Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Indiana Department of Homeland Security Training Division Presents Technical Rescue Awareness Program.

Similar presentations


Presentation on theme: "1 Indiana Department of Homeland Security Training Division Presents Technical Rescue Awareness Program."— Presentation transcript:

1 1 Indiana Department of Homeland Security Training Division Presents Technical Rescue Awareness Program

2 Overview This program is brought to you by the Indiana Department of Homeland Security and the Indiana Fire Chief Association’s Technical Rescue Committee 2

3 Instructor Introductions Lead Instructor – Name – Department – Back ground / experience Adjunct Instructor – Name – Department – Back ground / experience 3

4 Student Introductions Name Department Back ground / experience Does your department provide any technical rescue response 4

5 Host Agency Issues Restrooms Parking Phones Emergency Exits Smoking Policy / Tobacco Use Breaks 5

6 Certification Requirements for certification – Certified in Hazardous Materials Awareness – 100% attendance of the 12 hour awareness course – Passing the state written exam by 70% 6

7 Purpose Statement Purpose of the Course is to enhance the students understanding of the following capabilities: – Assessing Technical Search and Rescue Hazards within their response area. (Community Risk Anaylysis) – Identifying the appropriate level of Operational Capability (organizational) as established by the AHJ. (Guidelines) – Implementing the appropriate Functional Capabilities (individual) when engaging in technical rescue events as established by the AHJ. ( Procedures) – Identifying appropriate Awareness Level Operational / Functional capabilities for INITIAL COMPANY OPERATIONS at technical rescue events. 7

8 General Scope Course Requirements & Standards – Follows guidelines of NFPA Standards and OSHA Regulations. – Refresher training should be conducted annually. – Further training is required for actual rescue operations and practices. 8

9 General Course Content (NFPA 1670 Subjects) – Structural collapse Various types of building collapse – Rope rescue Various rescue situations require rope work – Confined space Rescues in confined spaces, vats, sewers, silos, etc. – Vehicles & Machinery Roadway extrication and industrial rescue / extrication 9

10 General Course Content (NFPA 1670 Subjects) – Water Ice, surf, dive, and swift water – Wilderness search and rescue Search patterns and situation analysis – Trench & excavation Various rescue situations trench & excavation situations 10

11 AHJ Requirements NOTE – This course DOES NOT contain hands on training – The AHJ is responsible for training per NFPA 1670 Operations and Training at Technical Rescue Incidents – The AHJ must assure members have Hazardous Materials Awareness certification 11

12 General AHJ must conduct hazard and risk analysis to determine feasibility of conducting Technical Rescue Operations – Information to make informed decision – Likelihood of incident – Where it might occur – Effects on the community 12

13 Hazard / Risk Analysis Matrix 13 HazardsRisksRequirementCapability Earthquake, TornadoStructural Collapse, Confined Space, Extrication, SAR team, Structural Collapse team, ect. Flood, river, lakeSwift Water, Hazardous Materials Old Structures Highrise Fire, explosion Industrial Agriculture Machinery Wells, caves, mines, tunnels Tanks, cesspools, excavations

14 General AHJ should adhere to OSHA General Duty Clause ( Provide a safe workplace for employees ) NFPA 1670 Levels of functional capability – Awareness Level Basic initial company response – First on the scene in course of duty – Identify type of incident – Start initial company operations – Generally NOT considered rescuers 14

15 General NFPA 1670 Levels of functional capability (con’t) – Operations Level Basic technical response – Deal with most non-complex situations – Technician Level Considered expert in the field – Deal with complex and difficult situations 15

16 General Each AHJ needs to establish an Incident Response Plan to include policies and procedures for technical rescue operations in accordance with NFPA 1670 (Establish SOG’s and SOP’s) AHJ has complete control over all resources requested AHJ has authority to stop all rescue attempts 16

17 General Safety at a technical rescue – Personnel accountability system (PAS) Account for all members at incident Evacuation procedures / guideline – Everyone operating at the incident must know correct actions if evacuation order is given Evacuation Signals (example from FEMA US&R) – Evacuate – 3 short blasts (1 second each) – Cease Operations – 1 long blast (3 seconds long) – Resume Operations – 1 long and 1 short blast 17

18 General PPE – Each AHJ is responsible for determining appropriate level of PPE In most cases, will not be structural firefighting gear 18

19 General Hazard & risk assessment (scene size-up) – Continuous (Six sided approach) – Every technical rescue, no matter what magnitude, can change in a second – Initial size-up will set ground work for entire incident 19

20 Size -Up 20

21 General Size-up (con’t) – Scope, magnitude, nature of incident – Location and number of victims Time of day, Area affected, complexity of incident – Risk / benefit analysis Will the end result justify the means – Pre-plans May provide structure information – Environmental factors Extreme heat and cold 21

22 General Size-up (con’t) – Patient contact/condition Your safety is paramount Can you see or hear patients? Hailing, tag lines, radios, con-space systems Does the patient know where they are? Availability / needed resources – What resources do you need? – What resources do you have available? 22

23 General IMS / ICS – In order to manage the incident, command and control must be established. – Positions Filled (minimum) Command – Responsible for entire incident Safety – Should be trained to level of incident 23

24 General Additional IMS / ICS Positions to consider Operations Section Chief – Rescue Branch Director » Establish rescue plan » Inform all personnel of the plan » Insure the plan is carried out Optional Positions – Finance, Logistics, Planning, PIO – Others outlined in NFPA 1561 Standard for FD Incident Management 24 Rescue

25 General Scene control – Control zones Hot, warm, cold – Witness interviews Who, what, where, when, why from all people in area Patient contact – Control who talks to victim and what victim hears Bystander interaction – Control zones will keep non-essential people out of harms way 25

26 General Scene control – Police assistance PD is a valuable resource – Machinery / vehicles Find someone with expertise (machines) What are the actions of a full cycles machine? Use apparatus to block traffic, not personnel – Utilities Have emergency contact information ahead of time. Know capabilities and resources. 26

27 Course Objective This course has been designed to meet the 2004 edition of NFPA 1670. Students should reference the standard for specific objectives for the awareness level in each subject addressed. At the completion of each subject, the student should be able to implement the relevant Initial Company Operations 27

28 Initial Company Operations 28 1.) Establish Strong Visible Command Upon Arrival Provide initial report Implement ICS / NIMS Minimum Positions Command Safety Establish additional Command and General Staff as needed Consider Unified Command for Complex Incidents

29 Initial Company Operations 29 2.) Identify the need for Technical Rescue Conduct Rapid Size-up considering the following: Scope, Magnitude, and Nature of the incident Location / complexity of the incident Risk vs. Benefit (rescue or recovery) Scene Access Functional Capabilities of Available Resources Location of Additional, Trained Resources Environmental Conditions

30 Initial Company Operations 30 3.) Recognize General Hazards involved in the incident Make area safe for all responders Identify all hazards Control / Limit Traffic Control / Limit Access Mitigate hazards within your capabilities.

31 Initial Company Operations 31 4.) Identify the appropriate resources for the incident Consider Functional Capability Awareness Operations Technician 5.) Initiate the appropriate emergency response system Consider all available response systems as identified by AHJ Local County State National

32 Initial Company Operations 32 6.) Initiate Site Control Measures Establish personnel accountability system (control access points) Develop Incident Action Plan (communicate the plan to EVERYONE) Establish an Evacuation Plan (communicate the plan to EVERYONE)

33 Initial Company Operations 33 6.) Initiate Site Control Measures (con’t) Secure the general area Secure Witnesses and conduct interviews for intelligence Establish Control Zones (rule of thumb) Hot Zone 100’ for critical functions Warm Zone 200’ for support functions Cold Zone300’ for Command and Control Outside Cold Zone Liaison to Rest Of World

34 Initial Company Operations 34 7.) Establish Patient Contact (without endangering personnel) Establish Location of all Patients Establish Verbal Contact with Patients Determine Patient Condition (from a safe distance) Assist with Surface or NON-ENTRY RESCUE (without endangering personnel)


Download ppt "1 Indiana Department of Homeland Security Training Division Presents Technical Rescue Awareness Program."

Similar presentations


Ads by Google