Presentation is loading. Please wait.

Presentation is loading. Please wait.

Time to Market Time to Volume Time to Money M M MODULE M M MOVE S S SERVICE Confidential Your Best Partner for SEMI/FPD Equipment Contract Manufacturing.

Similar presentations


Presentation on theme: "Time to Market Time to Volume Time to Money M M MODULE M M MOVE S S SERVICE Confidential Your Best Partner for SEMI/FPD Equipment Contract Manufacturing."— Presentation transcript:

1 Time to Market Time to Volume Time to Money M M MODULE M M MOVE S S SERVICE Confidential Your Best Partner for SEMI/FPD Equipment Contract Manufacturing Service C C COMPONENT 1 Print Date: 26-Oct-15foxsemicon integrated technology Inc. Engineering Problem Form Instruction (EPF)

2 Presenter: CONFIDENTIAL Quality Assurance EPF System – Home Page Open “Internet Explorer” and type http://www.foxsemicon.com.tw in Address field.http://www.foxsemicon.com.tw Choose “ Supplier System “

3 Presenter: CONFIDENTIAL Quality Assurance Engineering Problem Form (EPF)- Operation Manual Engineering Problem Form Choose EPF System

4 Presenter: CONFIDENTIAL Quality Assurance Engineering Problem Form (EPF)- Login Page Input Supplier ID &Password Choose language type

5 Presenter: CONFIDENTIAL Quality Assurance Engineering Problem Form (EPF)- Query Form List You can download manual from here EPF list: Click the form no. you can check the FITI’s response Add a EPF New Request

6 Presenter: CONFIDENTIAL Quality Assurance Input the data in these boxes Choose EPF Problem type Engineering Problem Form (EPF)- Add EPF Form

7 Presenter: CONFIDENTIAL Quality Assurance Engineering Problem Form (EPF)- Add SPS Form Problem Description Please zip all your files andupload one file at one time. Ifthe zip file is bigger than 5Mb,please re-launch a new SPS. Input the data in these boxes

8 Presenter: CONFIDENTIAL Quality Assurance Preview/Submit/Clear Data Engineering Problem Form (EPF)-Preview/Submit/Clear Data When fill out the form, you can choose preview, submit,or erase the data

9 Presenter: CONFIDENTIAL Quality Assurance Engineering Problem Form (EPF)-Preview EPF Form

10 Presenter: CONFIDENTIAL Quality Assurance Engineering Problem Form (EPF)- Complete adding new Form

11 Presenter: CONFIDENTIAL Quality Assurance EPF Problem Type EPF Problem Type List 項目問題類型項目問題類型 1BOM/Drawing Error15Color difference for surface treatment 2Dimensional Error16Burrs allowed problem 3Incorrect Wire List17Warping Problem 4Insufficient documentation18The problem of power input/output voltage 5Non-manufacturability19The problem of power input/output current 6The drawing notes description is unclear 20Watts by Power output 7The problem of procedure or spec document 21groups quantity by power output cable 8The special process problem22The variation for Voltage(V) and Current(I) 9Silkscreen/Label problem23Current leakage problem 10Testing problem24Stability of color temperature 11Tolerance Problem25Viewing angle of light 12Welding Problem26Far Field pattern 13Machinery Material27Others 14Machinery plane28

12 Presenter: CONFIDENTIAL Quality Assurance Engineering Problem Form (EPF)- Query Form List EPF list: Click the form no. you can check the FITI’s response

13 Presenter: CONFIDENTIAL Quality Assurance Engineering Problem Form (EPF)- Query Form List Foxsemicon engineer’s name (the e-mail add of this engineer would be testxxx@foxsemicon.com.tw) Foxsemicon’s reply would be shown here


Download ppt "Time to Market Time to Volume Time to Money M M MODULE M M MOVE S S SERVICE Confidential Your Best Partner for SEMI/FPD Equipment Contract Manufacturing."

Similar presentations


Ads by Google