Presentation is loading. Please wait.

Presentation is loading. Please wait.

Supply Chain Update September 18 th, 2014. Contract is up with Arjo Huntleigh. Will be trialing Covidien pumps and sleeves on 5W & BICU/SICU Please fill.

Similar presentations


Presentation on theme: "Supply Chain Update September 18 th, 2014. Contract is up with Arjo Huntleigh. Will be trialing Covidien pumps and sleeves on 5W & BICU/SICU Please fill."— Presentation transcript:

1 Supply Chain Update September 18 th, 2014

2 Contract is up with Arjo Huntleigh. Will be trialing Covidien pumps and sleeves on 5W & BICU/SICU Please fill out an evaluation form if you come into contact with the pumps, Indicating if you would like to switch to the covedian pumps or stay with Arjo Huntleigh Covedian Product for trial (above) ** Start Sept 22nd  Current product *** We are looking to trial, for potential cost savings as well as to see if nursing prefers the new option.

3 Flo Cap CO2– Respiratory Therapy NEW Products For use with cont. nebulilzer admin. We currently use standard syringe and IV tubing Oral/nasal O2 cannula with CO2 measurement ** Resp. Therapy

4 TRIALS IN PROGRESS Anchorfast Guard SCD’s (previous slide) NICOM NICOM – MICU & CICU AnchorGuard - Respiratory Therapy

5 Backorders https://mymuhealth.org/body.cfm?id=4696&fr=true https://mymuhealth.org/body.cfm?id=4696&fr=true (Backorder Report) Sterile Field 10cc flush syringes Greiner Bio-One needle 25g x 0.75 Subbed with BD butterfly, off backorder but not yet on PAR’s. Lab Marker – No expected end date Bicard Liquid Naturalyte – no expected end date CSF access kit- being sub by a cranial kit – (same kit without NS and Xylocaine) end date unknown.

6 Sentinel Event Alert 53 Tubing misconnections continue to cause severe patient injury and death, since tubes with different functions can easily be connected using luer connectors, or connections can be “rigged” (constructed) using adapters, tubing or catheters. This is why new ISO (International Organization for Standardization) tubing connector standards are being developed for manufacturers.

7 Managing risk of tubing misconnections during the transition to new ISO connector standards

8

9

10

11

12 Managing risk of tubing misconnections during while we are waiting for the transition to new ISO connector standards

13

14

15 © The Joint Commission, 2014. Reprinted with permission.

16 As we move toward the tubing/connector standardization we must remain alert to issues we see. When an issue is identified please report as a PSN and it will be reviewed by safety and purchasing for resolution and information sharing to mitigate potential problems.

17 See FAQs at stayconnected2014.org Other questions can be addressed to: Ashley Selby - selbya@health.missouri.com Carey Smith - smithcd@health.missouri.edu Donna Ianke - ianked@health.missouri.edu Sue Scott - scotts@health.missouri.edu


Download ppt "Supply Chain Update September 18 th, 2014. Contract is up with Arjo Huntleigh. Will be trialing Covidien pumps and sleeves on 5W & BICU/SICU Please fill."

Similar presentations


Ads by Google