Presentation is loading. Please wait.

Presentation is loading. Please wait.

AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 1 AGNICO-EAGLE MINES CHESTERFIELD INLET MEADOWBANK SHIPPING PROGRAM 2007.

Similar presentations


Presentation on theme: "AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 1 AGNICO-EAGLE MINES CHESTERFIELD INLET MEADOWBANK SHIPPING PROGRAM 2007."— Presentation transcript:

1 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 1 AGNICO-EAGLE MINES CHESTERFIELD INLET MEADOWBANK SHIPPING PROGRAM 2007

2 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 2 MEADOWBANK LOCATION

3 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 3 MEADOWBANK SITE PLAN

4 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 4 Meadowbank Project – Description Mine Plan/Feasibility: General Arrangement Portage 0.5 km 0 N

5 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 5 Meadowbank Project - Description Exploration Potential: Goose South Discovery

6 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 6 BAKER LAKE FACILITIES

7 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 7 EQUIPMENT REQUIRED FOR 2007 4 X 100 tons trucks 1 Grader 1 Loader 1 Dozer 8 Pick-up trucks 1 Ambulance 2 Cranes Concrete mixers Container handler Pumps Construction equipment Concrete plant

8 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 8 MATERIAL REQUIRED FOR 2007 4 600 tonnes of cement Reinforced steel 20 million litres of fuel Steel plate for fuel tank construction Wood for construction Mill building material Weather haven garage 72 dormitory modules Steel and plastic pipes etc.

9 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 9 2007 CONTRACTS Road Site preparation Tank Farm Concrete work Camp installation Mill Building Installation

10 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 10 ALL WHEATHER ROAD

11 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 11 BRIDGE

12 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 12 BRIDGE LAUNCHING

13 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 13 BAKER LAKE TANK FARM

14 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 14 MEADOWBANK MINE SITE

15 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 15 MEADOWBANK CAMP EXPANSION

16 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 16 MEADOWBANK SITE 2006

17 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 17 DORMITORIES BEING MANUFACTURED

18 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 18 DORMITORIES READY FOR TRANSPORT

19 AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 19 MATNA THANKS QUESTIONS ?


Download ppt "AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY 2007 1 AGNICO-EAGLE MINES CHESTERFIELD INLET MEADOWBANK SHIPPING PROGRAM 2007."

Similar presentations


Ads by Google