Presentation is loading. Please wait.

Presentation is loading. Please wait.

Renewable Energy as Priority

Similar presentations


Presentation on theme: "Renewable Energy as Priority"— Presentation transcript:

1 CombiPlus Inverter/Charger 18KW, 36KW & 54KW, 72KW, 90KW 3-Phase AC Load

2 Renewable Energy as Priority
ATS AC Input AC Output AC / DC Charger Inverter Solar Charger Wind Charger

3 Grid, Solar PV & Wind Hybrid Systems
ATS AC Output AC Input AC / DC Charger Inverter Solar Charger Wind Charger

4 Three Phase Capability
Parallel Operation Virtually unlimited power thanks to parallel operation up to 5 units can operate in parallel to achieve higher power output. Five CP units, for example, provide 30KW of output power. Three Phase Capability In addition to parallel connection, three units of the same model can be configured for three-phase output. But that’s not all: up to five sets of three units can be parallel connected for a huge 90KW inverter!

5 Max 5 units for one phase, and 15 units for three phases

6 18KW 3-Phase AC Load Systems 6KW 1-Phase AC Load Systems
CP x 3 pcs With 3-phase connection package L N R L N R – S – T : 18KW 3-Phase R – N : 6KW 1-Phase S – N : 6KW 1-Phase T – N : 6KW 1-Phase S L N T N

7 18KW 3-Phase AC Load Systems
Renewable Energy as Priority Grid power is used only when the batteries are over discharged or the sufficient solar energy is not available from the PV array. If PV power is available it should be directed to the load and the excess power will be used for charging the batteries.

8 18KW 3-Phase AC Load Systems
Please setup the CombiPlus into Mode 3 First, the battery bank is charged from renewable energy when you use the enough PV array or other renewable energy, not from grid power. Second, please setup the L.V.D. (Low Voltage Detection) Third, when the battery bank reaches the L.V.D., the grid power will charge it by AC/DC charger which is included on the CombiPlus. Fourth, concurrently the grid power will supply electricity to AC loads by ATS which is included on the CombiPlus.

9 UP to 90Kw System If the CombiPlus inverter/charger has to connect with PV modules and wind turbines, you have to procure MPPT chargers because the battery can be charged from grid power, diesel generator, solar PV modules and wind energy.


Download ppt "Renewable Energy as Priority"

Similar presentations


Ads by Google