Presentation is loading. Please wait.

Presentation is loading. Please wait.

A1 Agenda RESULTS Training Planning Planning MOF Information Management Group 2005 Module 7 – RESULTS Generating Reports.

Similar presentations


Presentation on theme: "A1 Agenda RESULTS Training Planning Planning MOF Information Management Group 2005 Module 7 – RESULTS Generating Reports."— Presentation transcript:

1 A1 Agenda RESULTS Training Planning Planning MOF Information Management Group 2005 Module 7 – RESULTS Generating Reports

2 A2 Agenda RESULTS Training Planning What we will cover: Overview presentation Show and tell Running CSV Reports Linking via MSAccess Run sample database Questions and Answers Agenda

3 A3 Agenda RESULTS Training Planning Learning Objectives Overview key processes required to produce a meaningful plan Become familiar basic planning function that exists in RESULTS Become familiar with the reports that will assist in the planning process

4 A4 Agenda RESULTS Training Planning Potential Planning Types Non-replaceable forest licence – DM has responsibility to meet basic silviculture activities using the Forest Stand Management Fund account Small scale salvage blocks for which there are basic silviculture obligations (Forestry Licence to Cut – “B07”) Waived obligations under FRPA s.108 Forest for Tomorrow – silviculture opportunities

5 A5 Agenda RESULTS Training Planning Identification methods Responsibility/OpportunityKey Identification Non-replaceable Opening Category FTFSM or FTLEVY forest licence Forest Stand Mgmt Fund Small scale salvage blocks No Opening Category created yet Forestry Licence to Cut File Type Code = B07 Tenure type code located at Tenure level of FTA Waived obligations No Opening Category created yet under FRPA s.108 Forest For TomorrowNew burns as Opening Category NDFS Disturbance Code of ‘B’ Scheduled Treatment as FTM or FTL

6 A6 Agenda RESULTS Training Planning Conceptual flow New or Existing Openings/ SUs Milestones Harvest Regen Due FG Due contain Planned Activities require adjust/update Proposed Plan - meets biological needs - meets obligations meets

7 A7 Agenda RESULTS Training Planning Process overview - NRFL 1. Identify areas of priority  Recently logged areas  Regeneration & FG Due within planning horizon (highest priority placed in past due not declared; due in next fiscal year) 2. Ensure appropriate activities are scheduled 3.Ensure non-priority planned activities are adjusted or removed from planning horizon 4.Run reports to generate total of all scheduled activities within the planning horizon 5. Summarise areas and apply cost information to create budget request

8 A8 Agenda RESULTS Training Planning Process overview - FFT 1. Identify areas of priority  Locate potential stands non-basic that have NSR or impeded  Locate non-basic stands that had good silv opportunities identified via field surveys 2. If there are appropriate activities that are not already scheduled but are good opportunities, then go into RESULTS to schedule 3.Ensure non-priority planned activities are date adjusted or removed from planning horizon 4.Run reports to generate total of all scheduled activities within the planning horizon 5. Summarise areas and apply cost information to create budget request

9 A9 Agenda RESULTS Training Planning Updating RESULTS Openings ProcessCapability of On-line Authority* EZiLink/ Data Service Providers Opening Creation; Establish SU - Amendment RequestU, D Amendment Approval/Rejection A Basic PlanningU, D, A Completed ActivitiesU, D, A Forest CoverU, A, D Milestone DeclarationD, A Map Submission (opening, SU, forest cover) - * “U”-update; “D”-declaration; “A”-approval

10 A10 Agenda RESULTS Training Planning Three Approaches 1.Quasi-Manual Method Run available.pdf reports to identify milestone due dates (for NRFL), go back to RESULTS and schedule. Labour intensive. Easy to omit information. 2. Semi-electronic Run RDD-series CSV reports and download into Excel to identify areas and cross-reference as needed. Can see sort and priorize information as needed. But still requires lots of work to cross- compare. 3. Integrated (this is the preferred method) Run RDD-series and download into MSAccess database. Integrated information easy to sort, ask questions (queries), identify missing information. Easy to reapply new extracts/updates.

11 A11 Agenda RESULTS Training Planning Run reports to determine when RG and FG Due TF08 Can be used to find where there has been logged, but not yet in RESULTS yet. CRS – Running Reports - NRFL CRS – Running Reports - NRFL

12 A12 Agenda RESULTS Training Planning CRS – Running Reports - FFT CRS – Running Reports - FFT Run reports to determine planned RDD006 activities or identification of NSR areas or impeded areas RDD008

13 A13 Agenda RESULTS Training Planning Use information to schedule Format available:.pdf or CSV For CSV Use in Excel or Access Use Reports to Schedule Treatment Requirements

14 A14 Agenda RESULTS Training Planning RESULTS - Activity RESULTS - Activity

15 A15 Agenda RESULTS Training Planning Add information then hit Save Date is not mandatory, but is necessary for planning purposes! RESULTS – Creating Plan Activity RESULTS – Creating Plan Activity

16 A16 Agenda RESULTS Training Planning Integrated Method The following remaining portion of the training is based on the demonstrated an already built MSAccess to show you how much easier this method can be.

17 A17 Agenda RESULTS Training Planning Key Data Download Reports Key Reports RDD001 RDD006 RDD008 RDD011 To build relational database

18 A18 Agenda RESULTS Training Planning CRS – Mapview Spatial Linkage

19 A19 Agenda RESULTS Training Planning Upcoming Mapview spatial queries Mapview spatial queries: -Opening level -Activity -Planting -Forest cover

20 A20 Agenda RESULTS Training Planning Resources Resources RESULTS Main Website – key documents http://www.for.gov.bc.ca/his/results/ RESULTS Self-Study Workbook http://www.for.gov.bc.ca/his/results/ReportWorkbook.pdf RESULTS Generating Reports - Advanced Learnlinc Handout located at: ftp://ftp.for.gov.bc.ca/HIS/external/!publish/OnLineClassroom/Results/

21 A21 Agenda RESULTS Training Planning Check: http://www.learningestore.com/bcmof More Training Sessions RESULTS OVERVIEW OBLIGATION REPORTING (SUBMISSIONS) AMENDMENTS, UPDATES, and APPROVED VARIATIONS STOCKING STANDARDS RESULTS and MAPVIEW GENERATING REPORTS - BASIC GENERATING REPORTS - Advanced GENERATING REPORTS – PLANNING ASSISTANCE


Download ppt "A1 Agenda RESULTS Training Planning Planning MOF Information Management Group 2005 Module 7 – RESULTS Generating Reports."

Similar presentations


Ads by Google