Presentation is loading. Please wait.

Presentation is loading. Please wait.

Kenneth D. Fenton P.S. Clark County Engineer’s Office.

Similar presentations


Presentation on theme: "Kenneth D. Fenton P.S. Clark County Engineer’s Office."— Presentation transcript:

1 Kenneth D. Fenton P.S. Clark County Engineer’s Office

2

3 Construction of Local Projects

4  ODOT’s processes are tried-and-true  LPA conformance to ODOT’s material and construction requirements  Possible changes and improvements

5 ODOT CMS Office of Material Management LPA Construction Contract Administration

6 Put it in writing... Document

7 LPA Documentation Checklist Documentation should support an audit. If it isn’t documented, it didn’t happen. Project Inspection Daily Diary. The daily diary should be up to date and contain the following information: All work performed by the contractor List of equipment Project personnel and hours worked Pay quantities. Check to see that they match the calculated values and how the pay quantity is determined. Daily weather conditions (weather affects the majority of work performed and is needed to determine time extensions based upon weather delays) Special notes and instructions to the contractor Any unusual events occurring on or adjacent to the project, even those not related to construction

8 LPA Documentation Checklist Measurements Measurements should be shown either in the daily diary or some other form of documentation. The inspector must indicate that the measurement is an actual field measurement. Even if the measurement is a plan dimension, note that the dimension has been field verified. If the measurements in the diary are transferred from other documentation, has the engineer indicated where to find that documentation? Calculations Do the calculations use the measured or plan dimensions? This should be indicated; field verification is required. Note whether a tape is included with the calculations. All calculations should include item of work, location, date and initials.

9 LPA Documentation Checklist Tickets Each tickets must include: JMF, date, location, item and initials Any sequence of tickets that are not in order or have tickets missing need to have a calculator tape verifying the accumulative total. Testing and Results Inspections Maintenance of Traffic Document any plan changes Material Management Is the inspector getting necessary documentation for the materials records? Documentation should provide for quality, quantity, and basis for payment. How is the project manager organizing the materials documentation? The project engineer must approve all materials and solve any deficiencies.

10 LPA Documentation Checklist Payment & Reimbursements Change Orders / Pricing for extra work Claims / Dispute Resolution Schedule and Completion Date / Time Extensions / Liquidated Damages Timeliness of payments Railroad, Utility Force Account Prevailing Wage, EEO, DBE (if applicable)

11

12

13

14

15

16

17

18

19

20

21 LPA Conformance to ODOT’s Material and Construction Requirements

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48 Utilize ODOT’s resources Share your knowledge There is always room to improve

49


Download ppt "Kenneth D. Fenton P.S. Clark County Engineer’s Office."

Similar presentations


Ads by Google