2 Establishing New Waste
Background Current Waste treatment capacity of Rostov State in Russia As a host country of 2018 FIFA World Cup, Russia has recently enacted the new law, “Industrial & Household Waste Disposal Law”. Through this program, it is expected that their previous waste recycling rate around 5~7% shall improve to the level of those advanced countries. Current Waste Treatment Capacity Of Rostov State Establishing New Waste Treatment Facility For 8 Districts Business Benefit Great number of unlicensed waste landfills Very low waste collecting rate Very low waste recycling rate due to absence of proper facilities Inefficiency due to outworn equipment Budget mismanagement due to absence of proper integrated management tool 1) Neklinovskiy MEOK 2) Salskiy MEOK 3) Morozovskiy MEOK 4) Krasnosulinskiy 5) Novocherkasskiy 6) Tsimlyanskiy 7) Myasnikovsky 8) Millerovskiy Removal of unlicensed waste landfills ☞ Eco-friendly environment Higher recycling rate via waste collection at regular intervals Financial contributions to regional economy via sales of recycled products Higher efficiency by up-to-date facilities Improved budget management Job creation

3 Current Waste treatment capacity for designated business sites
1) Kuybyshevskiy ) Matveyevo-Kurgansky 3) Neklinovskiy ) Taganrog Rostov Statement (2010) Population – 4,200,000 Current Status No Waste Type % 1 Paper 31% 2 Plastic 7% 3 Glass 3% 4 Non-Metal 2% 5 Metal 4% 6 PE 7 Organic, etc. 51%

4 Outline Rostov Guarantee
Business Outline Outline Name ROSTOV of Russia Techno Park Project (Landfill, Recycling Facility & Plant developing project) Developer MEOK LLC Location Neklinovskiy, Morozovskiy, Salskiy in Rostov, Russia Capacity ~2 million m3 per year Land 91.88 ha Duration 2018~2043 (25 years operation) Construction 2016~2018 (30 months; 2.5 years) Rostov Guarantee Grant of Exclusive rights of developing the facilities to Meok LLC for 25 years MBM Agreement with Rostov Government Provision of Infrastructure (Road networks, Electricity etc.) Investment passport

5 Rostov of Russia Landfill & Recycling Facility Plant
Current Status of designated business sites Located in Southwestern part of Russia Current Status Location: Rostov Region Population: 4,200,000 Residence (2010) Weather: Continental Climate, Rainfall below 500mm/y Access Road: Rostovskaya oblast road adjacent to the site Morozovskiy Neklinovskiy Salskiy

6 Waste Generation (m3 / year)
Waste Generation and Composition Waste Composition Location Waste Generation (m3 / year) Neklinovskiy 987,000 Salskiy 771,650 Morozovskiy 326,000 Total 2,084,650 Composition Rate(%) Recycling Rate (excluding food) Total 100 Paper 31.0 62.0 Plastic 7.0 14.0 Glass 3.0 6.0 Non-metal 2.0 4.0 Metal 8.0 PE * Organic and etc. 51.0 *Included in Plastic category Minimum recycling rate in ROSTOV: 8.0%

7 Landfill Area & Recycling Area to be classified as below ground plan
Plan of Landfill Construction _Development Plan Landfill Area & Recycling Area to be classified as below ground plan LANDFILL Waste water Treatment Facility Pellets Storage Facility Pellets Processing Facility Sorting Facility Administration Building LANDFILL AREA RECYCLING FACILITY Transfer Station Security Building

8 Plan of Landfill Construction
Landfill Plan Item Height of Landfill -15∼15m Underground 3level Area(ha) 91.88 3 districts Volume(m3) ~2 million per year Future Area For Sorting Facility Future Area For Landfill Leachate Treatment Facility Plan Item Volume(ton/d) Leachate 3.6 Wastewater 4.2 Sum 7.8 ≒ 8 Landfill Area (Present Plan) Sorting Facility

9 Plan of Pelletizing Facility _ 1st Processing Facility(Compaction)
Paper, Glass & Cans Treatment Facility Plastic Waste Treatment Facility LANDFILL Carton Shredder Carton Chip Plastic Optical selector Shredder Dehydrator Washing Glass Shredder Flake(Glass) PET Flake Flake(PE/PP/PS) Melting & Extrusion Can(Aluminum) Compaction(can) Compactor Pellet “Sale” Cutting

10 Municipal 3rd Landfill(ongoing)
Plan of Landfill Construction _ Landfill Example Municipal 3rd Landfill(ongoing) Yeongdeok Landfill Changwon Landfill JeonJu Landfill

11 Plan of Landfill Construction _ Land using plan after installation
After completion of the Landfill, it can be converted as follows for public interest: LANDFILL The view of Domestic landfill using plan(life park) Gas receiver view Outside concert hall The example of Japan’s landfill using plan(life park) Constructing neighborhood park Constructing golf course