1 EDF R&D CIM for DA Status, Feedback & Challenges

2 2 - Eric Lambert EDF R&D IEEE 2010 PES General Meeting Minneapolis - 00 Mois 2009 EDF R&D SMARTGRID PLATFORMS DIGI²TAL : Distribution Grid Intelligence InTegrAtion Laboratory Model Driven Engineering Integration platform (CIM-61850-COSEM) Provides Methodology, Tools, and Services to others R&D smartgrid related projects Give access to Smartgrid platform R&D demonstrator MENOFIS MENOFIS : Smartgrid platform

3 3 - Eric Lambert EDF R&D IEEE 2010 PES General Meeting Minneapolis - 00 Mois 2009 DIGI²TAL : Model Driven Engineering platform & access point to Smartgrid MENOFIS

4 4 - Eric Lambert EDF R&D IEEE 2010 PES General Meeting Minneapolis - 00 Mois 2009 New environment for power systems design and operation European targets and attractive feed-in tariffs Increased deployment of small / medium renewable generation connected to the distribution networks Actual power systems were not designed and operated to integrate a large share of intermittent and distributed generation Requirements for new technical solutions for system security and for integration costs minimisation Renewable DG to contribute to system security Distribution Network Distribution Network Transmission Network Transmission Network

5 5 - Eric Lambert EDF R&D IEEE 2010 PES General Meeting Minneapolis - 00 Mois 2009 Technical impacts of distributed renewable generation DSOs anticipate that they can integrate only a limited capacity of DG without a major reinforcement Limiting factors in many European distribution networks: voltage rise effect

6 6 - Eric Lambert EDF R&D IEEE 2010 PES General Meeting Minneapolis - 00 Mois 2009 Technical solutions to enable DG integration Which interactions between actors for the controlability? Observability for both TSO and DSO

7 7 - Eric Lambert EDF R&D IEEE 2010 PES General Meeting Minneapolis - 00 Mois 2009 What are the solutions? Approach with existing practise (fit and forget) No control over DER / Worst case scenarios used for connection sizing Active distribution network: Coordinated control of voltage and flows (VVC: Volt VAr Control function) to: Maintain voltage within limits and Optimise other parameters (Reactive power transit between DSO and TSO / Distribution network losses / ….) Increase DG hosting capacity VVC A P,-Q CHP S P ±Q PV P ±Q LV MV NOP

8 8 - Eric Lambert EDF R&D IEEE 2010 PES General Meeting Minneapolis - 00 Mois 2009 Architecture of control centre tools for an active network Distribution State Estimation (DSE) VVC Substation local measurements DER real-time measurement Real-time network topology Network Data, Load models Constraints Contracts (with TSO and DG) Capacitor banks DER set points Transformers tap changer SCADA HMI New sensors measurements Prototype developped with MATLAB-PSAT using a CIM interface for data configuration Data Configuration + LOAD FLOW successfully tested during CDPSM 2009 IOP Tests Data Configurator

9 9 - Eric Lambert EDF R&D IEEE 2010 PES General Meeting Minneapolis - 00 Mois 2009 Experiment and validation (2007-2010) Value and Validate Distribution Automation Functions LOT A – Existing Control System SCADA MGIR Manual Commands Testing New Automation Functions Grid Configurator SITR FonSynt Information Bus FonLoc Connexion Function to the Info Bus MMI State estimation FonRep Reconfiguration, VVC CIM

10 10 - Eric Lambert EDF R&D IEEE 2010 PES General Meeting Minneapolis - 00 Mois 2009 R&D Challenges Harmonization between CIM & 61850 Prove it through a prototype based on SCADA/DMS ERDF System Strategic & Technical Coordination At EDF R&D level In coordination with EDF Group operational divisions In coordination with International Bodies European commission European Utilities Associations International Users associations like UCA CIMUg, UCA 61850, UCA OpenSmartgrid French Smartgrids demonstrators North American Smartgrids demonstrators (EPRI) Other worldwide smartgrid initiatives Anticipate

11 11 - Eric Lambert EDF R&D IEEE 2010 PES General Meeting Minneapolis - 00 Mois 2009 DLMS-COSEM 6185061850 6185061850 EMS Apps DMS Apps OMS Apps Metering Apps ERP applications SCADA 61850 Inter Control Center link Our belief : Key Smartgrid standards CIM (61970-61968) / 61850 / COSEM 61970 / 61968 Distributed Energy Resources 61850 Substation Automation System Switchgear, Transformers, Instrumental Transformer Protection, Control, Metering 61850 HV/MV Substation Substation Field Device n 61850 CIM 61850 AMM applications Energy Box WIND Generating Unit CIM TASE-2 61850 CIM Metering System CIM 61850 Entreprise Service Bus (ESB) ERP applications ESB Market Management Systems CIM Nuclear Power Plant Hydro Power Plant Thermal Power Plant 61850 SCADA Generation Management System Apps. ESB Transmission Distribution Remote Control System Generation Management System Market Management System AMM system WIND FARMS CIM Meters MV/LV Substation DLMS/COSEM HAN Secondary Substation Node Field IED n 61850 CIM