FIELD VERIFICATION OF THE SCHEME SPA ( ), VALUE CHAIN ( ) & RKVY CORPUS FUND ( ) IMPLEMENTED UNDER MSAM MAWTHADRAISHAN & MAIRANG C&RD BLOCK Presented by: Smt. Jopilin L. Nonglait Programme Manager, FFDA Directorate of Fisheries, Shillong

2 MAIRANG BLOCK 1. Christian UP School, Nongkasen Remarks:
Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) Bundh Crest width >1.5M Bottom width < 3 M Slope 1:1 Depth < 1 M Overflow pipe 2-4 inch Drain pipe 8 inch Percentage of completion 100 Remarks: They will try to raise the pond depth. Previously the pond size is less but now they have constructed another two small ponds to meet the specification.

3 MAIRANG BLOCK 2. Shri Emkwingshon Marngar, Nongkasen Remarks:
Name of the scheme Value Chain Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed 0.12 Ha Pond identification Number (PIN) Bundh Crest width 1-1.5M Bottom width < 5 M Slope 1:1 Depth 1-1.5 M Overflow pipe No overflow Drain pipe 8 inch Percentage of completion 100 Remarks: He has already constructed 6 ponds but 3 are meant for value chain. Seed had been stocked with own expenditure, still waiting for the Departmental fish seed.

4 MAIRANG BLOCK 3. Shri Bankitbok Lyngkhoi, Nongkasen Remarks:
Name of the scheme Value Chain Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed 0.12 Ha Pond identification Number (PIN) Bundh Crest width > 1.5M Bottom width > 5 M Slope 1:1 Depth 1-1.5 M Overflow pipe No overflow Drain pipe 4-6 inch Percentage of completion 50 Remarks: Work is in progress, only first installment received.

5 MAIRANG BLOCK 4. Smti. Triansinoris Iawphniaw, Langlew Remarks:
Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) Bundh Crest width > 1.5M Bottom width < 3 M Slope 1:1 Depth 1-1.5 M Overflow pipe No overflow Drain pipe 4-6 inch Percentage of completion 100 Remarks: Fish seeds had been stocked borne from her own expenditure. Still waiting for the Departmental fish seed.

6 MAIRANG BLOCK 5. Shri. Kesparlin Syiemlieh, Marngor Remarks:
Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed 0.15 Ha Pond identification Number (PIN) Bundh Crest width > 1.5M Bottom width > 5 M Slope 1:1 Depth > 1.5 M Overflow pipe No overflow Drain pipe 4-6 inch Percentage of completion 100 Remarks: Fish seeds had been stocked with own expenditure, 2nd installment received, loan has not clear yet.

7 MAIRANG BLOCK 6. Shri Hoben Sohshang, Marngor Remarks:
Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) Bundh Crest width > 1.5 M Bottom width > 5 M Slope 1:1 Depth Overflow pipe No overflow Drain pipe 4-6 inch Percentage of completion 100 Remarks: Fish seeds had been stocked with own expenditure, 2nd installment received, pond constructed through diversion of the river.

8 MAIRANG BLOCK 7. Shri Finder Lyngdoh, Langlew Remarks:
Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed 0.2 Ha Pond identification Number (PIN) Bundh Crest width > 1.5 M Bottom width 3-5 M Slope 1:1 Depth Overflow pipe No overflow Drain pipe 4-6 inch Percentage of completion 100 Remarks: There is no water in the pond due to leakage, therefore he constructed with cemented wall and work is in progress.

9 MAIRANG BLOCK 8. Shri Welphang Marngar, Laitkseh Remarks:
Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) Bundh Crest width > 1.5M Bottom width > 5 M Slope 2:1 Depth 1-1.5 M Overflow pipe No overflow Drain pipe 4-6 inch Date of stocking Percentage of completion 100 Remarks: He conveyed the message to the Department to extend the supply of feed and fertilizers in the second year also.

10 MAIRANG BLOCK 9. Shri Ristarkhos Marngar, Laitkseh Remarks:
Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) Bundh Crest width 1-1.5M Bottom width < 3 M Slope 1:1 Depth 1-1.5 M Overflow pipe 4-5 inch Drain pipe 4-6 inch Date of stocking Percentage of completion 100 Remarks: The water quality is good since he followed what he learnt from the training given to him. He is ready to construct another pond with his own expenditure.

11 MAIRANG BLOCK 10. Shri Spailin Sohlang, Markasa Remarks:
Name of the scheme Value Chain Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) Bundh Crest width > 1.5 M Bottom width > 5 M Slope 1:1 Depth 1-1.5 M Overflow pipe 4-5 inch Drain pipe 4-6 inch Percentage of completion 100 Remarks: The pond is situated in the market place; his interest is to convert it into a tourist spot.

12 MAWTHADRAISHAN BLOCK 11. Shri Planningstar Lyngdoh Mawnai, Mawroh
Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) Bundh Crest width 1-1.5 M Bottom width 3-5 M Slope 1:1 Depth Overflow pipe 2-4 inch Drain pipe Not yet installed Percentage of completion 80 Remarks: The farmer takes interest on pond construction even though the subsidy could not meet his excess expenditure. Pond reconstructed with cement since the wall collapse due to penetration of water.

13 MAWTHADRAISHAN BLOCK 12. Smt. Drelin Jana, Mawroh Remarks:
Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) Bundh Crest width 1-1.5 M Bottom width 3-5 M Slope 1:1 Depth Overflow pipe 4-5 inch Drain pipe 4-6 inch Percentage of completion 100 Remarks: Water quality is good since application of cow dung is followed up properly. She wanted to expand her pond little bit bigger. Waiting for the departmental seed.

14 MAWTHADRAISHAN BLOCK 13. Smt. Mali Nongbri, Mawlumkohkhrang Remarks:
Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed 0.4 Ha Pond identification Number (PIN) Bundh Crest width > 1.5 M Bottom width 3-5 M Slope 1:1 Depth Overflow pipe No overflow Drain pipe 4-6 inch Percentage of completion 100 Remarks: Stocked with 2 quintal of Fish seed purchased from Umsning. Still waiting for the departmental seed since the pond is already exceed 0.1 ha.

15 MAWTHADRAISHAN BLOCK 14. Smt. Jrolmai Jana, Phudbah Son in photo
Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed 0.38 Ha Pond identification Number (PIN) Bundh Crest width > 1.5 M Bottom width > 5 M Slope 2:1 Depth Overflow pipe No overflow Drain pipe 4-6 inch Percentage of completion 100 Remarks: Stocked with 2 quintal of Fish seed from own expenditure.

16 MAWTHADRAISHAN BLOCK 15. Shri Stendro Rani, Phudbah Remarks:
Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) Bundh Crest width > 1.5 M Bottom width > 5 M Slope 1:1 Depth Overflow pipe 2-4 inch Drain pipe 4-6 inch Percentage of completion 100 Remarks: He cleared up the bank loan immediately.

17 MAWTHADRAISHAN BLOCK 16. Shri Richardpower Lyngdoh Mawnai, Mawshut
Grand father in photo Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) Bundh Crest width > 1.5 M Bottom width 3-5 M Slope 1:1 Depth 1-1.5 M Overflow pipe 2-4 inch Drain pipe 8 inch Percentage of completion 100 Remarks: Fish seeds had been stocked borne from own expenditure. Still waiting for the departmental seed.

18 MAWTHADRAISHAN BLOCK 17. Smt. Patricia Lyngdoh Mawnai, Mawshut
Husband in photo Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) Bundh Crest width > 1.5 M Bottom width > 5 M Slope 1:1 Depth 1-1.5 M Overflow pipe > 5 inch Drain pipe 4-6 inch Percentage of completion 100 Remarks: Fish seeds had been stocked borne from her own expenditure, repayment of loan is completed.

19 MAWTHADRAISHAN BLOCK 18. Smt. Krossmolin Ryntathiang, Langstiehrim
Husband in photo Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) Bundh Crest width 1-1.5 M Bottom width 3-5 M Slope 1:1 Depth Overflow pipe 2-4 inch Drain pipe No drain pipe Percentage of completion 100 Remarks: 250 kg of Fish seeds had been stocked borne from her own expenditure, now there many fingerlings hatched from the old brood fish; she also contributed table sized fish during the 1st Aqua fest. Water quality is good.

20 MAWTHADRAISHAN BLOCK 19. Smt. Wahidir Wahlang, Sangshong Remarks:
Husband in photo Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) Bundh Crest width 1-1.5 M Bottom width 3-5 M Slope 1:1 Depth Overflow pipe 4-5 inch Drain pipe 4-6 inch Percentage of completion 100 Remarks: Fish seeds had been stocked borne from her own expenditure, repayment of loan is completed.

21 MAWTHADRAISHAN BLOCK 20. Shri Bakerlang Marbaniang, Sangshong Remarks:
Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed 0.88 Ha Pond identification Number (PIN) Bundh Crest width - Bottom width Slope Depth Overflow pipe No overflow Drain pipe 4-6 inch Percentage of completion 80 Remarks: Repayment of loan is completed; the cost of labour is more since the pond is quite big.