1 Norwegian pilots Update 3rd February 2004 OASIS PLCS TC Cdr Tor Arne Irgens, tai@sfk.mil.no

2 New materialRequirements IT systems Legacy New FIF Fighter aircraft Frigates Fast patrol boats Helicopters Surface-surface missiles … Def std 00-60 interim 1996+ SFK info model some 1288 req (1999) Systems can’t hold the information Don’t meet legal requirements Batch integration GOLF program (Initial) data deliveries from Prime Contractors Legacy data conversion SAP + (many) other appls NPDM PLCS +ISO 15926 data Repository Std data model Background

3 IZAR PDB Quality Check Pilot 1(NDLO/MI): Mapping of IZAR data to PLCS Ongoing Pilots

4 Pilot 1 Analyze the relation between the data model that IZAR use in the Project Database (PDB) for the frigates and the requirements model of the NDLO/Navy for the through-life support of the frigates Complete the mappings from the NDLO/Navy data model to the PLCS data model that were conducted in the phase-A project Agree and test with IZAR an export format for the PDB population

5 IZAR PDB Quality Check Pilot 1(NDLO/MI): Mapping of IZAR data to PLCS development of PLCS DEXs Ongoing Pilots PDTF PLCS Mapping Translator DEX Staging area Pilot 2 (NDLO/SEA): Receipt and testing of data from IZAR

6 Pilot 2 Contribute to an evaluation of the standard ISO10303–239: Establish a translator in order to automate, test and quality check of the information deliveries from IZAR Establish a temporary staging area, based on the PLCS data model, for receipt of data from IZAR Establish DEX’es (Data Exchange Sets) in order to standardise the exchange of data from the temporary staging area Quality check of data transferred

7 IZAR PDB Quality Check Pilot 1(NDLO/MI): Mapping of IZAR data to PLCS SAP ver. 4.6 Additional applications GOLF Logistics pilot – receipt of Life Cycle info. Pilot 3 (GOLF): Analysis of storing of frigate data in SAP based on the PLCS standard Translator Functional difference Information content difference development of PLCS DEXs Ongoing Pilots PDTF PLCS Mapping Translator DEX Staging area Pilot 2 (NDLO/SEA): Receipt and testing of data from IZAR

8 Pilot 3 To reveal, by means of the functional mapping, the difference between the functional requirements PLCS is requesting and the functions SAP is covering To assess, by means of the data mapping, the capability of SAP to store PLCS data Make recommendations for exchange of information with SAP according to the PLCS standard, and to identify PLCS driven requirements for a translator to SAP

9 4Q 2004 Mapped P21 Test data JUNE 2004 ?

10 Milestones Pilot 1 Mapping from IZAR to PLCS –Complete by end March Pilot 2 PLCS repository –Official data deliveries starts June 2004 (LSAR F310) Pilot 3 mapping from PLCS to SAP 4.6 –High level design of FIF starts 1Q –Detailed design due to start 2Q 19 months to F310 is commissioned

11 Need DEX 1, 3, 5 and 8 NOW Or NDLO will have to move forward by other means