Presentation is loading. Please wait.

Presentation is loading. Please wait.

Supply Chain Update November 20 th, 2014. SCD trial Completed and staying with Arjo Huntleigh! Yearly savings $166,000.

Similar presentations


Presentation on theme: "Supply Chain Update November 20 th, 2014. SCD trial Completed and staying with Arjo Huntleigh! Yearly savings $166,000."— Presentation transcript:

1 Supply Chain Update November 20 th, 2014

2 SCD trial Completed and staying with Arjo Huntleigh! Yearly savings $166,000

3 Medline’s Comfort Glide System For patients<500lbs New Bari System coming out in December Trial began October 22nd

4 Convatech’s Adhesive Releaser. (5015540) Placing on PAR’s $24.32/can ** Wipe down with a purple wipe when using on multiple patients. **Contents are sterile, if sprayed within a sterile container, you can use in the OR. Easily and rapidly releases appliances or dressings adhered with adhesive Helps minimize trauma to patient with “No Touch” removal Helps minimize skin stripping that causes pain

5 KCI Wound Vacs ** New protocol, we will store pumps in house, and will need to be wiped down in house, start December 1 st. Yearly Savings $85,000 TAB’s Alarm Control Units Install date Nov 19 th -21 st. Potential Education dates of December 3 rd.

6 Vacutainer’s All lab tubes will now come from distribution, with some placed on PAR locations This will help to control the expired lab tubes and keep us in compliance with our accrediting bodies. New education will be coming out that the lab put together regarding tube color and labs draws associated with them


Download ppt "Supply Chain Update November 20 th, 2014. SCD trial Completed and staying with Arjo Huntleigh! Yearly savings $166,000."

Similar presentations


Ads by Google