Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Banner 8 Migration Planning. 2 ► Why? ► Sungard drops B7 support 4/30/2011 (was 9/2/2010) ► Update Character set to support international standards/formats.

Similar presentations


Presentation on theme: "1 Banner 8 Migration Planning. 2 ► Why? ► Sungard drops B7 support 4/30/2011 (was 9/2/2010) ► Update Character set to support international standards/formats."— Presentation transcript:

1 1 Banner 8 Migration Planning

2 2 ► Why? ► Sungard drops B7 support 4/30/2011 (was 9/2/2010) ► Update Character set to support international standards/formats ► Prepares the platform for Banner 9 and beyond ► What? ► Banner – mainly just updating the character set of the database ► O/S and Oracle upgrades ► ODS is already on v8 ► All 3 rd party apps are being investigated for compatibility ► Appworx and Luminis ► Very few new features ► How? ► 6 test migrations (was 5) ► Using newer server architecture that better supports D/R & resource man. ► Who? ► IT and key functional “testers” ► When? ► Review Migration Timeline ► Current “Go Live” target is October 11 th, 2010 (was April 21 st, 2010)

3 3 Banner 8 Migration Planning Testing  Test data sets  Processes/Cycles to be tested  Reports  Interfaces  Integration with external systems  Local modifications  Final departmental sign-off  Each functional area responsible for creation and execution of test plans

4 4 Migration Timelines  Two Banner 8 systems now available (no 3 rd parties) ► BNR8 as of 7/20/09. Online 8/18/09 ► BNR82 as of 10/2/09. Online 11/21/09  3 rd BPPRD as of 12/3/09. Arriving 2/10/10 ► Add Appworx 2/22/10 ► Add Luminis 3/22/10  4 th BTEST – 5/6/10  5 th BSTEST – 6/7/10  6 th BEUTR – 8/18/10 ► Production “Dress Rehearsal” ► Requires a timed verification  PROD – 10/11/10 ► Begin: System down 5:00pm Friday 10/8/10 ► Before releasing, will clone to BPPRD by 9:00am ► BPPRD will be opened to select persons for validation (can run updates if need be) Banner 8 Migration Planning

5 5 Review of Banner 8 features/requirements  New features/functions  Desired timeframe for adoption ► No new features/functions are expected to be implemented for go live 10/11/10  Training needs ► Team Leaders need to determine if training is required for any new feature to be implemented after go live and order in time

6 6 Banner 8 New Features/Functions Overview Banner General  Common Security and PIN enhancements  Bio-Demo and currency data expansion  Supplemental Data Engine

7 7 Banner 8 New Features/Functions Overview Banner Student  Catalog Extract and Load  Course Wait Listing  Concurrent Curricula Phase V  Incomplete Grade Processing  Mass Entry Forms for Admissions, General Student, Registration and Graduation  On-Line Graduation Application  Misc Enhancements for Min/Max Registration Hrs, Cohorts/Attributes, Reserved Seating, Athletic Reporting, and customizable Registration Error Messages

8 8 Banner 8 New Features/Functions Overview ► Banner Financial Aid  Algorithmic Packaging  Scholarship and Athletic Enhancements  Self-Service  Email Functionality  Federal TEACH Grant Functionality  Direct Lending ► Banner Finance  Monetary and Currency Rate field expansion

9 9 Banner 8 New Features/Functions Overview ► Banner HR  Faculty Load and Compensation  Multi-Year Grant Encumbrance  Benefit and Deduction combined limit processing

10 10 Banner 8 New Features/Functions Overview ► Performance Reporting (ODS/EDW)  Enhancements to the Recruiting and Admissions star schema  New star schemas for daily reporting and trend snapshots  Improved Reconciliation Metrics ► BDMS (XtenderSolutions)  Internationalization Support (via UTF8)  Faculty Load and Compensation Support  Algorithmic Packaging support

11 11 Banner 8 New Features/Functions Overview ► Luminis  Banner PIN enhanced encryption  Data Confidentiality  Rich Text Editing  Banner Enterprise Identity Services Support)  Identity Provisioning  Enhanced Single Sign-on support

12 12 QUESTIONS


Download ppt "1 Banner 8 Migration Planning. 2 ► Why? ► Sungard drops B7 support 4/30/2011 (was 9/2/2010) ► Update Character set to support international standards/formats."

Similar presentations


Ads by Google