1 Part-financed by the European Union (European Regional Development Fund) Zoning in MSP – Examples from Germany and Pilot Project Pom. Bight Click to add presentation subtitle, author, event, etc.

2 Zoning in MSP for Pomeranian Bight (BaltSeaPlan Pilot Project) German Maritime Spatial Plans for the EEZ (North and Baltic Sea)  Guidelines for the spatial development – Securing and strengthening maritime traffic – Strengthening economic capacity – Promotion of offshore wind energy use – Long-term sustainable use of the properties and potential of the EEZ through reversible uses, economic use of space, and priority of marine uses – Securing natural resources Click View / Header & Footer to edit

3 Zoning in MSP for Pomeranian Bight (BaltSeaPlan Pilot Project)  Spatial designations, regulations, rules: – Shipping – Pipelines – Marine Scientific Research – Energy Production, wind energy in particular  Regulations and rules with regard to: – Exploitation of non-living resources – Fisheries and mariculture – Marine environment – Further Interests: Military Use, Leisure and tourism, ammunition dump sites and sediment deposition Click View / Header & Footer to edit

4 Zoning in MSP for German EEZ Click View / Header & Footer to edit

5 Zoning in MSP for German EEZ Click View / Header & Footer to edit

6 Zoning in MSP for German EEZ General types of regulations – Planning target (legally binding for sectorial planning on project level, e.g. wind farms) – Planning principle (guideline that needs to be particularly considered in the decision process) Click View / Header & Footer to edit

7 Zoning in MSP for German EEZ Spatial Designations – Area types – Priority areas (Vorranggebiete): area reserved for a defined use, other conflicting uses are excluded  planning target – Reservation areas (Vorbehaltsgebiete): area with a special weight for a defined use in the balancing of interests  planning principle – [Suitable areas (Eignungsgebiete): defined use is allowed within and excluded outside designated areas (Priority area with preclusive effect)  planning target - former designated suitable areas for wind energy had been converted into priority areas in the MSP for the EEZ ] Text level 3 Click View / Header & Footer to edit

8 Zoning in MSP for German EEZ Click View / Header & Footer to edit Shipping lanes as basic structure of the draft plan (Art. 60 VII UNCLOS: priority issue under intern. law) priority areas: must be kept free from obstacles/conflicting uses reservation areas: shipping has special weight in balancing spatial interests no traffic regulation!!!!! (protection of existing traffic)

9 Zoning in MSP for German EEZ Click View / Header & Footer to edit Pipelines priority areas: (500m) buffer zone along existing pipelines: conflicting uses excluded (  where overlapping with priority areas offshore wind energy pipeline issues to be given preferential consideration) reservation areas: (500m) buffer zone along existing pipelines: special weight in balancing spatial interests

10 Text level 1 – Text level 2 Text level 3 Click View / Header & Footer to edit Offshore Energy priority areas Offshore Wind Energy: conflicting uses excluded  general suitability incl. SEA finally determined Offshore Wind Farms outside priority areas possible (case by case assessment) No Offshore Wind Farms (incl. Other permanent constructions) within Natura2000 areas and priority areas for shipping and for pipelines Zoning in MSP for German EEZ

11 Click View / Header & Footer to edit

12 Zoning in MSP for German EEZ Click View / Header & Footer to edit

13 Zoning in MSP for German EEZ Click View / Header & Footer to edit Pipelines priority areas: (500m) buffer zone along existing pipelines: conflicting uses excluded (  where overlapping with priority areas offshore wind energy pipeline issues to be given preferential consideration) reservation areas: (500m) buffer zone along existing pipelines: special weight in balancing spatial interests

14 Zoning in MSP for Pomeranian Bight (BaltSeaPlan Pilot Project) Text level 1 – Text level 2 Text level 3 Click View / Header & Footer to edit