Presentation is loading. Please wait.

Presentation is loading. Please wait.

P2P Working Group Report Hyun-chul Kim 2003.8.29 (Fri)

Similar presentations


Presentation on theme: "P2P Working Group Report Hyun-chul Kim 2003.8.29 (Fri)"— Presentation transcript:

1 P2P Working Group Report Hyun-chul Kim 2003.8.29 (Fri)

2 P2P Session n 2003.8.27(Wed) Early Morning, AM 7:30~9:00 n About 15 participants n Program - Korea@Home project, by Connor Park/KISTI - An Hybrid P2P-style distributed computing platform - Test operation (2003.2.6~2.14) : 6,472 clients, Max 644Gflops (> World Top Rank 124 th ), Avg. 470.6Gflops - Applications : Virtual Screening for new drug design, 3D image rendering - Structured P2P Network for Loop Avoidance, by Chan-mo Park/KJIST - An Overview of Jxta for Supporting P2P Technologies and Applications, by Simon See/NTU&Sun - Several application examples developed using Jxta

3 P2P WG Meeting n n 8.27(Wed) AM 11:00~12:30 n n 6 participants n n Need to revise and/or elaborate more on WG charter Currently the WG charter is mentioning only about P2P techs/applications on a High-bandwidth network, but only a few countries in APAN have High-bandwidth pipes, while others do not. Heterogeneous network environment (from tens of K/Mbps to tens of Gbps, in terms of BW) across APAN community may provide us a unique position (kinda niche place) in proposing as well as developing P2P Techs/Systems necessary in a such environment Need to perform Requirement Analysis through brain- storming/discussion among WG members as well as young people (students) who use/research on p2p applications for content exchange, internet messaging, etc., everyday naturally leads members to discuss/cooperate with each other.

4 Plan for the next 6 months n n Hyun-chul Kim will keep going as the WG chair n n Charter revision (goals, direction, specific action items and milestones) : activate a series of discussion on p2p@apan.net and graduatestudent@apan.net and draft by mid/late September.p2p@apan.netgraduatestudent@apan.net n n Implement the defined action items, based on the WG meeting participants comments. n n Prepare joint meeting/session with I2 P2P WG members for the next Honolulu APAN meetings. (I2 contact point : David Futey/Stanford and Ana Preston/UTK).


Download ppt "P2P Working Group Report Hyun-chul Kim 2003.8.29 (Fri)"

Similar presentations


Ads by Google