1 GUJARAT: HOUSING FOR ALL GUJARAT INITIATIVES 1

2 KEY INITIATIVES  CAMPAIGN FOR HOMESTEADS  EARTHQUAKE RESISTANT HOUSING DESIGN  INTEGRATED PLANNING OF CENTRAL & STATE SCHEMES TO ENSURE COVERAGE  CAMPAIGN FOR DRI LOANS  HOUSE ALLOTMENT IN NAME OF WOMEN, ENSURING NAME IN RECORD OF RIGHTS 2

3  SURVEY OF RURAL HOUSEHOLDS 2002 INDICATED 8.08 LAKH FAMILIES REQUIRED HOUSING  PERMANENT WAITLIST BASED ON SURVEY COMPRISED 2.94 LAKH HOUSELESS & 5.15 LAKH HAVING KUTCHA HOUSES  HOMESTEAD PLOTS WERE ALLOCATED PROGRESSIVELY  2010 STATE GOLDEN JUBILEE YEAR RESOLUTION THAT NO BPL FAMILY SHOULD REMAIN SHELTERLESS BY DECEMBER 2010 CAMPAIGN FOR HOMESTEADS 3

4  OUT OF 2.94 LAKH HOUSELESS FAMILIES 2.03 LAKH DID NOT HAVE HOUSE PLOTS  FAMILIES WERE SCATTERED IN OVER 3500 VILLAGES  MULTIPLICITY OF AGENCIES PROPOSALS FOR VILLAGE SITE EXTENSIONS BY PANCHAYATS ASSIGNATION OF GOVT LAND FOR VILLAGE SITES BY REVENUE DEPT. SANCTION OF INDIVIDUAL HOUSE SITES BY PANCHAYAT LAND COMMITTEE 4 CAMPAIGN FOR HOMESTEADS: ISSUES

5  JOINT LAUNCH BY MINISTERS RDD & REVENUE  TIME BOUND ACTION PLAN TO COLLECTORS & DDO’S  WEEKLY STATE LEVEL REVIEW BY PS REVENUE, PANCHAYAT  DISTRICT LEVEL DAILY MONITORING BY COLLR & DDO PROPOSALS SUBMITTED PROPOSALS SANCTIONED LAND MEASUREMENT AND TRANSFER TO PRIS PRIVATE SURVEYORS AND ENGINEERS FOR MEASUREMENT AND LAYOUT 5 CAMPAIGN FOR HOMESTEADS

6  TALUKA LEVEL ACTION PLAN VERIFICATION OF BENEFICIARIES VILLAGE WISE IDENTIFICATION OF SUITABLE GOVT LAND IN VILLAGES MIDDLE LEVEL TALUKA EMPLOYEE TO SUPPORT GP SECRETARY EACH TALUKA PLACED UNDER OVERALL CHARGE OF CLASS- I OFFICER CAMPAIGN FOR HOMESTEADS 6

7 7 YEARNo. of plots allotted 2006-0723923 2007-0851573 2008-0958561 2009-1061400 2010- 113480 Total198937

8 ENSURING HOUSES ON ALL HOMESTEADS  AUGUST 2009, LAUNCH OF HOMESTEAD SCHEME BY GOI  NOVEMBER 2009 PROPOSAL FOR 33154 INCENTIVE AWAS SUBMITTED BY GOG AGAINST HOMESTEADS ALLOTTED AFTER AUGUST 2009  SANCTION RECEIVED MARCH 2010  JUNE 2010 PROPOSAL FOR 18342 INCENTIVE AWAS AGAINST HOMESTEADS ALLOTTED UPTO MARCH 2010  TOTAL 51496 AWAS WITH TOTAL ALLOCATION OF RS.231.73 CRORES RECEIVED AS INCENTIVE 8 CAMPAIGN FOR HOMESTEADS

9 Seismic Zoning Map of Gujarat LARGE AREAS OF GUJARAT ARE IN SEISMIC ZONE 4 AND 5 9 EARTHQUAKE RESISTANT AWAS

10  POST EARTHQUAKE, 2001 NATIONAL BUILDING CODES FOR THE COUNTRY REVISED  GUJARAT STATE DISASTER MANAGEMENT AUTHORITY & DEPTT. OF R & B PREPARED EARTHQUAKE RESISTANT DESIGN AND GUIDELINES FOR BPL HOUSING SCHEMES  MASS TRAINING FOR EARTHQUAKE RESISTANT CONSTRUCTION TO MASONS, ENGINEERS & BUILDERS ACROSS THE STATE 10 EARTHQUAKE RESISTANT AWAS

11 10 cm RCC COPPING BAND AT PLINTH & LINTEL LEVEL COVERING ALL WALLS 11 THE MS BAR IS REQU AFTER EVERY 4 LAYERS OF BRICK MASONRY  FOUNDATION DEPTH MINIMUM 90 cm.  75 cm WIDE BRICKBAT CONCRETE AT BOTTOM OF FOUNDATION  THICKNESS OF WALL AT THE BOTTOM OF FOUNDATION 45 cm & REDUCED IN TWO STEPS TO 23 cm EARTHQUAKE RESISTANT DESIGN

12 12 WINDOWS AND DOORS NOT PLACED AT CORNERS. MINIMUM DISTANCE FROM ANY JUNCTION 30 – 60 C.M. THE MS BAR IS REQU AFTER EVERY 4 LAYERS OF BRICK MASONRY Window Long Bar 'U' shaped reinforce ment Min. 8mm ø 90 cm Masonry 'T' section details of Reinforcement at sill level in wall 1:3 Cement Concrete Mortar Mortar = Mixture of Cement & Sand  Steel bars AT WALL JUNCTIONS PLACED VERTICALLY FROM COPPING BAND AT PLINTH LEVEL UP TO SLAB LEVEL IN BETWEEN LAYERS OF BRICK MASONRY AT INTERVAL OF 4 LAYERS AT THE BOTTOM OF WINDOWS 90 C.M. LONG U SHAPED STEEL BARS EARTHQUAKE RESISTANT DESIGN

13 DETAILS OF EARTHQUAKE RESISTANT DESIGN AND COSTING FOR ALL 3 SEISMIC ZONES Seismic ZoneCost of Construction Rs Zone - 3 82107 Zone - 4 84760 Zone - 5 85884 13

14 14 RECOMMENDATION  DEVELOPMENT OF LOW COST, REGION SPECIFIC DESIGNS FOR NATURAL CALAMITY RESISTANT HOUSES BY CENTRAL AGENCIES  DIFFERENTIAL FUNDING OF IAY HOUSING IN EARTHQUAKE PRONE AREA COMMENSURATE WITH NATIONAL BUILDING CODE  MANDATING NATIONALISED BANKS TO PROVIDE DRI ASSISTANCE EQUIVALENT TO FUNDING GAP TO ALL BPL HOUSING BENEFICIARIES EARTHQUAKE RESISTANT AWAS

15 INTEGRATED PLANNING OF CENTRAL & STATE SCHEMES  UPTIL 2009-10 GoG HAD TOTAL OF 11 HOUSING SCHEMES FOR POOR UNDER IMPLEMENTATION  SEPARATE ELIGIBILITY CRITIERIA AND DIVERGENT FUNDING PATTERNS  IN 2009-10 ALL HOUSING SCHEMES CLUBBED UNDER COMMON GR ALL SCHEMES ALIGNED WITH IAY FUNDING ASSISTANCE ELIGIBLITY BASED ON BPL LIST COMMON HOUSING DESIGN INFRASTRUCTURE SUPPORT FOR ALL CLUSTERS OF 10 AND MORE HOUSES 15

16 YearHouses Constructed 2002-0327,053 2003-0431,199 2004-0533,654 2005-0665,602 2006-0765,195 2007-0896,258 2008-091,06,413 2009-101,66,760 2010-111,77,586 Total7,69,720 Houses Constructed under IAY 16

17 SR. No SCHEME HOUSES BUILT DURING 2006- 07 TO 2009-10 TARGET IN 2010-11 TOTAL AWAS 1 INDIRA AWAS YOJANA 434626177586612212 STATE SCHEMES 2 SARDAR AWAS YOJANA 10428628855133141 3 PANDIT DINDAYAL UPADHDHYAY AWAS YOJANA 8431216000100312 4 Dr. AMBEDKAR AWAS YOJANA (S.C.) 38548NA38548 5 INDIVIDUAL AWAS YOJANA FOR S.T. 9813406513878 6 AWAS FOR PRIMITIVE TRIBES 19871782165 7 HALPATI GRIH NIRMAN YOJANA 544128672 TOTAL…… 674116226812900928 17 TOTAL HOUSES BUILT DURING 2006-07 TO 2010-11

18  TILL 2009-10, NEGLIGIBLE ACHIEVEMENT (511)  ISSUE FLAGGED AT SLBC TO ACHIEVE GOAL SET BY RBI AND GOI  SLBC APPROVED SIMPLE COMMON APPLICATION FORM FOR ALL BANKS  IAY SANCTION ORDER ISSUED WITH DRI LOAN APPLICATION FORM AND EARTHQUAKE RESISTANT DESIGNS TO ALL BENEFICIARIES  ASSISTANCE OF DRDA STAFF TO FILL UP DRI FORMS  BRANCH WISE REVIEW IN TLCC / BLBC & BANK WISE REVIEW IN DLCC / SLBC  AIM TO SPONSOR & SANCTION 1 LAKH APPLICATIONS IN 2010-11 CAMPAIGN FOR DRI LOAN 18

19 RECOMMENDATION:  DRI SCHEME EXTENDED ONLY TO IAY BENEFICIARIES STATE GOVERNMENTS HAVE HOUSING SCHEMES FOR RURAL POOR.ALL SUCH SCHEMES MUST HAVE ACCESS TO DRI LOANS  QUANTUM OF IAY ASSISTANCE PLUS LOAN OF RS 20000 INADEQUATE FOR CONSTRUCTION AS PER NBC  GOI GUIDELINES TO BANKS ON DRI SHOULD BE MANDATORY NOT ADVISORY CAMPAIGN FOR DRI LOAN 19

20  GoG MANDATES ALLOTMENT OF HOUSES UNDER ALL GOVERNMENT HOUSING SCHEMES IN NAME OF WOMEN  UNDER IAY - SANCTION & PAYMENTS IN THE NAME OF WOMEN.ACHIEVEMENT DURING 2009-10 (Women 82.57 %) (Joint 15.48%), ( Men 1.95%)  ENSURED NAME OF WOMAN ALSO ENTERED IN LAND TITLE RECORDS AND PANCHAYAT RECORDS ALLOTMENT TO WOMEN 20

21 Formulating Action Plan for 2011-12 to 2016-17 21

22 DISTRICT WISE ESTIMATE OF UNMET DEMAND Sr. No. Name of District No. of kutcha house without plot On verification kutcha house 1 AHMEDABAD 420502582 2 AMRELI 14503403 3 ANAND 4313528353 4 BANAS KANTHA 4404122306 5 BHARUCH 368639552 6 BHAVNAGAR 1246876 7 DANG 7182 8 DAHOD 15015 9 GANDHINAGAR 62380 10 JAMNAGAR 90610 11 JUNAGADH 11678 12 KHEDA 289540 13 KUTCHCHH 129470 14 MEHSANA 229151161 15NARMADA23679 16NAVSARI70970 17PANCH MAHALS1974643833 18PATAN152754784 19PORBANDAR2532 20RAJKOT16384 21SABAR KANTHA2082925918 22SURAT26141 23SURENDRANAGAR339033707 24VADODARA38711 25VALSAD20673 TOTAL532020142675 22

23 FORMULATING ACTION PLAN 2011-12 TO 2016-17  NEW HOUSEHOLD SURVEY DUE 2011, LIKELY AVAILABILITY 2012  CENSUS 2011 HOUSEHOLD SURVEY ALREADY AVAILABLE THROUGHOUT COUNTRY - SHOULD FORM BASIS FOR ACTION PLAN CENSUS DATA TO BE OBTAINED BY NOVEMBER 2010 REQUIREMENT FOR HOUSING IN STATES ESTIMATED BY DECEMBER 2010 DECEMBER & JANUARY PREPARATION OF WAITLIST FOR HOUSING ASSISTANCE ACTION PLAN FOR YEARWISE ALLOCATION OF IAY HOUSES BY JANUARY 2011 23

24 ISSUES TO BE CONSIDERED  IAY MUST BE DE-COUPLED FROM BPL LIST  ELIGIBILITY CRITERIA AND QUANTUM OF ASSISTANCE BY GOI REQUIRES TO BE REVIEWED. PRESENT QUANTUM OF ASSISTANCE FOR UNIT SIZE OF 20 SQ. MTS. VERY LOW.  SIZE OF DWELLING UNIT NEEDS TO BE ENHANCED TO 30 SQ. MTS. FOR BETTER HEALTH, HYGIENE & DIFFERENTIAL CULTURAL TRADITIONS  PROVIDING DRI LOAN MUST BECOME MANDATORY FOR BANKS.  AS THE SCOPE OF HOUSING IS BEING ENLARGED, ASSISTANCE TO STATES FOR ADMINISTRATIVE SET UP REQUIRES TO BE ADDRESSED 24

25 Thank You 25