1 Tank plumbing 250 Telone 1/2013

2 Dip tube connection on Left Nitrogen Connection on Right

3 Telone dip tube valves Top valve Main shut off ¾” 3 way valve controls product direction. In this position product leaves tank and goes to application equipment. Valve turned 90 degrees line is now in position to fill tank ½” 3 way valve allows product to flow from tank to application equipment. When turned 90 degrees nitrogen line can be coupled to purge system for maintenance. Also from this connection flushing material can be used for preparing machine for storage.

4 Telone fill stand ¾ male brass tip ¾ X 4” stainless nipple ¾” brass coupler ¾” brass king nipple

5 ¾ npt X ½ barb king nipple 2 pcs ¾” X 1 ¼” Poly bushing Poly strainer Blue filter ¾” X 4” stainless nipple

6 Fill line ¾” Kuritec Hose 8’ long from male fill quick coupler to 3way valve to fill. tank