André van Es 2 nd SKADS Workshop 10-11 October 2007 Review on Deliverables and forward look André van Es.

Similar presentations


Presentation on theme: "André van Es 2 nd SKADS Workshop 10-11 October 2007 Review on Deliverables and forward look André van Es."— Presentation transcript:

1 André van Es 2 nd SKADS Workshop 10-11 October 2007 Review on Deliverables and forward look André van Es

2 André van Es 2 nd SKADS Workshop 10-11 October 2007 Review of deliverables Three levels of deliverables: Level 3: Deliverable at Tasks Level 2: Deliverable at Design Study Level 1: Deliverable at Project Level 0: Deliverable at Board Level We present progress in terms of the Level 0 deliverables

3 André van Es 2 nd SKADS Workshop 10-11 October 2007 DS-1ASTRON University of Manchester Observatoire de Paris DS-2 Rijks Universiteit Groningen ASTRONINAF-IRAMPIfR Universidad de Valencia CSIROSwinburne Leiden Observatory ChalmersOxford University of Manchester Observatoire de Paris Cambridge University of Melbourne Natal University PRAO-LPI University of Leeds University of Glasgow University of Adelaide DS-3 University of Cambridge ASTRON University of Manchester CSIROINAF-IRA University of Oxford Cambridge University Observatoire de Paris National Research Foundation DS-4 University of Manchester ASTRON Observatoire de Paris INAF-IRAFG-IGN University of Oxford CSIRO National Research Council University of Cambridge University of Orléans CNRSOMMIR DS-5ASTRON University of Manchester Observatoire de Paris JIVEINAF-IRAMPIfR Oxford University CSIRO National Research Foundation UMK University of Cambridge OMMIC DS-6INAF-IRAASTRONJIVECSIRO Univ. Sydney DS-7: University of Manchester, Observatoire de Paris

4 André van Es 2 nd SKADS Workshop 10-11 October 2007 Review on deliverables: DS-1

5 André van Es 2 nd SKADS Workshop 10-11 October 2007

6 André van Es 2 nd SKADS Workshop 10-11 October 2007 Review on deliverables: DS-2

7 André van Es 2 nd SKADS Workshop 10-11 October 2007 A Report and Proceedings...

8 André van Es 2 nd SKADS Workshop 10-11 October 2007 Review on deliverables: DS-3

9 André van Es 2 nd SKADS Workshop 10-11 October 2007 SKADS Design & Costing Paper (SKA Memo 93)

10 André van Es 2 nd SKADS Workshop 10-11 October 2007 Review on deliverables: DS-4 Nominal Completion Date Planned Completion Milestone DS4 1 30-dec-06 done SiGe band pass filter using PIC technology prototype DS4 2 30-dec-07 31-dec-08 ADC performance evaluation DS4 3 1-jul-07 1-jul-08 Hybrid LNA first devices DS4 4 1-jul-06 1-jul-08 Inventory of RFI mitigation techniques and applicability to SKA DS4 5 1-jul-07 1-jul-08 Evaluation of impact of moving interference sources on SKA DS4 6 31-okt-07 1-mrt-08 Characterised antenna element DS4 7 1-mrt-08 1-jul-08 antenna element with integrated MMIC prototype DS4 8 1-jul-07 1-mrt-08 Simulated Digital beamformer for 2-PAD DS4 9 30-dec-06 done Prototype low cost SiGe analogue beamformer DS4 10 29-dec-08 2-feb-09 Prototype complete 2-PAD digital tile DS4 11 30-jun-09 30-jun-09 Final reports on semiconductor technologies, RFI mitigation strategies, antenna element design, digital beamformer design 2-PAD performance (T1-T6)

11 André van Es 2 nd SKADS Workshop 10-11 October 2007 Prototype of Low Cost SiGe Beamformer

12 André van Es 2 nd SKADS Workshop 10-11 October 2007 Review on deliverables: DS-5

13 André van Es 2 nd SKADS Workshop 10-11 October 2007 EMBRACE 10 tile prototype

14 André van Es 2 nd SKADS Workshop 10-11 October 2007 Review on deliverables: DS-5

15 André van Es 2 nd SKADS Workshop 10-11 October 2007 Review on deliverables: DS-6

16 André van Es 2 nd SKADS Workshop 10-11 October 2007 BEST Report on optical links

17 André van Es 2 nd SKADS Workshop 10-11 October 2007 Review on deliverables: DS-7 Task number Deliverable No Deliverable Name Planned (in months) Achieved (in months) DS7-T1 1 SKADS Quarterly Report Q4/2006 19 DS7-T1 2 SKADS Quarterly Report Q1/2007 22 DS7-T1 3 SKADS Quarterly Report Q3/2007 25 DS7-T1 4 SKADS Quarterly Report Q4/2007 19 DS7-T1 5 SKADS Quarterly Report Q1/2008 22 DS7-T1 6 SKADS Quarterly Report Q3/2008 25 DS7-T1 7 SKADS Quarterly Report Q4/2008 19 DS7-T1 8 SKADS Quarterly Report Q1/2009 22 DS7-T1 9 2007 Annual Report to International SKA Project Office 24 25 DS7-T1 10 2008 Annual Report to International SKA Project Office 24 25 DS7-T1 11 2009 Annual Report to International SKA Project Office 24 25

18 André van Es 2 nd SKADS Workshop 10-11 October 2007 A Quarterly Report...

19 André van Es 2 nd SKADS Workshop 10-11 October 2007 Updated Plan Prior to 2 nd Annual Report project planning was updated All Design Studies submitted new milestone/deliverable table New milestone dates were discussed and agreed with DS leaders SKADS on track to finish on 30 th June 2009

20 André van Es 2 nd SKADS Workshop 10-11 October 2007 Deliverables/Milestones planned (update 2 nd annual report)

21 André van Es 2 nd SKADS Workshop 10-11 October 2007 Next 18 months (major milestone for each DS) DS2: Final Report on SKA configurations DS 3: –Implementation of Cost and Functional simulator tool –Selection of networking and computing technologies DS 4: Completion of 2-PAD design DS 5: Build and first testing of EMBRACE at Westerbork and Nancay (100 tiles) DS 6: BEST demonstrating beamforming and Hl sensitivity astronomical tests DS 8 : First iteration of Overall System Design and Project plan

22 André van Es 2 nd SKADS Workshop 10-11 October 2007 Review on deliverables: DS 8 Design Study 8 produces the major deliverables of the project (the focal and cohering point of SKADS): 1.Overall System Design 2.Preliminary SKA Plan 3.White Paper for the ISSC It is the collection of all activities and will show and establish the direction towards the SKA


Download ppt "André van Es 2 nd SKADS Workshop 10-11 October 2007 Review on Deliverables and forward look André van Es."