical solution for demonstration purposes Month 30 Month 36TRE D 3.3Design of horizontal solutionsMonth 18ACCIONA D 3.4.1 D 3.4.2 Validation of horizontal solutions Full scale example of horizontal solution for demonstration purposes Month 30 Month 36ACCIONA D 3.5Technical-commercial schedulesMonth 36ACCIONA

9 KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Innovative recycled plastic based panels for building field WP3: PRODUCT DESIGN AND VALIDATION ACA


Download ppt "KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Innovative recycled plastic based panels for building field WP3: PRODUCT DESIGN AND VALIDATION ACA."

Similar presentations


Ads by Google