1 4/21/2017 MicroSCADA Pro DMS 600 Matti Kärenlampi FISUB/Österbacka

2 DMS 600 Topics Release of DMS 600 4.2 SP1
4/21/2017 DMS 600 Topics Release of DMS SP1 DMS 600 for Industrial Networks Extended SA systems / Small FA systems Offline Network Information & planning systems FISUB/Österbacka

3 DMS 600 4.2 SP1 Overview Some new features
4/21/2017 DMS SP1 Overview Some new features Corrections and enhancements in all areas Details are available in the Release Notes Database upgrades are needed Access based DB updated during Server installation Scripts exist to update SQL Server and Oracle Windows Vista is supported This presentation gives a brief overview and does not cover all improvements FISUB/Österbacka

4 Documentation All (5) manuals updated Also on-line helps
4/21/2017 Documentation All (5) manuals updated Installation Manual 1MRS755275 Operation Manual 1MRS755274 System Overview 1MRS755272 Integration with SYS 600 1MRS755273 System Administration 1MRS755276 Also on-line helps FISUB/Österbacka

5 New Features New DMS 600 message service (TCP socket based)
4/21/2017 New Features New DMS 600 message service (TCP socket based) Additional symbol definition (decluttering) levels (to 10) Additional symbols for MV/LV transformer and disconnector subtypes FISUB/Österbacka

6 New features cont. Optionally coloring of MV/LV transformer and MV/LV substation symbols with feeder color Feeding network can be seen if open point inside substation Temporary earthings and opened line sections Exact location and several items for each line section Operational zooming Workstation status bar enhancements Traffic light and tooltip

7 New features cont. Line types (Solid Line, Dashed Line, Dash-Dot, etc.) for conductor/cable types

8 Software Delivery The SP1 is available on www.abb.com/microscada
4/21/2017 Software Delivery The SP1 is available on Includes also Release Notes Note! Installation package is not incremental i.e. it can be installed alone (difference to SYS 600) No changes in Ordering Procedures or tools FISUB/Österbacka

9 DMS 600 Topics Release of DMS 600 4.2 SP1
4/21/2017 DMS 600 Topics Release of DMS SP1 DMS 600 for Industrial Networks Extended SA systems / Small FA systems Offline Network Information & planning systems FISUB/Österbacka

10 Introduction for industrial networks
4/21/2017 Introduction for industrial networks Network overview with tracing, zooming, panning and de-cluttering Network asset database Load flow calculations with motor start-up Short circuit current calculations Protection planning with selectivity analysis Operational switching planning Network reinforcement planning with load flow and short circuit capacity checks All this and more with DMS 600 From ABB FISUB/Österbacka

11 Network overview Asset database with several views
4/21/2017 Network overview Asset database with several views Geographic view with cable and component locations Operational diagrams etc. Fast overview of all lines, switches, transformers, substations etc. Zooming Panning De-cluttering FISUB/Österbacka

12 4/21/2017 Topology Management Analyses the connectivity of the network and shows results in any view Looped network De-energized parts Dynamic line coloring Upstream and downstream tracing FISUB/Österbacka

13 4/21/2017 Load flow calculation P, Q, I, U for every line in the network in real time or simulated situations Capacitors and generators included for reactive power analysis Load data using Given power/annual energy or load curves Motors including starting motors Real time load flow using feeder, motor and generator measurements Result representation using coloring FISUB/Österbacka

14 Fault currents and protection analysis
4/21/2017 Fault currents and protection analysis 3-, 2- and 1-phase short circuit currents Over current protection analysis Detection ability Short circuit capacity Protection selectivity Result representation using coloring and detailed numerical results for all line sections FISUB/Österbacka

15 Operations Planning Create and simulate switching sequences in advance
4/21/2017 Operations Planning Create and simulate switching sequences in advance Two way to create a sequence: Automatic sequence creation Checking of technical constraints Learn mode (macro recording) Contingency Analysis for predefined outage situations Plan Management Saving Scheduling Execution Support FISUB/Österbacka

16 Operations Planning The tasks in switch orders can be customized
4/21/2017 Operations Planning The tasks in switch orders can be customized Checking, approval, work permit… Tight Integration with MS Word to create documents MS word templates with modified content, layout and customer logos The end user can define and print customized switch order documents FISUB/Österbacka

17 Operations Planning The tasks in switch orders can be customized
4/21/2017 Operations Planning The tasks in switch orders can be customized Checking, approval, work permit… Tight Integration with MS Word to create documents MS word templates with modified content, layout and customer logos The end user can define and print customized switch order documents FISUB/Österbacka

18 DMS 600 Topics Release of DMS 600 4.2 SP1
4/21/2017 DMS 600 Topics Release of DMS SP1 DMS 600 for Industrial Networks Extended SA systems / FA systems Offline Network Information & planning systems FISUB/Österbacka

19 Decentralized Distribution Automation
4/21/2017 Decentralized Distribution Automation Distribution automation with fault location, isolation and restoration at HV/MV substations Why decentralized would be an option? Advanced data from IEDs is available at substation without communication delays -> event analysis and advanced algorithms are possible Communication to Feeder RTUs easier to implement (radio) Number of stations and FRTUs may grow too big in control center for advanced applications Control center may have existing SCADA (DMS) system not capable for advanced DA FISUB/Österbacka

20 Example of large feeder automation
4/21/2017 Example of large feeder automation 1 HV/MV substation 16 feeders ~100 FRTUs With DNP3 FISUB/Österbacka

21 DA System compared to SCADA/DMS
DA System is decentralized Separate feeder automation (FA) system without SA functionality (CB trips from station normally needed) Extended SA system including feeder automation devices with communication and applications DA system requires network model for advanced network applications like restoration and load estimation Load estimation and forecasting needed to check capacity in down-stream network restoration

22 Things to consider Does control center need states also from FTUs
SYS 600 acting as gateway also for these How to control a tie switch* that is between two feeding substations Can both systems control? Should the DA systems discuss with each other * Tie switch = open switch before fault providing back-up feed

23 Existing products can be utilized
MicroSCADA Pro SYS 600 and DMS 600 can be used directly for extended SA Remote desktop from control center often needed Engineering is fast compared to full DMS Station diagram import from SYS 600 Feeders do not need to have all objects and exact locations No maps

24 DMS 600 Topics Release of DMS 600 4.2 SP1
4/21/2017 DMS 600 Topics Release of DMS SP1 DMS 600 for Industrial Networks Extended SA systems / FA systems Offline Network Information & planning systems FISUB/Österbacka

25 Functionality of DMS600 - NIP
4/21/2017 Functionality of DMS600 - NIP Using Network Information and Planning Module Asset database Geographic documentation Data analysis and reports Network calculations (load flow and short circuits in peak power situation) Map printing Network planning Maintenance planning The network information and planning module uses same database and network presentation as other DMS600 modules FISUB/Österbacka

26 Network Information and Planning Module
4/21/2017 Network Information and Planning Module Documentation Network calculation Data analysis Planning Database update Asset database External systems DMS600 FISUB/Österbacka

27 4/21/2017 Network Planning In network planning alternative network structures can easily be compared regarding Technical acceptability Cost of losses Building costs Main results for each plan include Costs of investment and losses from entire study period in NPV* Interest rate and load growth needed Material report and network reliability indices SAIDI and SAIFI (or T-SAIFI T-SAIDI) also reliability cost is estimated * NPV = net present value FISUB/Österbacka

28 Customers for Network Information & Planning
Extension of SCADA/DMS System to allow network planning and fluent network database updates when network is built Separate off-line tool without DMS on-line features Consultants and contractors building networks for network planning and documentation Planning phase only or full NIS for end customers Protection planning and setting calculations

29 Changes to licensing Information and planning (NIP) as parallel to DMS 600 Base System User can select DMS 600 base or NIP base or both If DMS 600 base is also selected, 50 % reduction in NIP base price Price per workstation calculated only once DMS 600 additional options are available only when DMS 600 base is selected and NIP options are available when NIP base is selected If “Low Voltage Networks” is selected as a DMS 600 option, no additional price for corresponding option in NIP