Presentation is loading. Please wait.

Presentation is loading. Please wait.

BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

Similar presentations


Presentation on theme: "BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING."— Presentation transcript:

1 BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING

2 Structure Hazards Evaluation Form Building Marking Systems

3 FIRST STREET A STREET P.S. #1 SCHOOL K-6 GOOD MARKET CHURCH MAPTEAM NAME:DATE/TIME OF QUAKE:TX-TF1 SEARCH #1SUN 23FEB92 110 HRS N B STREET

4 Building Marking Systems STRUCTURE / HAZARDS MARK Structure and Hazmat spec make a 2’ x 2’ box on building adjacent to accessible entry. Done after doing hazards assessment and filling out structure / hazards evaluation. Box is spray painted with using international orange (in TF cache)

5 Building Marking Systems STRUCTURE / HAZARDS MARK Structure relatively safe for SAR ops. There is little chance of further collapse. –Victims could be trapped by contents –Victim could be unconscious

6 Building Marking Systems STRUCTURE / HAZARDS MARK Structure is significantly damaged. Some areas may be relatively safe, but others may need shoring, bracing, removal, and/or monitoring of hazards –Building could be completely pancaked

7 Building Marking Systems STRUCTURE / HAZARDS MARK Structure is NOT SAFE for rescue ops and may be subject to sudden collapse. Remote search ops may proceed at significant risk. If rescue ops are undertaken, safe haven areas, & rapid evacuation routes (with structural monitoring) should be created.

8 Building Marking Systems STRUCTURE / HAZARDS MARK Arrow next to Marking Box indicates the direction of Safest Entry to Structure

9 HM Building Marking Systems STRUCTURE / HAZARDS MARK HM indicates hazardous material condition in or adjacent to structure. SAR Ops normally will not be allowed until condition is better defined or eliminated.

10 STRUCTURE / HAZARDS MARK - SUMMARY 15JUN92 HM NATURAL GAS OR-1 No entry until gas is turned off. When it’s mitigated, should line out the HM mark and record new date and TF Building Marking Systems

11 SEARCH ASSESSMENT MARKING BUILDING MARKING SYSTEM

12 First slash made when entering Crossing slash made as TF exits 15JUL92 1400 HR RATS 3 DEAD OR-1 2’x2’ X near each entry Building Marking Systems SEARCH ASSESSMENT MARK

13 VICTIM LOCATION MARKING BUILDING MARKING SYSTEM

14 CA 6 CONFIRMED LIVE VICTIM REMOVED VICTIM CONFIRMED DEAD VICTIM POTENTIAL VICTIM CA 6 VICTIM LOCATION MARKING Building Marking Systems

15 USAR Marking System

16 VICTIM LOCATION MARKING Go or No Go (G/N) Team Time/Date of Start Time/Date of End HAZARD INFORMATION # LIVE VICTIMS REMOVED # DEAD REMOVED PERSONS UNACCOUNTED FOR LOCATION OF OTHER VICTIMS

17 Go UKSAR 1 17/2/04 0830 17/2/04 1147 3 0 4 2 D Open Shaft: Quad E

18 Potential Victim Number and status unknown V

19 CONFIRMED VICTIM LOCATION Arrow denotes confirmation L or D denotes number of each V L 2

20 ONLY DEAD BELOW ! Arrow denotes confirmation D denotes number of each V D2

21 VICTIMS (all) Extricated Circle indicates that all located victims have been extricated (including dead). V L 2 D 1

22


Download ppt "BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING."

Similar presentations


Ads by Google