Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)

Similar presentations


Presentation on theme: "Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)"— Presentation transcript:

1 Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)

2 EXECUTIVE - SUMMARY 2 This report is a review on our performance during the last Month and is an attempt to analyse and evaluate our service delivery and make a progressive step forward with improvement plan. The following points are put forward for review 1. Scope and nature of services 2. Proposed manpower distribution. 3. Availability of manpower. 4. Major incidents summary. 5. Initiative taken. 6. Initiatives planned for next month. 7. Power failure analysis 8. Monthly HSD consumption. 9. DG- Generated power KWH. 10. EB power consumption. 11. Average power consumption EB+DG. 12. Liquid nitrogen consumption. 13. Suggestions and requirements. 14. Transition pending works. 15. Help desk, Complaint register

3 1.Scope & Nature of Services 3 CeNSE-Facility Management Electrical HVAC Plumbing Help desk ETP BMS RO Plant Ultra pure water system

4 2.PROPOSED MANPOWER DISTRIBUTION 4

5 3.Availability of Manpower 5 DESIGNA TION Pl a n e d Jul- 11 Aug- 11 Sep- 11 Oct- 11 Nov -11 Dec- 11 Jan- 12 Feb- 12 Mar -12 Apr- 12 May -12 Jun- 12 Jul- 12 Aug -12 Sep- 12 Oct- 12 Facility Manager 11111111111111111 Technolo gist 33333333333333333 Electricia n 40233444444444444 Chiller operators 10111111111111111 BMS operator 30111111111111322 Plumbers10000111111111111 Asst.Tech nician 20222212222222222 Total1515 41011 131213 1514

6 4.Major Incidents Summary 6 DateLocationFailure detailsAction taken & Status 05-10-12UtilityDi water drained out Wet bunch tap was in open position 11-10-12CleanroomPCW filter damaged at wet etch area.Replaced the filter.

7 5.Initiatives taken 7 1. FPS- pressure gauge fixed near BMS. 2. Cleanroom wet etch area – new pipe line provided at corridor. 3. Scrap material shifted from open area. 4. PCW pump o-rings fixed. 5. LT panel room cleaned.(Which is maintaining by CCMD) 6. ETP painting work done. 7. General exhaust, chiller, AHU, DG, UPS, FPS PPM done.

8 6.Initiatives Planned for next month 8 DG “B” check. New bore well water tap connection for chiller cleaning. Electrical system taking over- CeNSE. Partition of utility 2 nd floor area. A/C works at UPS area 2 nd floor utility. AHU all- filters changing.

9 7.POWER FAILURE ANALYSIS 9 SLSL DateFromToTotal 11-10-1211:30, 15:4511:50,16:0035 Mins 27-10-1211:05,18:1511:30,18:3040Mins 310-10-129:10,9:2010Mins 412-10-129:459:5510Mins 513-10-1210:5012:10 (20 times power fluctuation)1:20 Hrs 614-10-1215:0015:1515Mins 722-10-1213:35,16:3514:05,16:4540Mins 830-10-1212:4513:0015Mins TOTAL HRS6: 05 Hrs

10 8.MONTHLY HSD CONSUMPTION 10

11 9.DG Generated Power KWH 11

12 10. EB Power Consumption 12

13 11.AVERAGE POWER CONSUMPTION EB+DG 13

14 12.LIQUID NITROGEN CONSUMPTION 14

15 13.Suggestions and Requirements 15 Shelters to be provided for DGs, Utility terrace & Fire pump house to avoid rain water and leaves come inside the DG cabin, utility building & Raw water tank in side. Shelter with closed fencing can make on the Fire tank & this area use as storage place. Uniform & Safety shoes to be provided for all maintenance staffs. Walky-talky to provided for maintenance staff. Dg-1&2 (CeNSE Building) B-Check pending. A/C for UPS to be provided. Chemical & Gas cabinet exhaust to be provided.

16 14.Transition – Pending works 16

17 15.Help desk, Complaints register 17

18 Thanks by, Facility Management Team 18