Presentation is loading. Please wait.

Presentation is loading. Please wait.

U. S. Coast Guard Aircraft Repair and Supply Center.

Similar presentations


Presentation on theme: "U. S. Coast Guard Aircraft Repair and Supply Center."— Presentation transcript:

1 U. S. Coast Guard Aircraft Repair and Supply Center

2 Our Mission We provide Air Stations with depot level maintenance, engineering, supply and information services to support Coast Guard missions.

3 “We keep ‘em flying” by providing: the Right Stuff at the Right Place at the Right Time at the Right Cost Every time. Our Vision

4 HH-65 XO HU-25 Safety HH-60 C-130 HC-144 CO Organization ALDISD IODPRDOPS EISD ISDEISDIODPRDOPS

5 Military: 159 –55 Officers –104 Enlisted Civilian: 552 –218 GS –334 WG Contractor: 700+ HS Apprentice: 32 Total: 1400+ Staffing

6 Budget

7 Facilities u Total: 14 buildings u 508,500 sq ft

8 2 Production Hangars Facilities

9 Stripping Hangar Paint Hangar Facilities

10 3 Acre Warehouse

11 Engine Shop Facilities Gear Box Shop

12 Facilities Machine Shop

13 Facilities Avionics Repair Facility

14 Depot Maintenance 23 - HH65/year 9 - HH60/year 4 - HU25/year 3 – C130/yr @ EC

15 Depot Maintenance Aircraft Modifications –HC130 DF-430, HSI Replacements, ASIP Inspections, Selex Radar, Wing Rewire –HH65 C Re-Engining –HU25 Avionics Upgrade –HH60 T Conversion, AUF, Avionics, Rewire

16 Depot Maintenance Component Repair –90 Jet Engines –400+ components (wheels, doors, actuators, servos, avionics, etc.)

17 Engineering Technical Center u Set Coast Guard aeronautical maintenance policy and direction u Define/refine/field ALL proposed aircraft changes

18 Engineering Technical Center 8000 publications & 450,000 technical drawings 2775 Pubs Owned By ARSC Web-Based

19 Aviation Inventory Control point $930M parts (ARSC warehouse and 26 air stations) 33,000 line items 5.5M parts Supply Services

20 IT Services Data Center Fully Deployed Contractor Sites DHS Prototype Sites

21 Current Initiatives u Lean Manufacturing u Unique Identification (UID) u C130 Organic PDM u USAF JDLM u Logistics Transformation Initiatives

22 World Class Quality ISO 9001:2000 Certification ISO 14001:2004 Certification Commandant’s Quality Awards 2 Silver and Gold 2006 White House CTC Env Award 2005/2006 CG Industrial Maintenance Innovation Awards

23 Performance Based Logistics Prior to PBL with Rockwell Collins u Equipment repaired via firm fixed price orders. u All Non-RFI physically flowed thru ICP – ARSC. u ICP would fund and issue an order and ship material to Rockwell repair center. u QDR/UR issued if quality was bad and unit was returned on no-cost delivery order. u Numerous repair orders and modifications increased the administrative burden on the government and the contractor. u Vendor essentially received more profit for more failures. u “Throw back over the fence” repair quality. u Inefficient shipping pathways. u Repairs were only done as necessary. u Test equipment was problematic, resulting in more questionable repair actions...$$.

24 Current PBL Process u Description of Scope u Mission Readiness Requirement Of 85% u Contractor Management of Customer Assets, including test equipment. u Guaranteed Reliability baseline with incentives (MTBUR not MTBF) u Provides onsite training to field users u Platforms Supported u All Rockwell Collins content on the HU-25 and HH-65 aircraft u Supports 74 different LRU’s u Supports 113 Aircraft at 25 CONUS locations u Availability to Support the Fleet u 85% Availability Guaranteed u 24 Hr OST (Order Ship Time) For Class 1 Requisitions u 5 Day OST for Class 2 Requisitions u Average Ship Times Reduced to less then 3 Days for all requisitions

25 Current PBL process, cont’d u One order placed against the contract @ the beginning of the year. u Failed boxes are shipped directly to and from the repair center at Rockwell Collins. u Rockwell must have access to CG inventory database. u QDR/UR are practically unnecessary and are “For Information Only”

26 Incentivized Performance Supply Metrics u Ability to fill CG requisition in a timely manner u Priority 02 within 24 hours u Priority 05 within 5 work days u Priority 12 within 15 work days u Ability to meet these requirements counts for two thirds of the total incentive $ u Vendor issues a monthly report on their own performance, which is then verified by the Coast Guard.

27 Incentivized Performance Quality Metrics u Ability to make repairs that last on-wing. u MTBUR as measured against a established baseline MTBUR. u Counts as one third of total incentive. u Rockwell issues a quarterly report on their own performance.

28 Then and Now ComparisonPastPastTodayToday Failure Response Operational Availability Reactive Proactive Inconsistent Zero Variability Rigid, Inflexible Agile, Reconfigurable, Customized Unresponsive, Unavailable Responsive, Customer-Centered Price Value

29 Advantages of PBL u The cost is contained (number of flight hours versus number of repairs). u The administrative costs of issuing numerous orders is eliminated. u More efficient shipping path from CG units to repair center. u Rockwell’s incentive for doing quick marginal repairs is eliminated and replaced with an incentive for doing improved repairs. u Rockwell manages assets in order to maximize availability. u Test equipment and training for covered assets is partnered with vendor.

30 PRODUCT LINE DRIVEN ORGANIZATION u Single belly button u Ownership u Teamwork u Synergy u Flexibility

31 CHALLENGES u Adequate, Qualified Staffing u Adequate Budgeting u Timely identification of requirements u Adequate definition of requirements and roles and responsibilities

32 QUESTIONS?


Download ppt "U. S. Coast Guard Aircraft Repair and Supply Center."

Similar presentations


Ads by Google