1 Facilities Modernization Program Funded by Measure B Project Report April 19, 2010

2 PROJECT PROGRESS REPORT College Center for the Arts Project Team: Architect: John Sergio Fisher & Associates Construction Manager: Parsons Brinckerhoff Contractor: C. Overaa & Co Project Update: The exterior siding, stucco and windows are 99% complete. The interior of the building is 97% complete in segment "B" which is the facility offices and the rehearsal rooms. The Black Box Theater and the Main Auditorium infrastructure elements are continuing and will be completed this month. The final concrete walk ways and ramp around the building and the Amphitheater are 98% complete. The total project is 95% complete. Occupancy Fall Semester 2010 LAS POSITAS COLLEGE April 19, 2010

3 PROJECT PROGRESS REPORT Child Development Center Project Team: Architect: Beverly Prior Architects Construction Manager: Parsons Brinckerhoff Contractor: Lathrop Construction Associates Project Update: Exterior plaster complete on all buildings. Installation of sheetrock continues in building B and has started in building C. Rough grading for the OLEs has begun. OccupancySpring 2011 LAS POSITAS COLLEGE April 19, 2010

4 PROJECT PROGRESS REPORT PE Phase III (Outside Loop Road) Project Team: Architect: WLC Architects / Carducci Landscape Architects Construction Manager: Parsons Brinckerhoff Contractor: Lathrop Construction Project Update: Underground & electrical utilities are continuing. Occupancy: 10/2010 LAS POSITAS COLLEGE April 19, 2010

5 PROJECT PROGRESS REPORT Collier Creek Storm Water Outfall Project Team: Engineer of Record: Sandis Construction Manager: Parsons Brinckerhoff Contractor: Lathrop Construction Project Update: Storm Drain and Retaining wall installation is complete. Backfill at retaining wall is on going. Occupancy: 04/2010 LAS POSITAS COLLEGE April 19, 2010

6 PROJECT PROGRESS REPORT Science Building, Phase II Project Team: Architect: Kwan Hemni Construction Manager: Parsons Brinckerhoff Contractor: TBD Project Update: Added space for 4 classrooms on second floor. Site layout and floor plan finalized. Projected submittal to DSA in March 2010. Occupancy: Fall 2012 LAS POSITAS COLLEGE April 19, 2010

7 PROJECT PROGRESS REPORT Student Services & Central Administration Project Team: Architect: Steinberg Architects Construction Manager: Parsons Brinckerhoff Contractor: TBD Project Update: 60% design documents were submitted in April DSA submittal planned for August 2010, This project will participate in the new DSA Collaborative Process. Occupancy: Fall 2012 LAS POSITAS COLLEGE April 19, 2010

8 PROJECT PROGRESS REPORT Campus Boulevard Phase I-III Project Team: Architect: RHAA Construction Manager: Parsons Brinckerhoff Contractor: TBD Project Update: Design stopped to coordinate with SSA design concepts. Occupancy: Fall 2011 LAS POSITAS COLLEGE April 19, 2010